Loading...
HomeMy WebLinkAbout20040838 Ver 6_Site Plan_201201234 t 4 ' �FST O NST N sTolfohxll °`cFV OAFS "1 CITY OF RALEIGH NORTH CAROLINA NEUSE RIVER TRAILS WALNUT CREEK INDEX OF SHEETS 1 1A 1B THRU 1C 2 THRU 2D 2E THRU 2K 3 3A THRU 3E 4 THRU 12 X -1 THRU X -13 TITLE SYMBOLOGY SHEET NOTES TYPICAL SECTIONS & DETAILS LANDSCAPE PLANS DRAINAGE & PROPERTY SUMMARIES EARTHWORK SUMMARY, SIGNING SUMMARY AND DETAILS PLAN & PROFILE SHEETS CROSS SECTIONS z LOCATION: F -Y1- FROM WORTHDALE PARK ti J w wl TO NEW HOPE ROAD p o 'po oC o W a oC ' TYPE OF WORK: W w W -Y 1- ce a- GRADING, PAVING, STRUCTURE, DRAINAGE, Q O U o = "��l VICINITY MAP EROSION CONTROL LANDSCAPING WB- STA. 11 +70.00 = _ Yl- STA. 18 + 70.70 ~ � � W z O z END CONSTRUCTION J TIE TO EXISTING TRAIL , Q BEGIN CONSTRUCTION TIE TO EXISTING TRAIL -Ll- STA. 10+17.55 WORTHDALE 4 PARK v -L1- -Ll- STA. 33 +73.57 � -L2- t lu 0 DC 0 i N�� =O V _ 1 (D BEGIN CONSTRUCTION w ° ° g0 TIE TO EXISTING TRAIL w w N 11 BOTTOM - -LJ3- -LJ2- 11 TOP _U1_ 50 25 0 50 100 PLANS GRAPHIC SCALES 50 25 0 50 100 PROFILE (HORIZONTAL) 10 5 0 10 20 4" 1 1 1 PROFILE (VERTICAL) -1-2- STA. 1"'0 + 00.00 �j, w RF w °` cry F Cif L a '1 � z ALIGNMENT EQUALITY g S� a �I/Ny POC STA. 54 + 44.51 -1-2- _ B� POC STA. 10 + 00.00 -WB- o�'R �q0 DESIGN DA TA DESIGN SPEED = 20 MPH LEAN ANGLE = 15 DEGRESS FUNC. CLASSIFICATION = GREENWAY END PROJECT...... - END CONSTRUCTION -WB- A. 15 +20.00 PROJECT LENGTH LENGTH OF GREENWAY = 1.390 MILES LENGTH OF BOARDWALK = 0.000 MILES LENGTH OF BRIDGE = 0.000 MILES LENGTH OF PROJECT = 1.390 MILES PRELIMINARY PLANS I D® NOT USE FOR CONSTRUCTI ®N DATE: NOVEMBER 23, 2011 REVISIONS: NO. DATE PROJECT NO.: H9001.00 1 F- L r= F Lu Lu v w ~ z z z z J Q g Q� k kD g Q Q UN ^ Q O ^ LL Q Q � � 1 w L 1z ' Lu Y Y� w w w w 0 00 0 0 < N N D QJ a u a m z ~ w w Y U ® ®�� d d�o o o En ����� � �w z LOCATION: F -Y1- FROM WORTHDALE PARK ti J w wl TO NEW HOPE ROAD p o 'po oC o W a oC ' TYPE OF WORK: W w W -Y 1- ce a- GRADING, PAVING, STRUCTURE, DRAINAGE, Q O U o = "��l VICINITY MAP EROSION CONTROL LANDSCAPING WB- STA. 11 +70.00 = _ Yl- STA. 18 + 70.70 ~ � � W z O z END CONSTRUCTION J TIE TO EXISTING TRAIL , Q BEGIN CONSTRUCTION TIE TO EXISTING TRAIL -Ll- STA. 10+17.55 WORTHDALE 4 PARK v -L1- -Ll- STA. 33 +73.57 � -L2- t lu 0 DC 0 i N�� =O V _ 1 (D BEGIN CONSTRUCTION w ° ° g0 TIE TO EXISTING TRAIL w w N 11 BOTTOM - -LJ3- -LJ2- 11 TOP _U1_ 50 25 0 50 100 PLANS GRAPHIC SCALES 50 25 0 50 100 PROFILE (HORIZONTAL) 10 5 0 10 20 4" 1 1 1 PROFILE (VERTICAL) -1-2- STA. 1"'0 + 00.00 �j, w RF w °` cry F Cif L a '1 � z ALIGNMENT EQUALITY g S� a �I/Ny POC STA. 54 + 44.51 -1-2- _ B� POC STA. 10 + 00.00 -WB- o�'R �q0 DESIGN DA TA DESIGN SPEED = 20 MPH LEAN ANGLE = 15 DEGRESS FUNC. CLASSIFICATION = GREENWAY END PROJECT...... - END CONSTRUCTION -WB- A. 15 +20.00 PROJECT LENGTH LENGTH OF GREENWAY = 1.390 MILES LENGTH OF BOARDWALK = 0.000 MILES LENGTH OF BRIDGE = 0.000 MILES LENGTH OF PROJECT = 1.390 MILES PRELIMINARY PLANS I D® NOT USE FOR CONSTRUCTI ®N DATE: NOVEMBER 23, 2011 REVISIONS: NO. DATE PROJECT NO.: H9001.00 1 BOUNDARIES AND PROPERTY State Line - - - -- County Line -- Township Line City Line Reservation Line Property Line Existing Iron Pin Property Corner Property Monument Parcel /Sequence Number Existing Fence Line O D 123 CONVENTIONAL Proposed Woven Wire Fence Proposed Chain Link Fence Proposed Barbed Wire Fence Existing Wetland Boundary - - - -WLB- - - - Proposed Wetland Boundary WLB Existing Endangered Animal Boundary EAB Existing Endangered Plant Boundary EPB BUILDINGS AND OTHER CULTURE: Gas Pump Vent or U/G Tank Cap o wcR Existing Telephone Pole S Sign N� W Well Small Mine 0 Foundation 0 Area Outline Cemetery F T Building T Designated LYG Telephone Cable (S.U.E. *) - School Recorded U/G Telephone Conduit Church Designated LYG Telephone Conduit (S.U.E. *)- - - - -TC- - - - Recorded U/G Fiber Optics Cable Dam Designated LYG Fiber Optics Cable (S.U.E.*)- - HYDROLOGY.• Stream or Body of Water Hydro, Pool or Reservoir Jurisdictional Stream Buffer Zone 1 Buffer Zone 2 100 Year Flood Plain 500 Year Flood Plain Floodway Flow Arrow Disappearing Stream Crrirn vrw....7a Wetland Proposed Lateral, Tail, Head Ditch False Sump PLAN RAILROADS: Standard Gauge RR Signal Milepost Switch RR Abandoned RR Dismantled RIGHT OF WAY.- Baseline Control Point Existing Right of Way Marker 0 Existing Right of Way Line Proposed Right of Way Line n Proposed Right of Way Line with R Iron Pin and Cap Marker Proposed Right of Way Line with R Concrete or Granite Marker Existing Control of Access Proposed Control of Access Existing Easement Line E Existing Greenway Easement Line -- -- -- Proposed Temporary Construction Easement - Proposed Permanent Greenway Easement Proposed Permanent Drainage Easement Proposed Permanent Drainage /Utility Easement Proposed Permanent Utility Easement Proposed Temporary Utility Easement Proposed Permanent Easement with Iron Pin and Cap Marker ROADS AND RELATED FEATURES: Existing Edge of Pavement Existing Curb — Limits of Disturbance - Proposed Slope Stakes Cut - - - C - - - Proposed Slope Stakes Fill - - - F - - - Temporary Silt Fence Temporary Tree Protection Fence � Temporary Combination Tree -x Protectiorv'Silt Fence -E- PGE PDE DUE PUE TUE O is BZ 1 BZ 2 100 - 500 FW - < -- - -- <- FLGW Proposed Wheel Chair Ramp Existing Metal Guardrail Proposed Guardrail Existing Cable Guiderail Proposed Cable Guiderail Equality Symbol Pavement Removal —X -X- SHEET SYMBOLS PEGETATION.- Single Tree Single Shrub Hedge Woods Line Orchard Vineyard EXISTING STRUCTURES: MAJOR: Bridge, Tunnel or Box Culvert Bridge Wing Wall, Head Wall and End Wall - MINOR: Head and End Wall Pipe Culvert Footbridge Drainage Box: Catch Basin, DI or JB Paved Ditch Gutter Storm Sewer Manhole Storm Sewer UTILITIES: POWER: Existing Power Pole Proposed Power Pole Existing Joint Use Pole Proposed Joint Use Pole Power Manhole Power Line Tower Power Transformer U/G Power Cable Hand Hole H -Frame Pole Recorded UVG Power Line Designated U/G Power Line (S.U.E. *) 0 � M J Vineyard CONC ) CONC WW CONC HW CB O s i b HH H P - - - -P- - - - TELEPHONE: wcR Existing Telephone Pole N r T T T Proposed Telephone Pole N� T T T T Telephone Manhole O n n n Telephone Booth 0 n n n n Telephone Pedestal ❑D Telephone Cell Tower U/G Telephone Cable Hand Hole HH Recorded U/G Telephone Cable T Designated LYG Telephone Cable (S.U.E. *) - - - -T- - - - Recorded U/G Telephone Conduit TG Designated LYG Telephone Conduit (S.U.E. *)- - - - -TC- - - - Recorded U/G Fiber Optics Cable T FO Designated LYG Fiber Optics Cable (S.U.E.*)- - - - -T FO- - - - WATER: Water Manhole Water Meter o Water Valve Water Hydrant Recorded UAG Water Line W Designated U/G Water Line (S.U.E.* ) - - - -W____ Above Ground Water Line A/G Water TV: TV Satellite Dish C TV Pedestal ILI TV Tower U/G TV Cable Hand Hole Iq Recorded LPG TV Cable TV Designated U/G TV Cable (S.U.E. *) - - - -TV- - - - Recorded LPG Fiber Optic Cable TV FO Designated U/G Fiber Optic Cable (S.U.E. *)-- - - - -TV FO- - - GAS: Gas Valve Gas Meter Recorded LPG Gas Line Designated U/G Gas Line (S.U.E. *) Above Ground Gas Line SANITARY SEWER: Sanitary Sewer Manhole Sanitary Sewer Cleanout U/G Sanitary Sewer Line Above Ground Sanitary Sewer Recorded SS Forced Main Line Designated SS Forced Main Line (S.U.E. *) MISCELLANEOUS: Utility Pole Utility Pole with Base Utility Located Object Utility Traffic Signal Box Utility Unknown U/G Line U/G Tank Water, Gas, Oil AEG Tank Water, Gas, Oil U/G Test Hole (S.U.E. *) Abandoned According to Utility Records End of Information 0 -G- - -G- - - - A/G Gas O O SS- A/G Sanitary Sewer FSS - - - -FSS- - - - • D 0 ❑s 0 0 m AATU R E.0.1. i W W DC U Z J a 0 �o �Q �o ww Q O D s z � � w O z 3: H N r E N� N C'4 CO r= v i � LU LU z wg =C')M w d0 z N z J 01 m T U) LL L W 0 1- 4 � a a w � a z III Z cn z z J a g Q� � � � N Q w = z LL a ,1 in w O Y w D w C9 a < as N N u J Q a M z I--I U w `) Y U U O w ® I z U i W W DC U Z J a 0 �o �Q �o ww Q O D s z � � w O z 3: PRELIMINARY PLANS I D® NOT USE FOR CONSTRUCTI ®N DATE: NOVEMBER 23, 2011 REVISIONS: 1 NO. I DATE 1 PROJECT NO.: H9001.00 SCALE: NTS N r E N� N C'4 CO LJ� i � U z wg =C')M ��Ur MM LL d0 z N z J 01 m T U) LL L W 0 W � a a w � a ♦^ VJ V) z a PRELIMINARY PLANS I D® NOT USE FOR CONSTRUCTI ®N DATE: NOVEMBER 23, 2011 REVISIONS: 1 NO. I DATE 1 PROJECT NO.: H9001.00 SCALE: NTS GENERAL NOTES THE CONTRACTOR SHALL PERFORM ALL CONSTRUCTION ACTIVITIES IN ACCORDANCE WITH THE APPLICABLE REQUIREMENTS OF THE JULY 2006 NCDOT STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES. UNLESS NOTED OTHERWISE IN THESE PLANS OR ASSOCIATED SPECIFICATIONS ALL DEMOLITION SHALL BE APPROVED BY CITY OF RALEIGH INSPECTIONS DEPARTMENT. ALL DEMOLITION AND SUBSEQUENT CONSTRUCTION TO BE IN ACCORDANCE WITH PERMITS ISSUED AND APPLICABLE STATE, COUNTY, AND LOCAL CODES. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL INSPECTIONS, CERTIFICATIONS, PERMITS, EQUIPMENT, ETC. THAT MAY BE REQUIRED. WHERE ASPHALT SECTION IS REMOVED, CONTRACTOR SHALL USE A SAW CUT AT THE LIMITS OF DEMOLITION TO OBTAIN A CLEAN EDGE. ALL TREE PROTECTION FENCING SHALL BE INSTALLED PRIOR TO LAND DISTURBANCE OPERATIONS INCLUDING TREE REMOVAL, IN SUCH A MANNER AS TO CLEARLY AND ADEQUATELY SEPARATE ALL TREES TO BE REMOVED FROM REMAINING VEGETATION. CONTACT CITY OF RALEIGH PARKS AND RECREATION DEPARTMENT TO SET UP A PRE - CONSTRUCTION MEETING PRIOR TO LAND DISTURBANCE. TREE PROTECTION FENCING CAN AND SHOULD BE INSTALLED PRIOR TO PRE - CONSTRUCTION MEETING. NO GRADING IS TO OCCUR IN THE TREE PROTECTION AREAS OR TREE CRITICAL ROOT ZONES. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL INSPECTIONS, CERTIFICATIONS, EQUIPMENT, ETC. THAT MAY BE REQUIRED. THE CONTRACTOR MUST, AT ALL TIMES, KEEP THE PREMISES FREE FROM ACCUMULATIONS OF WASTE MATERIALS OR RUBBISH CAUSED BY HIM, HIS EMPLOYEES, OR HIS WORK. ALL DEBRIS SHALL BE REMOVED FROM THE SITE ON A DAILY BASIS. RELOCATION OF EXISTING UTILITIES TO BE COORDINATED WITH THE LOCAL UTILITY PROVIDER(S). EXISTING UTILITIES AND STRUCTURES SHOWN BOTH UNDERGROUND AND ABOVE ARE BASED ON THE BEST AVAILABLE RECORD DRAWINGS. THE CONTRACTOR SHALL VERIFY FIELD CONDITIONS PRIOR TO BEGINNING RELATED CONSTRUCTION. ANY DISCREPANCIES SHALL BE REPORTED TO THE OWNER'S REPRESENTATIVE IMMEDIATELY. CONTRACTOR SHALL LOCATE ALL UTILITIES AND UTILITY ELEVATIONS PRIOR TO CONSTRUCTION. ALL UTILITIES TO REMAIN SHALL BE PROTECTED BY THE CONTRACTOR. ANY UTILITIES DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED BY CONTRACTOR. CONTRACTOR SHALL RESTORE ALL LAY DOWN AND STAGING AREAS TO ORIGINAL CONDITIONS AND TO THE SATISFACTION OF THE OWNER, PRIOR TO DEMOBILIZATION AT THE CONCLUSION OF THE PROJECT. ANY EXCAVATION MUST BE FILLED IN AND TAMPED AT THE CONCLUSION OF EACH WORK PERIOD, AND EQUIPMENT AND SUPPLIES RETURNED TO THE CONSTRUCTION STAGING AREA. CONSTRUCTION /SAFETY FENCING REMOVED TO FACILITATE ACCESS BY THE CONTRACTOR FOR CONSTRUCTION MUST BE REPLACED AT THE END OF EACH WORK PERIOD TO DIRECT PEDESTRIAN TRAFFIC AWAY FROM HAZARDOUS AREAS. DEMOLITION, AND SUBSEQUENT CONSTRUCTION OF STORM DRAINAGE FACILITIES SHALL BE PERFORMED IN SUCH A MANNER THAT THE OLD PIPE AND STRUCTURES ARE REMOVED AND NEW STRUCTURES AND PIPING ARE IMMEDIATELY PUT INTO SERVICE. CONTRACTOR SHALL ENSURE THAT STORM DRAINAGE DOES NOT REMAIN OUT OF SERVICE FOR LONGER THAN 12 HOURS AT A TIME. PROVISIONS SHALL BE MADE TO MAINTAIN STORM WATER DRAINAGE DURING CONSTRUCTION. CONTRACTOR SHALL STAKE CENTERLINE OF TRAIL ACCORDING TO PLANS AND OBTAIN APPROVAL FROM OWNER'S REPRESENTATIVE PRIOR TO CONSTRUCTION. ANY DISCREPANCIES SHALL BE RESOLVED PRIOR TO CONSTRUCTION MEETING. STATIONING IS APPROXIMATE. CONTRACTOR SHALL VERIFY ALL STATIONING FOR APPLICABILITY TO EXISTING CONDITIONS PRIOR TO CONSTRUCTION. DEVIATION FROM ALIGNMENT DUE TO LARGE TREES OR OTHER OBSTACLES ETC SHALL BE APPROVED BY CITY OF RALEIGH. CONTRACTOR SHALL MAINTAIN ALL ABOVE AND BELOW GROUND STORM WATER DRAINAGE AND PATTERNS AND PIPING AS THEY CURRENTLY EXIST UNLESS NOTED OTHERWISE. ANY DISTURBANCE OF THE PATTERNS OR STRUCTURES BY THE CONTRACTOR SHALL BE CORRECTED BY THE CONTRACTOR TO CONDITION PRIOR TO DISTURBANCE. CLEAN OUT STORM WATER PIPE ONLY IF NOTED ON PLAN AND ACCORDING TO DETAIL. CONTRACTOR ACCESS FOR TRAIL CONSTRUCTION SHALL BE CONFIRMED BY CONTRACTOR WITH OWNER'S REPRESENTATIVE AND PROPERTY OWNER PRIOR TO CONSTRUCTION. CONTRACTOR SHALL REVIEW TREE REMOVAL WITH OWNER'S REPRESENTATIVE AND OBTAIN APPROVAL PRIOR TO TREE REMOVAL. CONTRACTOR SHALL REMOVE ALL VEGETATION TO 3' BEYOND ASPHALT EDGE OF TRAIL OR WITH IN REQUIRED DRAINAGE DITCHES. TRIM UP BRANCHES OF TREES TO PROVIDE 8' VERTICAL CLEARANCE. ALL CONSTRUCTION SHALL COMPLY WITH CITY OF RALEIGH STANDARDS. CONTRACTOR SHALL PROVIDE SILT FENCING IN ALL AREAS AND EROSION CONTROL MEASURES AS NEEDED OR DIRECTED BY THE EROSION CONTROL INSPECTOR. IF ADDITIONAL MEASURES ARE REQUIRED IN ADDITION TO THE PLANS, COMPENSATION WILL BE PROVIDED PER THE CONTRACT PROVISIONS. ALL DISTURBED AREAS THAT WILL BE IDLE 14 DAYS OR LONGER SHALL BE SEEDED BY CONTRACTOR. NOTES THE ENGINEER AND OR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND METHODS ASSOCIATED WITH PROJECT AS SET FORTH IN THESE PLANS. IF DEPARTURES FROM THE SPECIFICATIONS OR DRAWINGS ARE DEEMED NECESSARY BY THE CONTRACTOR, DETAILS OF SUCH DEPARTURES AND REASONS THEREOF SHALL BE SUBMITTED TO THE OWNER IN WRITING FOR REVIEW. NO DEPARTURES FROM THE CONTRACT DOCUMENTS SHALL BE MADE WITHOUT THE WRITTEN PERMISSION OF THE OWNER. SEQUENCE OF CONSTRUCTION ACTIVITIES 1. A PRECONSTRUCTION CONFERENCE MUST BE HELD PRIOR TO THE START OF ANY CONSTRUCTION ACTIVITIES. A MANDATORY PRE - CONSTRUCTION MEETING WILL ALSO BE REQUIRED WITH THE LAND QUALITY SECTION OF NCDENR BEFORE LAND DISTURBING ACTIVITIES BEGIN. CALL 919 - 791 -4200 TO SCHEDULE A MEETING. 2. INSTALL CONSTRUCTION ENTRANCES AS NEEDED AT LOCATIONS SHOWN ON SHEET 1 D. OTHER STAGING AREAS WILL NEED TO BE DISCUSSED WITH CITY OF RALEIGH PRIOR TO THE START OF CONSTRUCTION. CONTACT THE CITY OF RALEIGH AT (919)516 -2837. 3. DETERMINE AND MARK LIMITS OF DISTURBANCE. 4. INSTALL TREE PROTECTION FENCING, SILT FENCE, COMBINATION FENCE AND, SILT FENCE OUTLETS. SILT FENCE OUTLETS SHALL BE INSTALLED PER FIELD LOCATED LOW POINTS AND AS SHOWN ON APPROVED PLANS. 5. CLEAR ONLY AS NECESSARY TO INSTALL THESE DEVICES. CALL FOR ON SITE INSPECTION BY ENVIRONMENTAL INSPECTOR AND OBTAIN CERTIFICATE OF COMPLIANCE. 6. TOPSOIL AND STONE BASE REMOVAL AND /OR STORAGE AREAS SHALL BE CONTAINED WITHIN THE PROPOSED LIMITS OF DISTURBANCE. 7. BEGIN GRADING & CLEARING AND GRUBBING. MAINTAIN DEVICES AS NEEDED. ROUGH GRADE SITE. INSURE THAT SEDIMENT LADEN WATER IS DIRECTED TO SEDIMENT CONTROL DEVICES. 8. INSPECT AND MAINTAIN ALL EROSION CONTROL MEASURES EVERY 7 DAYS AND AFTER EACH SIGNIFICANT RAINFALL (0.5 INCHES OR GREATER) AND DOCUMENT WITH INSPECTION REPORTS. 9. PLACE TEMPORARY SEEDING ON ALL DISTURBED AREAS THAT WILL BE IDLE 14 DAYS OR LONGER. 10. INSTALL STORM SEWER SYSTEMS AND CULVERTS AND PROTECT INLETS WITH INLET PROTECTION. INSTALL CULVERTS IN JURISDICTIONAL AREAS ACCORDING TO NCDOT BEST MANAGEMENT PRACTICES FOR CONSTRUCTION AND MAINTENANCE ACTIVITIES MANUAL. CULVERT INSTALLATIONS IN STREAMS WILL REQUIRE DEWATERING BY USE OF COFFER DAMS /IMPERVIOUS DIKES AND PUMPS TO MAINTAIN WATER QUALITY STANDARDS, PER DETAIL ON SHEET 2C. CULVERT TO BE CONSTRUCTED IN THE DRY. CONTRACTOR TO COORDINATE WITH EROSION CONTROL INSPECTOR. ANY TEMPORARY COFFER DAM SHALL BE CONSTRUCTED OF MATERIALS SUCH AS SHEET PILING, SANDBAGS OR CLEAN CLASS 1 RIP RAP OR LARGER STONE THAT WILL NOT CONTRIBUTE TO TURBIDITY OR SILTATION OF THE WATER BODY. A TEMPORARY SEDIMENTATION BAG SHALL BE USED PER NCDOT STANDARD DRAWING NUMBER 1630.06. SANDBAGS SHALL BE OF THE FILTER FABRIC TYPE, DOUBLE BAGGED AND INDIVIDUALLY TIED TO PREVENT SAND LEAKAGE. THEY SHALL BE PLACED AND REMOVED MANUALLY TO PREVENT SPILLAGE. ONLY CLEAN SAND, FREE OF DEBRIS, SILT, FINE PARTICLES OR OTHER FOREIGN SUBSTANCES, SHALL BE USED TO FILL THE BAGS. THE COFFERDAM SHALL BE ENTIRELY REMOVED IMMEDIATELY UPON COMPLETION OF WORK. DURING PERIODS OF WORK ACTIVITY, FLOW IMMEDIATELY DOWNSTREAM OF THE WORKSITE SHALL EQUAL FLOW IMMEDIATELY UPSTREAM OF THE WORKSITE. ALL OTHER OPTIONS WILL NEED PRIOR APPROVAL. SEE SHEET 2C FOR DETAIL. NO DIRECT PAYMENT SHALL BE MADE FOR THE WORK OF INSTALLATION, MAINTENANCE, AND REMOVAL OF IMPERVIOUS DIKE(S) AS DESCRIBED IN THIS PROVISION. PAYMENT FOR SUCH WORK SHALL BE DISTRIBUTED AMONG THE VARIOUS PAY ITEMS. 11. AS AREAS ARE BROUGHT UP TO FINISH GRADE, SPREAD TOPSOIL OVER ALL AREAS TO RECEIVE TURF OR LANDSCAPING. SEED ALL AREAS WITHIN 14 DAYS OF COMPLETING ACTIVITY. PERMANENT GRASS SHALL BE INSTALLED FOR ALL AREAS AT FINAL GRADE AND IN SEASON. FERTILIZE, WATER AND RESEED AS REQUIRED TO ESTABLISH AND MAINTAIN A VIGOROUS STAND OF GRASS. 12. AFTER COMPLETION OF CONSTRUCTION AND THE SITE IS STABILIZED, REMOVE ALL ACCUMULATED SEDIMENT FROM SEDIMENT TRAPPING MEASURES AND SPREAD EVENLY ACROSS THE SITE. THEN REMOVE TEMPORARY EROSION CONTROL MEASURES, SMOOTH AREA AND APPLY APPROPRIATE GRASS. 13. WHEN VEGETATION HAS BECOME ESTABLISHED, CALL FOR FINAL SITE INSPECTION BY ENVIRONMENTAL OFFICER. OBTAIN CERTIFICATE OF COMPLIANCE. 14. CONTRACTOR IS REQUIRED TO MAINTAIN A WEEKLY WRITTEN REPORT OF SEDIMENT AND EROSION CONTROL DEVICES. H Lu Lu (D Z z Z J QLu k g I..L U 'y N Q Q Lu u 00 OID iL:Ue v! 3: W 2 � rn 3 Lu N D J < O d N (n m a z w U `) Y U o Ln w 0 J I--I 0 � 0 � Q °C o LJJ < r)C Lu W w J a U Q o D _ D W z o z J � Q m 0 W �c a w a V) Z a N� N 0 LJ� Lu J co U N Lo � CO U m H Zcoocoo, C(j wg =c')m z 'IT (5 MM d0 � J 01 N Z q U) LL_ W V) IW NARY PLANS] Q• D® N ®'P" USQ•, R CONSTRUCT— DATE: NOVEMBER 23, 2011 REVISIONS: 1 NO. I DATE 1 IPROJECT NO.: H9001.00 t NOTES EROSION CONTROL NOTES TOTAL ACREAGE OF DISTURBED AREA IS 21.83 ACRES, TOTAL PROJECT AREA IS 1,901.26 ACRES. ACREAGE OF PERMANENT AND TEMPORARY SEEDING IS 35.8 ACRES. SEE CONTRACT DOCUMENTS AND SHEET 2D FOR SEEDING SPECIFICATIONS. ON -SITE BURIAL PITS ARE NOT ACCEPTABLE. ANY GRADING BEYOND THE LIMITS SHOWN ON THE PLAN IS A VIOLATION OF THE STATE /COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO FINE. STABILIZATION IS THE BEST FORM OF EROSION CONTROL. TEMPORARY SEEDING IS NECESSARY TO ACHIEVE EROSION CONTROL IN LARGE DENUDED AREAS AND ESPECIALLY WHEN SPECIFICALLY REQUIRED AS PART OF THE CONSTRUCTION SEQUENCE SHOWN ON THE PLAN. ALL GRADED SLOPES MUST BE SEEDED AND MULCHED WITHIN 14 CALENDAR DAYS OF COMPLETION OF GRADING. DURING UNSUITABLE GROWING SEASONS, MULCH WILL BE USED AS A TEMPORARY COVER ON SLOPES THAT ARE 4:1 OR STEEPER, MULCH WILL BE ANCHORED. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A LOCAL REPRESENTATIVE OF THE STATE /COUNTY STORM WATER MANAGEMENT SECTION AND THE LOCAL INSPECTIONS DEPARTMENT. CONSTRUCTION, MAINTENANCE, REMOVAL OF ALL EROSION CONTROL DEVICES, ALL FINES, LEGAL FEES AND RESTORATION COSTS ARE THE RESPONSIBILITY OF THE CONTRACTOR UNLESS OTHERWISE NOTED. A COPY OF THE APPROVED PLANS MUST BE ON FILE AT THE JOB SITE. CONTRACTOR SHALL OBTAIN A COPY OF EACH SUBSURFACE INVESTIGATION REPORT AND FOLLOW THE RECOMMENDATIONS OR AS DIRECTED FOR GRADING, COMPLETION AND PAVEMENT DESIGN, ETC. EROSION PROVISION THE CONTRACTOR SHALL BE REQUIRED TO TAKE EVERY REASONABLE PRECAUTION THROUGHOUT THE CONTRACT TO PREVENT THE EROSION OF SOIL AND THE SEDIMENTATION OF STREAMS, LAKES, RESERVOIRS, OTHER WATER IMPOUNDMENTS, GROUND SURFACES, OR OTHER PROPERTY AS REQUIRED BY THE SEDIMENT POLLUTION CONTROL ACT OF 1973 AND THE 1974 AMENDMENTS TO THE ACT. FAILURE ON THE PART OF THE CONTRACTOR TO COMPLY WITH THE PROVISIONS OF THE EROSION CONTROL PLAN OR TO PERFORM EROSION CONTROL WORK AS DIRECTED WILL RESULT IN THE ENGINEER, INSPECTOR OR NCDENR NOTIFYING THE CONTRACTOR TO COMPLY WITH THESE PROVISIONS. IN THE EVENT THAT THE CONTRACTOR FAILS TO BEGIN SUCH REMEDIAL ACTION OR FAILS TO BEGIN EROSION CONTROL WORK WITHIN 24 HOURS AFTER RECEIPT OF SUCH NOTICE WITH ADEQUATE FORCES AND EQUIPMENT, THE ENGINEER MAY PROCEED TO HAVE THE WORK PERFORMED WITH OTHER FORCES. NO PAYMENT WILL BE MADE TO THE CONTRACTOR FOR WORK PERFORMED BY OTHERS. ANY COSTS INCURRED BY THE CITY DUE TO THE FAILURE OF THE CONTRACTOR TO COMPLY WITH THESE PROVISIONS WILL BE BORNE BY THE CONTRACTOR. SUCH COSTS WILL INCLUDE CIVIL PENALTIES ASSESSED FOR SOIL EROSION AND SEDIMENTATION CONTROL VIOLATIONS. ANY COSTS INCURRED BY THE CITY FOR WORK PERFORMED BY OTHERS AS PROVIDED ABOVE IN THE EXCESS OF THE COSTS THAT WOULD HAVE BEEN INCURRED HAD THE WORK BEEN PERFORMED BY THE CONTRACTOR WILL BE DEDUCTED FROM RETAINAGE OR OTHER MONIES DUE THE CONTRACTOR OR HIS CONTRACT. MISC - WETLANDS. TREES. STORM PIPING CONTRACTOR TO VERIFY ACTUAL WETLAND BOUNDARY IN THE FIELD PRIOR TO CONSTRUCTION OF BOARDWALK. WETLAND LOCATION WILL DETERMINE BOARDWALKS STARTING /STOPPING LOCATION. ALL DISTURBED AREAS TO BE OVERSEEDED WITH APPROVED MIX. CONTRACTOR SHALL MAINTAIN A WETLAND SEEDING MIX ON SITE TO BE APPLIED TO TEMPORARILY DISTURBED WETLAND AREAS AS DIRECTED BY ENGINEER IN THE FIELD. WETLAND SEED MIX IS PROVIDED IN THE SPECIFICATIONS IN SECTION 02910. WETLAND LOCATION /DELINEATION BY ESI DATED 12/2006 LOCATION OF PIPING FOR DITCHES IS APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY LOCATION AND MATCH PIPING TO DITCH CENTERLINE. SAVE ALL PROMINENT EXISTING TREES PLUS EXISTING TREES AS FLAGGED. IF JUDGMENT IS REQUIRED, CONTACT DESIGNER FOR FIELD ADJUSTMENT. IF EGREGIOUS VIOLATIONS OCCUR AS DETERMINED BY THE OWNER, REPLANTING MAY BE ORDERED AT A COMPENSATORY RATE AT THE CONTRACTORS EXPENSE. H (D LU H � z Z m Z o J Q� Uj � g COMPACTION NOTES Ce Q U STRUCTURAL FILL BENEATH THE PAVED AREAS SHOULD BE PLACED IN UNIFORM LIFTS OF 8 INCHES OR LL � � 8 z T w LESS (LOOSE MEASURE), AND COMPACTED TO AT LEAST 95 PERCENT OF MAXIMUM DRY DENSITY AND 06 W � _ ^ � WITHIN 2 PERCENT OF THE OPTIMUM MOISTURE AS DEFINED BY THE STANDARD PROCTOR COMPACTION Y � W ° � TEST. HOWEVER, THE UPPER 12 INCHES OF THE FILL PLACED SHOULD BE COMPACTED TO 98 PERCENT a N m Cn ° z OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY. TO CONFIRM THAT THE SPECIFIED DEGREE OF Uj COMPACTION IS OBTAINED, FIELD DENSITY TESTING SHOULD BE PERFORMED IN EACH LIFT BY A SOILS U � TECHNICIAN. U o 2006 NCDOT ROADWAY ENGLISH STD. DRAWINGS o THE FOLLOWING ROADWAY STANDARDS AS APPEAR IN "ROADWAY STANDARD DRAWINGS" HIGHWAY DESIGN ®� �® BRANCH - N.C. DEPARTMENT OR TRANSPORTATION - RALEIGH, N.C., DATED JULY 187 2006 ARE APPLICABLE TO THIS PROJECT AND BY REFERENCE HEREBY ARE CONSIDERED A PART OF THESE PLANS: STD.NO. TITLE DIVISION 2 - EARTHWORK J 200.02 Method of Clearing - Method II DIVISION 3 - PIPE CULVERTS 0 300D.01 Method of Pipe Installation - Method 'A' 0 DIVISION 8 INCIDENTALS O 838.01 Concrete Endwall for Single and Double Pipe Culverts - 15" thru 48" Pipe 90° Skew rlC 838.80 Precast Concrete Endwall - For Single 12" thru 72" Pipe 900 Skew LJ,J d- 848.01 Concrete Sidewalk LJ.J LV LV 876.01 Rip Rap in Channels I:e J a 876.02 Guide for Rip Rap at Pipe Outlets U Q 0 876.04 Drainage Ditches with Class 'B' Rip Rap Q = ADDITIONAL NCDOT STANDARDS NOT ON THE LIST ABOVE MAY BE REQUIRED AS PER PLAN DETAILS AND SPECIFICATIONS. D oC W z 0 z J � Q SEEDING A. ACCOMPLISH SEEDING BY MEANS OF AN APPROVED POWER -DRAWN SEED DRILL, COMBINATION CORRUGATED ROLLER - SEEDER, APPROVED HAND OPERATED MECHANICAL SEEDER, OR OTHER APPROVED METHODS TO PROVIDE EVEN DISTRIBUTION OF SEED. B. DO NOT SEED WHEN GROUND IS EXCESSIVELY WET OR EXCESSIVELY DRY. AFTER SEEDING, ROLL AREA WITH A ROLLER, NOT LESS THAN 18 INCHES IN DIAMETER AND WEIGHING NOT MORE THAN 210 POUNDS PER FOOT OF WIDTH. UPON COMPLETION OF ROLLING, WATER AREA WITH A FINE SPRAY. C. IMMEDIATELY FOLLOWING SEEDING APPLY MULCH OR MATTING. DO NOT SEED AREAS IN EXCESS OF THAT WHICH CAN BE MULCHED ON SAME DAY. D. APPLY WATER WITH A FINE SPRAY IMMEDIATELY AFTER EACH AREA HAS BEEN MULCHED. SATURATE TO 4 INCHES OF SOIL DEPTH. m 0 W �c a w a V) Z a N� N LU 0 I.J. (D N _ � H U Z U w °o(Do � Ur C') M MM 3 � d0 N z LL !.: J m O) 2 04 Z) g �_ q U) H i LL LL w V) jw� MULCHING AND MATTING A. APPLY MULCH OR MATTING AS REQUIRED TO RETAIN SOIL AND GRASS, BUT NO LESS THEN THE FOLLOWING: PRELIMINARY PLANS 1. SLOPES FROM 5:1 OR FLATTER BY SPREADING A LIGHT COVER OF MULCH OVER SEEDED AREA AT THE D® NOT USE FOR CONSTRUCTION RATE OF NOT LESS THAN 92 LBS. PER 1000 SQ.FT. 2. SLOPES GREATER THAN 5:1 MULCH WITH MATTING. PIN MATTING TO THE GROUND WITH WIRE STAPLES AT 5 FOOT INTERVALS, IMMEDIATELY AFTER SEEDING. 3. USE TACK TO PREVENT DISRUPTION OF MULCH. B. FOR TACK USE AN ASPHALT TIE -DOWN OF EMULSIFIED ASPHALT GRADE AE -E OR CUT -BACK ASPHALT ff NOVEMBER 23, 2011 GRADE RC -2 OR OTHER APPROVED EQUAL. AN APPROVED JUTE MESH OR NET MAY BE USED IN LIEU OF IONS: TACKING STRAW MULCH. DATE C. OTHER TYPES OF MULCH AND ANCHORING METHODS MAY BE USED UPON APPROVAL BY THE ENGINEER. ALL STORM PIPING SHALL BE HDPE DBL WALL- SMOOTH INTERIOR EXCEPT WERE OTHERWISE NOTED. SEE DRAINAGE SUMMARY SHEET. D. EXCELSIOR MATTING SHALL MEET NCDOT STANDARD SPECIFICATIONS AND SHALL BE INSTALLED PER PROJECT NO.: APPROVED PLANS. ON ALL STORM PIPING, BURY INVERTS ONLY AS NEEDED. H9001.00 CMP PIPING SHALL HAVE ASPHALT COATING INSIDE AND OUT WHEN DESIGNATED (SEE SPECS). PROTECTION SCALE: NTS ALL PROPOSED CONCRETE WALKWAYS, ASPHALT TRAILS, ETC. WILL BE CONSTRUCTED TO EXISTING A. PROTECT SEEDED AREAS FROM DAMAGE BY BARRICADES, SIGNS, AND OTHER GRADES UNLESS OTHER WISE NOTED ON THE PROFILE. APPROPRIATE MEANS. MAINTAIN AND PROTECT SLOPES FROM WEATHER- DAMAGE. 1 C I , I 4 I I SHLD.I I I I ORIGINAL GROUND -2 - I I I I I I I I I I I I I I I I , INSET 1 � I USE INSET 1 WHEN 3' 3' SHLD. CONDITIONS PERMIT I I I I I I ORIGINAL GROUND 6:1 MAX- I I kjqI I TI I 18" I 5' i 5' i GRADE POINT 0.02 i 0.02 � V1 6' SHLD. 4'W/ SAFETY RAIL 7 3' POTENTIAL Cl SAFETY RAIL =MAX. GRADE TO THIS LINE( T ASPHALT TRAIL TYPICAL SECTION NOTES: - TRANSITION SUPERELEVATION AS SHOWN ON PLANS - TYP. DISTANCE IS 101 . - USE 6' SHOULDER IN FILL SECTIONS AND 3' SHOULDER IN CUT SECTIONS. H BEGIN STATION END STATION PROVIDE A SAFETY RAIL FOR THE (D PAVEMENT SCHEDULE uj (BEGIN CONSTRUCTION) 10 +17.55 24 +48.17 w FOLLOWING CIRCUMSTANCES: W Z u) -L1- (SUNNYBROOK ROAD) 25 +25.85 33 +73.57 z SLOPE >_ 3:1 AND DROP OF 6' J Q UJ -1-2- % (BEGIN CONSTRUCTION) 10 +00.00 54 +44.51 a SLOPE >_ 2:1 AND DROP OF 4' p� u Q -WB- (BEGIN CONSTRUCTION) 10 +00.00 15 +20.00 (END CONSTRUCTION) SLOPE >_ 1:1 AND DROP OF 1' LL � ,� u z 00 T w O 06 U) ULU (BEGIN CONSTRUCTION) 10 +00.00 18 +70.70 L 0 ce a N N �; u QJ a p1 m � S PROPOSED 5" CONCRETE SIDEWALK z ,� U T EARTH MATERIAL. w `) V1 GEOTEXTILE SEPERATOR FABRIC Y U °� U O Ln ORIGINAL GROUND I 1' SHLD. 2.5' i z w i ORIGINAL GROUND o > i GRADE NOTES: - TRANSITION SUPERELEVATION AS SHOWN ON PLANS - TYP. DISTANCE IS 101 . - USE 6' SHOULDER IN FILL SECTIONS AND 3' SHOULDER IN CUT SECTIONS. L.'p L. m W a a w a V) z a i mii m w w U Z J a 0 �o �Q �o ww Q O D s z � � w O z 3: N 0 LJ� Lu i N � C'4 CO H z co � Z U > <-Tomm 3 ��Ur MM d0 Z LL J 01 ' 2 2sZ f/1 H u- 5 LL w ntnv J PRELIMINARY PL�1�� I D® NOT USE FOR C®NS'1C$UCTI ®N DATE: NOVEMBER 23, 2011 REVISIONS: NO. DATE IPROJECT NO.: H9001.00 z NTS CHAIN BEGIN STATION END STATION PAVEMENT SCHEDULE -L1- (BEGIN CONSTRUCTION) 10 +17.55 24 +48.17 (SUNNYBROOK ROAD) -L1- (SUNNYBROOK ROAD) 25 +25.85 33 +73.57 (END CONSTRUCTION) PROPOSED APPROX. 2" ASPHALT CONCRETE SURFACE -1-2- (BEGIN CONSTRUCTION) 10 +00.00 54 +44.51 (EQUALITY) Cl COURSE, TYPE S9.513, AT AN AVERAGE RATE OF 224 LBS. -WB- (BEGIN CONSTRUCTION) 10 +00.00 15 +20.00 (END CONSTRUCTION) PER SQ. YD. -Y1- (BEGIN CONSTRUCTION) 10 +00.00 18 +70.70 (TIE TO -WB -) J1 PROPOSED 6" AGGREGATE BASE COURSE. S PROPOSED 5" CONCRETE SIDEWALK T EARTH MATERIAL. V1 GEOTEXTILE SEPERATOR FABRIC 1' SHLD. 2.5' i 2.5 WIDTH VARIES i ORIGINAL GROUND i GRADE POINT $ �X 6:1 MAX. 02 i 02 6.1 MAX T i GRADE TO THIS LINE a 5" ; T ORIGINAL GROUND TYPICAL SECTION #2 CHAIN BEGIN STATION -LJ1- (BEGIN CONSTRUCTION) 10 +00.00 11 +15.75 (END CONSTRUCTION) -LJ2- (BEGIN CONSTRUCTION) 10 +18.97 14 +27.27 (END CONSTRUCTION) -LJ3- (BEGIN CONSTRUCTION) 10 +14.31 13 +49.96 (END CONSTRUCTION) L.'p L. m W a a w a V) z a i mii m w w U Z J a 0 �o �Q �o ww Q O D s z � � w O z 3: N 0 LJ� Lu i N � C'4 CO H z co � Z U > <-Tomm 3 ��Ur MM d0 Z LL J 01 ' 2 2sZ f/1 H u- 5 LL w ntnv J PRELIMINARY PL�1�� I D® NOT USE FOR C®NS'1C$UCTI ®N DATE: NOVEMBER 23, 2011 REVISIONS: NO. DATE IPROJECT NO.: H9001.00 z NTS DESIGN CRITERIA NOTES 8' MAX. VARIABLE AS DIRECTED BY THE ENGINEER STEEL FENCE POST THE DRAINAGE AREA IS LIMITED TO ONE HALF ACRE. 1. PLACE STONE TO THE LINE AND DIMENSION SHOWN IN THE PLAN CD w Lu w WIRE FENCE KEEP A MAXIMUM HEIGHT OF 2 FEET AT THE CENTER OF ON A FILTER FABRIC FOUNDATION. HARDWARE CLOTH THE DAM. 2. KEEP THE CENTER STONE SECTION AT LEAST 9 INCHES BELOW J O ,� g KEEP THE CENTER OF THE CHECK DAM AT LEAST 9 INCHES NATURAL GROUND LEVEL WHERE THE DAM ABUTS THE CHANNEL w a MIN. 12 -1/2 GA. NCDOT SEDIMENT CONTROL STONE LOWER THAN THE OUTER EDGES AT NATURAL GROUND BANKS. ELEVATION. 3. EXTEND STONE AT LEAST 1.5 FEET BEYOND THE DITCH BANK TO w MIN. 10 GA. SILT FENCE FABRIC INTERMEDIATE :,; U Q 0 LINE WIRES INSTALLED TO SECOND j %� ; WIRES 3 FILTER FABRIC ON GROUND KEEP THE SIDE SLOPES OF THE DAM AT 2:1 OR FLATTER KEEP WATER FROM CUTTING AROUND THE ENDS OF THE CHECK U w z z cv z WIRE FROM TOP ENSURE THAT THE MAXIMUM SPACING BETWEEN DAMS DAM. LL H '-' 'n w U) o = w PLACES THE TOE OF THE UPSTREAM DAM AT THE SAME 4. SET SPACING BETWEEN DAMS TO ASSURE THAT THE ELEVATION O °� w tD ^o a GRADE ELEVATION AS THE TOP OF THE DOWNSTREAM DAM. AT THE TOP OF THE LOWER DAM IS THE SAME AS THE TOE Y w w ao STABILIZE OUTFLOW AREAS ALONG THE CHANNEL TO ELEVATION OF THE UPPER DAM. a N OF UPPER EDGE OF BURY 6" RESIST EROSION. 5. PROTECT THE CHANNEL AFTER THE LOWEST CHECK DAM FROM a N V rn z BURY WIRE FENCE AND HARDWARE CLOTH FILTER FABRIC IN TRENCH USE NCDOT CLASS B RIP RAP AND LINE THE UPSTREAM HEAVY FLOW THAT COULD CAUSE EROSION. H w FRONT VIEW SECTION VIEW SIDE OF THE DAM WITH NCDOT SEDIMENT CONTROL STONE. 6. MAKE SURE THAT THE CHANNEL REACH ABOVE THE MOST KEY THE STONE INTO THE DITCH BANKS AND EXTEND IT UPSTREAM IS STABLE. U U) U BEYOND THE ABUTMENTS A MINIMUM OF 1.5 FEET TO 7. ENSURE THAT OTHER AREAS OF THE CHANNEL, SUCH AS CULVERT 6�0�� 4' MIN. SILT FENCE AVOID WASHOUT FROM OVERFLOW AROUND THE DAM. ENTRANCES BELOW THE CHECK DAMS, ARE NOT SUBJECT TO DAMAGE OR BLOCKAGE FROM DISPLACED STONES. ® ®�� e v m I a w NOTES: � 0 9 w - END OF SILT FENCE SHOULD BE TURNED UPHILL STEEL POST -SEE N.C. STATE DENR PRACTICE STANDARDS & SPECIFICATIONS WOVEN WIRE FABRIC TOP OF SILT FENCE �, 12" OF NCDOT SEDIMENT 9 MIN. 1.5' MIN CONTROL STONE �" 1.5 `- . ® II `�� ®� O U � ®�'� U > MUST BEAT LEAST 1' IS ALWAYS REQUIRED SEDIMENT FENCE SET FOR CONDITIONS WHERE PRACTICE APPLIES SILT FENCE GEOTEXTILE FABRIC ABOVE THE TOP OF THE WASHED STONE - :: *1 CLASS B RIP -RAP 4 „_..r , "° k CENTER T PLANNING CONSIDERATIONS & DESIGN CRITERIA. (HOWEVER FLOW - o _.... - FILTER CLOTH SHALL NOT RUN PARALLEL WITH THE TOE OF THE FENCE ). - FILL SLOPE - _ M _ Z FILTER CLOTH r (O N � a, CII * FOR REPAIR OF SILT FENCE FAILURES, USE No. 57 WASHED STONE " GRADE J:A ldd[ PLAN VIEW r FOR ANCHOR WHEN SILT FENCE IS PROTECTING CATCH BASIN. IN EACH CASE THE SILT FENCE IS TO BE PROPERLY ENTRENCHED &THE o 6" MIN. COVER * STONE SHALL BE AT A MINIMUM OF 16" ABOVE GRADE AT THE N OVER SKIRT BURY WIRE FENCE, FILTER FABRIC, CROSS- SECTION VIEW PURPOSE: TO REDUCE EROSION IN A CHANNEL BY REDUCING THE VELOCITY OF FLOW. L = THE DISTANCE SUCH THAT POINTS A AND B ARE OF EQUAL ELEVATION J DIRECTION OF FLOW & BETWEEN 60 - 45 DEGREES. ANCOR SKIRT AS DIRECTED * STEEL FENCE POST SET MAX 2' APART AND HARDWARE I�- CLOTH IN TRENCH DO NOT USE CHECK DAM IN INTERMITTENT OR PERENNIAL STREAMS. A B O BY ENGINEER. MIN. 18" INTO SOLID GROUND SEE DENR STANDARDS & SPECS. FOR COMPLETE DESIGN CRITERIA & '� L SIDE VIEW FRONTVIEW MAINTENANCE Q STANDARD TEMPORARY SILT FENCE 1 C.O.R. STD # 40.01 SILT FENCE OUTLET CHECK DAM SIDE VIEW O W W Lu W TYPE A TYPE B PIPE OUTLET TO FLAT AREA WITH NO DEFINED CHANNEL I:e J a O PIPE OUTLET TO WELL- DEFINED CHANNEL Q U o = ' x w w NOTES: FOOTING SIZE _ FAA w '4 p PIPE SIZE WIDTH DEPTH � � W B 15" - 24" 8" 12„ x o CHANNEL BOTTOM >24" 36" 12" 24" z o M ,. - 36 PLAN VIEW >3611- 54" 18" " PLAN VIEW 4 x DIAMETER 4 x DIAMETER "H ti T T r .;' FILTER FABRIC FILTER FABRIC FILTER FABRIC H = RIP RAP TO TOP OF PIPE (MAX. H = D +T) N E N SEE PLANS FOR QUANTITIES T = 15" CLASS 'I' RIPRAP Lu C) 0 1..1. SECTION A -A SEE PLANS FOR QUANTITIES T = 12" CLASS 'B' RIP RAP > N C) 04 C,3) o SECTION B -B � z o o c w °o = c) In 3 MM d0 PIPE OUTLET PROTECTION Z U- J 01 N m T c U W � u 4 ° w cea a a ♦^ V) z NOTES: NOTES: g 1. WARNING SIGNS TO BE MADE OF DURABLE, WEATHERPROOF MATERIAL. 2. LETTERS TO BE 3" HIGH MINIMUM, CLEARLY LEGIBLE AND SPACED AS DETAILED. WARNING SIGNS TO BE MADE OF DURABLE, WEATHERPROOF MATERIAL. 3. SIGNS SHALL BE PLACED AT 50' MAXIMUM INTERVALS. 4. PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. LETTERS TO BE 3" HIGH MINIMUM, CLEARLY LEGIBLE AND SPACED AS DETAILED. 5. FOR TREE PROTECTION AREAS LESS THAN 200' IN PERIMETER, PROVIDE NO LESS THAN ONE SIGN PER PROTECTION AREA. 6. ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC. SIGNS SHALL BE PLACED AT 50' MAXIMUM INTERVALS. 40" 7. MAINTAIN TREE PROTECTION FENCE THROUGHOUT DURATION OF PROJECT. PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. 8. ADDITIONAL SIGNS MAY BE REQUIRED BY CITY OF RALEIGH INSPECTIONS DEPARTMENT BASED ON ACTUAL FIELD CONDITIONS. 40" 9. PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. 10. FOR CONDITIONS WHERE PRACTICE APPLIES; PLANNING CONSIDERATIONS (HOWEVER FLOW SHALL NOT RUN PARALLEL _ FOR TREE PROTECTION AREAS LESS THAN 200' IN PERIMETER, PROVIDE NO LESS THAN ONE SIGN PER PROTECTION AREA. WITH THE FENCE) AND DESIGN CRITERIA. 11. END OF SILT FENCE NEEDS TO BE TURNED UPHILL. ih TREE PROTECTION AREA ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC. 'v 12. SEE N.C. STATE DENR PRACTICE & SPECIFICATION SEDIMENTS FENCE SECTION. 18" TREE PROTECTION AREA FOR CONDITIONS WHERE PRACTICE APPLIES; PLANNING CONSIDERATIONS. v 18" 13. SEE N.C. STATE DENR PRACTICE &SPECIFICATION SEDIMENTS FENCE SECTION. c (HOWEVER FLOW SHALL NOT RUN PARALLEL WITH THE FENCE) ih DO NOT ENTER MAINTAIN TREE PROTECTION FENCE THROUGHOUT DURATION OF PROJECT. _ ADDITIONAL SIGNS MAY BE REQUIRED BY CITY OF RALEIGH INSPECTIONS DEPARTMENT BASED ON ACTUAL c� DO NOT ENTER FIELD CONDITIONS. WARNING SIGN DETAIL PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. WARNING SIGN DETAIL 8' MAX. PRELIMINARY PLANS VARIABLE AS DIRECTED BY THE ENGINEER 8' MAX D® NOT USE FOR CONSTRUCPI ®N VARIABLE AS DIRECTED BY THE ENGINEER STEEL POST WARNING SIGN STEEL POST WIRE FABRIC WOVEN WIRE FABRIC TREE PROTECTION AREA WARNING SIGN WARNING SIGN SILT FENCE GEOTEXTILE FABRIC MIN. 10 GA. DO NOT ENTER LINE WIRES ORANGE, UV RESISTANT TREE PROTECTION AREA HIGH - TENSILE STRENGTH MIN. 12 -1/2 GA. POLY BARRICADE FABRIC (TYPICAL) INTERMEDIATE p WIRES MIN. 10 GA. LINE WIRES DO NOT ENTER _ _ o MIN. 12 -1/2 GA. b co DATE: NOVEMBER 23, 2011 q co FILL SLOPE SILT FENCE FABRIC INTERMEDIATE N WIRES " z io Z INSTALLED TO SECOND GRADE WIRE FROM TO REVISIONS: NO. DATE ..... Z� GRADE GRADE -11111 VIII VIII VIII VIII VIII VIII VIII VIII VIII VIII VIII VIII VIII VIII VIII VIII VIII VIII VIII VIII � _ = -11 =M- - VIII VIII =11111 -VIII VIII VIII VIII VIII VIII VIII VIII -VIII VIII -VIII -VIII VIII - VIII - VIII -VIII -VIII VIII VIII c 6" MIN. COVER i OVER SKIRT (V 1 -i � VIII „ I VIII VIII - ORANGE UV RESISTANT VIII - Illil PROJECT NO.. EXTEND WIRE 6 MIN. INTO TRENCH AND ANCHOR SKIRT AS VIII FRONT VIEW VIII _ VIII HIGH - TENSILE STRENGTH VIII VIII POLY BARRICADE FABRIC VIII �! �! DIRECTED BY ENGINEER * ��I = = I - (TYPICAL) - H9001.00 SIDE VIEW SIDE VIEW SCALE: NTS FOR FAILURES, ES, SILT FENCE FAILURES, USE USE COMBINATION SILT/ TREE PROTECTION FENCE No. 57 WASHED STONE. FRONT VIEW TREE PROTECTION FENCE FOR ANCHOR WHEN SILT C. 0. R. STD # 40.03 FENCE IS PROTECTING C. 0. R. STD # 40.04 NOTE: FOR TREE PROTECTION ONLY 2A CATCH BASIN. A B 61_LNI GENERALNOTES 1. ALL CONCRETE TO BE 3600 PSI COMPRESSIVE STRENGTH 2. TYPE OF PIPE TO BE USED IS 1 -5/8" MAX. O.D. BLACK IRON, LOW CARBON PIPE 3. ALL JOINTS TO HAVE Al /" FILLET WELD. 4. ALL METAL SHALL BE GALVANIZED PER SPECIFICATIONS. (_ ,l 42" �OR 48" SAFETY RA�IL Mnl 11 nCO /T /n x 'X' DIMENSION 42" SAFTEY RAIL: A = 1' -2" 48" SAFETY RAIL: A = 1' -4" STOP SIGN GREENWAY TRAIL HINGED BOLLARD BOULDER (TYP. SEE DETAIL BOULDERS TO ICE SUPPLIED BY CITY OF RALEIGH TRANSPORT AND PLACEMENT BY CONTRACTOR C) 6" YELLOW PAVEMENT MARKING 1/2" EXPANSION JOINT (SEE DETAIL 6, THIS SHEET) WHEN TIEING TO TIE TO EXISTING CONCRETE SURFACE N CONCRETE /ASHPALT 5FT RADIUS UNLESS OTHERWISE NOTED ---- - - - - -- T - - - - -- ---- - - - - -- y --------- - - - - -- - - -- ---- - - - - -- r-------------L----------------------------------------------------------1--------- PLAN VIEW 2' -6" SQUARE FOOTING HINGED BOLLARD & BOULDERS NOTE: BOULDERS PROVIDED BY THE CITY OF RALEIGH 51 CONSTRUCTION ENTRANCE POST! 5" SQ PO: POST CAP OPTIONS NOTES: U Lu E U 1. PUT SILT FENCE OR TREE PROTECTION FENCE UP TO EXISTING z= �o Q ENSURE CONSTRUCTION ENTRANCE IS USED. ROADWAY } w d0 N z 2. IF CONSTRUCTION ON THE SITES ARE SUCH THAT THE MUD 11/2" X 51/2" RAIL 0° c 1 IS NOT REMOVED BY THE VEHICLE TRAVELING OVER THE 4 cn STONE, THEN THE TIRES OF THE VEHICLE MUST BE D -n WASHED BEFORE ENTERING THE PUBLIC ROAD. 0 c �-n 14@11 30" U) Wcn :mn c -1 m 3. IF A PROJECT CONTINUES TO PULL MUD AND DEBRIS ON m' z --I z TO THE PUBLIC ROAD, THE GOVERNING AUTHORITY WILL g cn p Q� CLEAN THE AREA AND INVOICE THE FINANCIALLY zi m m RESPONSIBLE PERSON AS INDICATED ON THE FINANCIAL m RESPONSIBILITY FORM. PLAN N 25' OR FULL WIDTH � Lu OF PROPOSED STREET NEW CONSTRUCTION OR ENTRANCE, EXISTING ROADWAY WHICHEVER IS a 75' MIN. 25' MIN. GREATER. T w O 12" MIN. Y 6" MIN. w D w 00 FABRIC UNDER STONE 51 CONSTRUCTION ENTRANCE POST! 5" SQ PO: POST CAP OPTIONS = U U Lu E U LJ� J co N C"4) J m z= �o Q Lu Lu 10%" } w d0 N z 5 J m O) r6- At 2 GREENWAY ENTRANCE 6 "x 6" POST, S.Y.P. PRESSURE TREATED FOR GROUND CONTACT (SEE SPECS) TOP OF CONCRETE FOOTING TO DRAIN AWAY FROM BOLLARD L "' CONCRETE FOOTING 1" BEVEL @ 45° (TYP) STEEL PLATE HOLE FOR LOCK 1/2 " DIA. 4" GRAVEL BASE COMPACTED SUBGRADE PERMANENT BARRIER WOOD BOLLARD BOLLARDS R' -n,, (TR Tf) (TR 4 11 10 FT. UCTION TRAIL OBSTRUCTION WITHIN PAVEMENT MARKING 3 NOTE: SEE 2009 MUTCD HOLE FOR LOCK 1/2 " DIA. FINISH GRADE 611 311 Ya" 6 11X3" X %" STEEL BOLLARD 00 3 "X13 "XY2' 7Y4" STEELPLAI TACK WELD TYP. 7 1 "X10 "Sl LOCK P c'') 1" X 10" STE HINGE PIP BOLLARD STEEL PLATE << HINGE PIN' N CONCRETE A FOOTING 0) 2 -6 "X2- 6"X2' /A <. B LOCK PIN PLANc I SECTION A -A HINGED BOLLLARD 7' -7" FACE TO FACE ;AP 211 H U Lu E U LJ� J co N C"4) ;T r= v F- i H U Lu Lu 10%" zcoo,CCC) w °o =a°o oo° w d0 N z 5 J m O) 11/2" X 51/2" RAIL 1 4 1— a NOTES: 1. FENCE TO BE MASTER HALCO THREE -RAIL RANCH STYLE z 11 1 14@11 30" FENCE WITH NOMINAL 8' SECTION LENGTH FOOTING WIDTH TO BE (2X) POST WIDTH. MINIMUM DEPTH 30 ". DETAIL FOR WHITE VINYL FENCE 54" C cC c 1/14 N Y4 V 'TYI 3 "X6 Y4 "X STEEL PLA- 1114 TyI 2 "X1 1/2"X CHAIN LINK FENCE SECTION B -B O.D. TOP RAZE BALE CAP 3" O.D. GALVANIZED STEEL END POST 2 4' MESH GALVANIZED STEEL CHAIN LINK FABRIC WITH BLACK VINYL COATING 2" O.D. GALVANIZED STEEL _INE /INTERMEDIATE POST 5 4 X 4 TENSION BANDS WITH TENSION BAR AT ENDS AND CORNERS 156" O.D. TRUSS ROD WITH TURNBUCKLE (@ EQUAL START/STOP SECTION) TIES 24" O.C. ALONG TOP AND BOTTOM RAIL TENSION WIRE GROUND WIRE AS_ ;01 W W DC U Z J a ► 0 �o �Q �o ww Q O D s z � � w O z 3: H U Lu E U LJ� J co N C"4) CO r= v F- i H U Lu Lu zcoo,CCC) w °o =a°o oo° w d0 N z 5 J m O) 0 4 1— a a w a z 11 1 Z U) z z J O a g Q� %D N a � Lu a u Z ^ 00 LL a r-I T w O Y w D w 00 C9 a < a N N u QJ a m z I--I U w `) Y U U O En w ® I z O > AS_ ;01 W W DC U Z J a ► 0 �o �Q �o ww Q O D s z � � w O z 3: PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION f ATE: NOVEMBER 23, 2011 EVISIONS: NO. DATE PROJECT NO.: H9001.00 SCALE: NTS t U Lu E U LJ� J co N C"4) CO F- i H U � C(j zcoo,CCC) w °o =a°o oo° M M LL d0 N z 5 J m O) 0 w a a w a ♦^ V) z a PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION f ATE: NOVEMBER 23, 2011 EVISIONS: NO. DATE PROJECT NO.: H9001.00 SCALE: NTS t I I I I I I� PERVIOUS DIKE — EXISTING TERRAIN a TEMPORARY SEDIMENTATION BAG i H IMPERVIOUS DIKE: (j w i--i z W z U) z THE WORK COVERED BY THIS SECTION CONSISTS OF FURNISHING, INSTALLING, J ° g Lu �. MAINTAINING, AND REMOVING AN IMPERVIOUS DIKE FOR THE PURPOSE OF DIVERTING w U N NORMAL STREAM FLOW AROUND THE CONSTRUCTION SITE. THE CONTRACTOR SHALL w = z N Z CONSTRUCT AN IMPERVIOUS DIKE IN SUCH A MANNER APPROVED BY THE ENGINEER. L Lu THE IMPERVIOUS DIKE SHALL NOT PERMIT SEEPAGE OF WATER INTO THE CONSTRUCTION Y � w 0 c9 SITE OR CONTRIBUTE TO SILTATION OF THE STREAM. THE IMPERVIOUS DIKE SHALL Q N J o BE CONSTRUCTED OF AN ACCEPTABLE MATERIAL IN THE LOCATIONS NOTED ON THE a N �' z Lu PLANS OR AS DIRECTED BY THE ENGINEER. (> Y U ACCEPTABLE MATERIALS SHALL INCLUDE BUT NOT BE LIMITED TO SHEET PILES, a ®�� 16��� °� Q m SANDBAGS, AND /OR THE PLACEMENT OF AN ACCEPTABLE SIZE STONE LINED WITH POLYPROPYLENE OR OTHER IMPERVIOUS FABRIC. II o U U > EARTH MATERIAL SHALL NOT BE USED TO CONSTRUCT AN IMPERVIOUS DIKE WHEN IT IS IN DIRECT CONTACT WITH THE STREAM. NO DIRECT PAYMENT SHALL BE MADE FOR THE WORK OF INSTALLATION, MAINTENANCE, AND REMOVAL OF IMPERVIOUS DIKE(S) AND RELATED WORK AS DESCRIBED IN THIS PROVISION. PAYMENT FOR SUCH WORK SHALL BEDISTRIBUTED AMONG THE VARIOUS PAY J ITEMS. O 15 X 10 TEMPORARY SEDIMENTATION BAG`. L PUMP TO SEDIMENTATION BAG SLOPE DRAIN INLET G­TMCA \A InAAII/ NOTE: PROVIDE STABILIZED OUTLET TO STREAMBANK )RAIN DRAW DETAIL FOR CULVERT CONSTRUCTION AT WET STREAMS AND DITCHES TEMPORARY SEDIMENTATION BAG(S): �e 0 L.L THE WORK COVERED BY THIS SECTION CONSISTS OF FURNISHING, PLACING, AND Oct O REMOVING A TEMPORARY SEDIMENTATION BAG(S) AS DIRECTED BY THE ENGINEER. w a THE TEMPORARY SEDIMENTATION BAG(S) SHALL BE USED TO FILTER PUMPED WATER Lu DURING THE DRILLED PIER OPERATION, FOOTING EXCAVATION, AND /OR CULVERT OR w J a PIPE CONSTRUCTION. Q 0 U = THE FILTER FABRIC SHALL MEET THE REQUIREMENTS OF SECTION 1056 FOR TYPE 2 o FABRIC. 3 DC W SEDIMENT CONTROL STONE SHALL MEET THE REQUIREMENTS OF SECTION 1005 AND z O Z SHALL BE CLEAN OF DIRT AND DEBRIS. INSTALL STONE ACCORDING TO THE DETAIL j SHOWN ON THE PLANS. THE TEMPORARY SEDIMENTATION BAG(S) SHALL BE A WATER PERMEABLE FABRIC BAG THAT TRAPS SAND, SILT, AND FINES AS SEDIMENT LADEN WATER IS PUMPED INTO IT. THIS DEVICE SHALL BE CONSTRUCTED SUCH THAT IT IS PORTABLE AND CAN BE USED ADJACENT TO THE DRILLED PIER OPERATION, FOOTING EXCAVATION, AND /OR CULVERT OR PIPE CONSTRUCTION. THE TEMPORARY SEDIMENTATION BAG(S) SHALL BE A BAG CONSTRUCTED TO A MINIMUM SIZE OF 10'X 15' MADE FROM A NONWOVEN FABRIC. IT SHALL HAVE A SEWN -IN 8 w CD CD o J U � IN. (MAXIMUM) SPOUT FOR RECEIVING PUMP DISCHARGE. THE BAG SEAMS SHALL BE J ° o N �� N CD CN C O SEWN WITH A DOUBLE NEEDLE MACHINE USING A HIGH STRENGTH THREAD. THE SEAMS Z Q Lu SHALL HAVE A MINIMUM WIDE WIDTH STRENGTH AS FOLLOWS. � = M M a��i ' Lu �z LL J 01 N TEST METHOD MINIMUM SPECIFICATIONS m T c � U A E W ASTM D -4884 60 LB/IN W c � a THE FABRIC USED TO CONSTRUCT THE BAG SHALL BE STABILIZED TO PROVIDE RESISTANCE TO ULTRA- VIOLET DEGRADATION AND MEET THE FOLLOWING z SPECIFICATIONS FOR FLOW RATES, STRENGTH, AND PERMEABILITY: PROPERTY TEST METHOD UNITS MIN. SPECIFICATIONS SPECIFICATIONS WEIGHT ASTM D -3776 OZ/YD 8.0 GRAB TENSILE ASTM D -4632 LB 200.0 PUNCTURE ASTM D -4833 LB 130.0 FLOW RATE ASTM D -4491 GAL /MIN /SF 80.0 PERMITTIVITY ASTM D -4991 1 /SEC 1.2 UV RESISTANCE ASTM D -4355 % 70.0 THE CONTRACTOR SHALL INSTALL THE TEMPORARY SEDIMENTATION BAG IN ACCORDANCE WITH THE DETAILS IN THE PLANS AND AT LOCATIONS AS DIRECTED BY THE ENGINEER. PRELIMINARY PLANS D® NOT USE FOR CONSTRUCTI ®N THE TEMPORARY SEDIMENTATION BAG(S) SHALL BE PLACED SO THE INCOMING WATER FLOWS INTO AND THROUGH THE BAG WITHOUT CAUSING EROSION. THE NECK OR SPOUT OF THE BAG SHALL BE TIED OFF TIGHTLY TO STOP THE WATER FROM FLOWING OUT OF THE BAG WITHOUT GOING THROUGH THE WALLS. THE TEMPORARY SEDIMENTATION BAG(S) SHALL BE REPLACED AND DISPOSED OF WHEN DATE: NOVEMBER 23, 2011 IT IS 3/4 FULL OF SEDIMENT OR WHEN IT IS IMPRACTICAL FOR THE BAG TO FILTER REVISIONS: THE SEDIMENT OUT AT A REASONABLE FLOW RATE. PRIOR APPROVAL FROM THE NO. DATE ENGINEER MUST BE RECEIVED BEFORE REMOVAL AND REPLACEMENT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING A SUFFICIENT QUANTITY OF BAGS TO CONTAIN SILT FROM PUMPED EFFLUENT DURING THE DRILLED PIER OPERATION, FOOTING EXCAVATION, AND /OR CULVERT OR PIPE PROJECT NO.: CONSTRUCTION. H9001.00 STILLING BASINS WILL BE MEASURED AND PAID FOR PER EACH. THIS PAYMENT WILL BE FULL COMPENSATION FOR ALL WORK COVERED BY THIS PROVISION, INCLUDING BUT SCALE: NTS NOT LIMITED TO, FURNISHING ALL MATERIALS, PLACING AND MAINTAINING THE TEMPORARY SEDIMENTATION BAG(S), AND REMOVAL AND DISPOSAL OF SILT ACCUMULATIONS AND BAG. 2C OEM, Seeding mixture Species Rate (Iblacre) Rye (grain) 120 Annual lespedeza (Kobe in Piedmont and Coastal Plain, Korean in Mountains) 50 Omit annual lespedeza when duration of temporary cover is not to extend beyond June. Seeding dates Mountains—Above 2500 feet: Feb. 15 - May 15 Below 2500 feet: Feb. 1- May 1 Piedmont—Jan. 1 - May 1 Coastal Plain—Dec. I -Apr. 15 Soil amendments Follow recommendations of soil tests or apply 2,000 lb/acre ground agricultural limestone and 750 lb/acre 10-10-10 fertilizer. Mulch Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Refertilize if growth is not fully adequate. Reseed, refertilize, and mulch immediately following erosion or other damage. Seeding mixture Species' Rate (Iblacre) Tall fescue 80 Sericea lespedeza 20 Kobelespedeza 10 Seeding notes 1. After Aug. 15, use unscarified sericea seed. 2. Where periodic mowing is planned or a neat appearance is desired, omit sericea and increase Kobe lespedeza to 40 lb/acre. 3. To extend spring seeding dates into June, add 15 lb/acre hulled Bermudagrass. However, after mid-Apr. it is preferable to seed temporary cover. Nurse plants Between May 1 and Aug. 15, add 10 lb/acre German millet or 15 lb/ acre Sudangrass. Prior to May 1 or after Aug. 15, add 40 Iblacre rye (grain). Best Possible Fall: Aug. 25 - Sept. 15 Aug. 20 - Oct. 25 Late Winter: Feb. 15 - Mar. 21 Feb. 1 -Apr. 15 Fall is best for tall fescue and late winter for lespedezas. Overseeding of Kobe lespedeza over fall-seeded tall fescue is very effective. Soil amendments Apply lime and fertilizer according to soil tests, or apply 4,000 lb/acre ground agricultural limestone and 1,000 Iblacre 10-10-10 fertilizer. Mulch Apply 4,000 Iblacre grain straw or equivalent cover of another suitable mulch. Anchor straw by tacking with asphalt, netting, or roving or by crimping with a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Refertilize in the second year unless growth is fully adequate. May be mowed once or twice a year, but mowing is not necessary. Reseed, fertilize, and mulch damaged areas immediately. 'Refer to Appendix 8.02 for botanical names. Practice Standards and SpeCifiMdOnN Seeding mixture Species Rate (Iblacre) German millet 40 In the Piedmont and Mountains, a small-stemmed Sudangrass may be substituted at a rate of 50 lb/acre. Seeding dates Mountains—May 15 -Aug. 15 Piedmont —May's -Aug. 15 Coastal Plain—Apr. 15 -Aug. 15 Soil amendments Follow recommendations of soil tests or apply 2,000 Iblacre ground agricultural limestone and 750 lb/acre 10-10-10 fertilizer. Mulch Apply 4,000 Iblacre straw. Anchor straw bytacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. F M11 Practice Standards and SpecificationN Seeding mixture Species, Rate (lb/acre) Blend of two turf-type tall fescues (90%) and two or more improved Kentucky bluegrass varieties (10%) 200-250 Best Possible Fall: Aug. 25 - Sept. 15 Aug. 20 - Oct. 25 Winter: — Feb. I - Mar. 31 For quality turf, avoid spring seeding. Where grading is completed during late winter or spring, an alternative is to seed 30 lb/acre Kobe lespedeza, keep mowed, prepare seedbed, and seed a permanent mixture in early fall. Soil amendments Apply lime and fertilizer according to soil tests, or apply 4,000 lb/acre ground agricultural limestone and 1,000 lb/acre 10-10-10 fertilizer. Mulch Apply 4,000 lb/acre small grain straw or equivalent cover of another suitable mulch. Anchor straw by tacking with asphalt, netting, roving, or by crimping with a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Fertilize according to soil tests or apply 40 lb/acre nitrogen in Jan. or Feb., 40 lb in Sept., and 40 lb in Nov., from a 12-4-8, 16-4-8, or similar turf fertilizer. Avoid fertilizer applications during warm weather, as this increases stand losses to disease. Mow to a height of 2.5-3.5 inches as needed. Reseed, fertilize, and mulch damaged areas immediately. 'Refer to Appendix 8.02 for botanical names. 151st :4 AR J11111111:4111 Lk M 1 0 6.11.22 Seedin g mixture Species Rate (lb/acre) Rye (grain) 120 Seeding dates Mountains—Aug. 15 - Dec. 15 Coastal Plain and Piedmont—Aug. 15 - Dec. 30 Soil amendments Follow soil tests or apply 2,000 lb/acre ground agricultural limestone and 1,000 Ib/acr8 10-10-10 fertilizer. Mulch Apply 4,000 lb/acre straw. Anchorstraw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Repair and refertilize damaged areas immediately. Topdress with 50 lb/acre of nitrogen in March. If it is necessary to extent temporary cover beyond June 15, overseed with 50 lb/acre Kobe (Piedmont and Coastal Plain) or Korean (Mountains) lespedeza in late February or early March. I == ­ Best Possible Fall: Aug. 25 - Sept. 15 Aug. 20 - Oct. 25 Winter: — Feb. I - Mar. 31 For quality turf, avoid spring seeding. Where grading is completed during late winter or spring, an alternative is to seed 30 lb/acre Kobe lespedeza, keep mowed, prepare seedbed, and seed permanent mixture between Aug. 25 and Sept. 15. Soil amendments Apply lime and fertilizer according to soil tests or apply 4,000 lb/acre ground agricultural limestone and 1,000 lb/acre 10-10-10 fertilizer. Mulch Apply 4,000 lb/acre grain straw or equivalent cover of another suitable mulch. Anchor straw by tacking with asphalt, roving, netting, or by crimping with a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Fertilize according to soil tests or apply 40 lb/acre nitrogen in Jan. or Feb., 40 lb in Sept., and 40 lb in Nov., from a 12-4-8, 16-4-8, or similar turf fertilizer. Avoid fertilizer applications during warm weather, as this increases stand losses to disease. Reseed, fertilize, and mulch damaged areas immediately. Mow to a height of 2.5-3.5 inches as needed. 'Refer to Appendix 8.02 for botanical names. MIM.71ZZ 1,1 1'1�9010"% TEMPORARY AND PERMANENT SEEDING CHARTS CHARTS FROM NCDENR PRACTICE STANDARDS AND SPECIFICATIONS (REV 6/06) Seeding mixture Species' Rate (lb/acre) Tall fescue 100 Sericea lespedeza 30 Kobelespedeza 10 Seeding notes 1. In Eastern Piedmont, add 25 lb/acre Pensacola Bahiagrass or 10 lb/ acre common Bermudagrass. Use common Bermudagrass only where it is unlikely to become a pest. 2. After Aug. 15, use unscarified sericea seed. 3. Where a neat appearance is desired, omit sericea and substitute 40 lb/acre Bahiagrass or 15 lb/acre Bermudagrass. 4. To extend spring seeding dates into June, add 15 lb/acre hulled Bermudagrass. However, it is preferable to seed temporary cover and seed fescue in Sept. Nurse plants Between May I and Aug. 15, add 10 lb/acre German millet or 15 lb/ acre Sudangrass. Prior to May 1 or after Aug. 15, add 40 lb/acre rye (grain). Best Possible Fall: Aug. 25 - Sept. 15 Aug. 20 - Oct. 25 Late Winter: Feb. 15 - Mar. 21 Feb. 1 -Apr. 15 Fall is best for tall fescue, and lespedezas in late winter. Overseeding of Kobe lespedeza over fall-seeded tall fescue is very effective. Use unhulled Bermudagrass seed in fall. Soil amendments Apply lime and fertilizer according to soil tests or apply 4,000 lb/acre ground agricultural limestone and 1,000 lb/acre 10-10-10 fertilizer. Mulch Apply 4,000-5,000 Iblacre grain straw or equivalent cover of another suitable mulching material. Anchor mulch by tacking with asphalt, roving, or netting. Netting is the preferred anchoring method on steep slopes. Maintenance Refertilize in the second year unless growth is fully adequate. May be mowed once or twice a year, but mowing is not necessary. Reseed, fertilize, and mulch damaged areas immediately. Refer to Appendix 8.02 for botanical names. Few, I'm, Seeding mixture Species' Rate (Iblacre) Tall fescue 200 (4-5 lb/1,000 ft2) Nurse plants Between May 1 and Aug. 15, add 15 lb/acre Sudangrass or 15 lb/acre German millet. Prior to May 1 or after Aug. 15, add 40 lb/acre rye (grain). Seeding dates Best: Aug. 25 - Oct. Possible: Feb. -Apr. 15 Avoid seeding from Nov. to Jan. If seeding must be done at this time, add 40 lb/acre rye grain and use a channel lining that offers maximum protection. Soil amendments Apply lime and fertilizer according to soil tests, or apply 4,000 lb/acre ground agricultural limestone and 1,000 Iblacre 10-10-10 fertilizer. Operate tillage equipment across the waterway. Mulch Use a rolled erosion control product to cover the bottom of channels and ditches, and staple securely. The lining should extend above the highest calculated depth of flow. On channel side slopes above this height, and in drainages not requiring temporary linings, apply 4,000 lb/acre grain straw, and anchor straw by stapling netting over the top. Mulch and anchoring materials must not be allowed to wash down slopes where they can clog drainage devices. Maintenance Inspect and repair mulch frequently. Refertilize in late winter of the following year; use soil tests or apply 150 Iblacre 10-10-10. Mow regularly to a height of 2-4 inches. 'Refer to Appendix 8.02 for botanical names. (D LL 0 11-4 U ca 0 LU 0� < 0- Lu d a- V) Z LU LU Z to 0 < LU LU N cj� r1i U 2 U 00 Lu Z Q r-1 in 06 in 0 1 U) Lu LI 6 " 3: U L'U op ce rj _j 01 < a- rs! in ON fl -.4444 Uj Uj I:e U D Z < 0 LL LU _j < C) lw-- 0 a Lu Z Z Z Lu Lu L9 13� 1­4 0 Z LU U) U 0 U-) Q CO Lu Z U 0 . > 0 < 0 oC Uj 0— 0 LU Z C/) LU E C) 0 _j CID 0 N CM LO Q 04 C C1 > C14 LO LO LU C-) I— r— (D Z 00 00 -tt, o =000000 cc LU A Ci .3 (S MM U) Z _j M 0) or_ C.T 53) 9 1.— LL E Uj 0 U) PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION JDATE: NOVEMBER 23, 2011 REVISIONS: NO. DATE (PROJECT NO.: H9001.00 2D FOR TRAIL PLANS, SEE SHEET NO. 5 SUNNYBROOK CROSSING 10 FT 1 FT • 1 FT .— 8„ 1 BOLLARD MARKING DE' FOR HINGED BOLLAR NOTE: BOULDERS LEFT & RIGHT ON TR) WHITE STOP BAR (1211) WHITE CROSSWALK LINE (8 ") W/ 2' X 10' HIGH VI 8 FT 8 FT R 2' w 0 L L 32 FT 0-< � 100 FT cy SUNNYBROOK ROAD v � m m O c m = X Lo Ln CL 3 r 110 3 3 J V �z x NO MOTOR VEHICLES R5 -3 Ln L- l21 3 7 M so 10i W . Z Lo M 8 FT 8 FT 100 FT 32 FT R 75' R 2' 21 (TYP) DOUBLE YELLOW WHITE STOP BAR (12 ") YELLOW DIAGONAL 6A�- (2:1) SLOPE / E-521 r ON 0% V (n a -0 0 STOP R1 -1 BOLLARD (SEE DETAIL) H C7 ce w Z ccn z U-J O J Q� I'D g I..L U Q N ^ Q W = u 00 LL ���z� w OY W , o) C� Lu < N D J 0 d N (n m O Z ` H W U `) Y U U En En w � Z O U > i ;01 W W DC U Z J a 0 �o �Q �o ww Q O D s z � � w O z 3: ]PRELIMINARY ]PLANS II D® NOT USE FOR CONSTRUCTI ®N DATE: NOVEMBER 23, 2011 REVISIONS: 1 NO. I DATE 1 IPROJECT NO.: H9001.00 2E N Lu 0 N� LJ� N CO i LC,4, H C_) U Z wo=��� 0 LU C) 2 'a"), M LL LU d Z J O) m q U) H LL 2sZy 2 5 LL w W a W � a Cn V) Z ]PRELIMINARY ]PLANS II D® NOT USE FOR CONSTRUCTI ®N DATE: NOVEMBER 23, 2011 REVISIONS: 1 NO. I DATE 1 IPROJECT NO.: H9001.00 2E ii CITY OF RALEIGH H !: 1550, PG 0346 1723320892 ' J Co N LIST OF PIPES, ENDWALLS, ETC. (FOR PIPES 54" & UNDER) 1723114635 z °o w °o =aa°o CITY OF RALEIGH DB 3515 PG 709 1723414973 - - J 0) O) CIO fn H LL WILSON, ANNIE w DB 931, PG 601 1723605680 z H F- a PRECAST QUALITY PROPERTIES ASSET MANAGEMENT ui !. 14217 PG 1662 •i ! ! z QUALITY PROPERTIES ASSET MANAGEMENT DB 14217, PG 1662 1722684975 i MYRICK CONSTRUCTION COMPANY OF RALEIGH, : !: 10818, PG 1761 :i ABBREVIATIONS DOUGLAS, DEBORAH LIJ !: 12059, PG 1012 1722781570 BROWN, WILLIAM J JR DB 11276, PG 1121 1722788048 N ENDWALLS W a m m Cn DB 113187 PG 151 1722776743 U w ^ BROWN, WILLIAM J JR u z DB 2966, PG 313 1722874774 LL LYNN, WILLIAM M. & PATRICIA A. DB 2160 PG 191 1713925869 Ln CHEEK, JAMES E. & SUSIE B. O DB 2505 PG 616 1713926951 O DB 2226, PG 316 1713928946 Y fz z_ 11 O a OV w !i 13857, 1870 1713929933 1 ! ! i N !. 13729, PG 1925 i i• ! 1 0 O N (n ADDIE MAE 1 TERRI LYNN GIVENS STATION J I--I U 1 z O � i= j CLASS III R.C. PIPE NOTED OTHERWISE) BITUMINOUS COATED C.S. PIPE TYPE B NOTED OTHERWISE) w U) HDPE DOUBLE WALL MCPHATTER, MIRANDA M. & JOHN W. PER EACH u- X � � �i r? z U 1723024919 FRAME GRATES AND HOOD � ! i •• • PG 1464 1723034090 1 DONNA H. MONK : DELORAISE iB 12082, 694 1723036053 ' C.B. N.D.I. CATCH BASIN NARROW DROP INLET o U (UNLESS (UNLESS ® SMOOTH INTERIOR a o� V > O O z J W w Q PIPE J_" d< Z Q N oo STANDARD 840.03 N ~o LO 0 m o v c D.I. DROP INLET F W w U LL O j � G.D.I. GRATED DROP INLET v 1X > J W z U : Zo 5- : O OV p m g o P � m _°; m o H G.D.I. (N.S.) GRATED DROP INLET (NARROW SLOT) SIZE z O U w a0 z w w a0 12" 15" 18" 24" 30" 36" 42" 48" 12" 15" 18" 24" 30" 36" 42" 48" 12" 15" 18" 24" 30" 36" 42" 48" 54" 04 ,. N Cr) 04 LO LO LIN. FT. O J OVO m J.B. JUNCTION BOX a v O Cn a W IX z m J Z J p J Z u W J O J Z (0 = A B °o W a O W J W O = ° p otf M.H. T.B.D.I. MANHOLE TRAFFIC BEARING DROP INLET W THICKNESS OR GAUGE D ° ° ° o o o a 000 W H W �o °D g iw m H W T.B.J.B. TRAFFIC BEARING JUNCTION BOX O It CID � v Nt rn rn rn rn o = °z TYPE OF GRATE o 0 0 0 0 0 g)� M M M a w = a �' z ; - ,� - o ' a " = co ( � � ~ o o m U O U D o U u f REMARKS E F G Cn a �° 14 +60 -L1- 1 202.00 198.00 28 25 +29 -L1- 2 199.00 198.70 28 26 +80 -L1- 3 199.50 197.00 40 21 +68 -1-2- 4 189.50 189.00 64 DUAL HDPE 32 +75 -1-2- 5 191.00 188.00 32 38 +50 -1-2- 6 183.80 183.40 44 DUAL HDPE 10 +16 -WB- 6 187.50 187.00 128 DUAL HDPE TOTAL 28 26 32 44 232 LIST OF PARCELS IMPACTED Parcel N0. Owner Name Plansheet N0. DB & PG PIN Easement ii CITY OF RALEIGH H !: 1550, PG 0346 1723320892 ' J Co N CITY OF RALEIGH (D i � r 1723114635 z °o w °o =aa°o CITY OF RALEIGH DB 3515 PG 709 1723414973 - - J 0) O) CIO fn H LL WILSON, ANNIE w DB 931, PG 601 1723605680 z H F- a i QUALITY PROPERTIES ASSET MANAGEMENT ui !. 14217 PG 1662 •i ! ! z QUALITY PROPERTIES ASSET MANAGEMENT DB 14217, PG 1662 1722684975 i MYRICK CONSTRUCTION COMPANY OF RALEIGH, : !: 10818, PG 1761 :i is DOUGLAS, DEBORAH LIJ !: 12059, PG 1012 1722781570 BROWN, WILLIAM J JR DB 11276, PG 1121 1722788048 N JASPER, LLC DB 113187 PG 151 1722776743 U w Q = BROWN, WILLIAM J JR u z DB 2966, PG 313 1722874774 LL LYNN, WILLIAM M. & PATRICIA A. DB 2160 PG 191 1713925869 Ln CHEEK, JAMES E. & SUSIE B. O DB 2505 PG 616 1713926951 SANSOM, JOSEPH M. & SARAH S, DB 2226, PG 316 1713928946 Y YOUNG, ! YCE P. & ROBERT w !i 13857, 1870 1713929933 1 ! ! i N !. 13729, PG 1925 i i• ! 1 0 O N (n ADDIE MAE 1 TERRI LYNN GIVENS !: 10073, I--I U 1 MICHELLE L. HESS, TRUSTEE DB 12431 PG 2586 1723023906 w U) MCPHATTER, MIRANDA M. & JOHN W. DB 6376 PG 808 1723024919 GILBERT ! i •• • PG 1464 1723034090 1 DONNA H. MONK : DELORAISE iB 12082, 694 1723036053 ' w J w �1 z W 0 W � DC U Q Z a J O a = � w z H C/' 0 U DC J Co N CO (D i � r Lu Lu z °o w °o =aa°o 3 Ci MM Z dz - - J 0) O) CIO fn H LL 2sZy 5 LL w z H F- a Lu w oc a ui z 11) c z z J a g Q� LIJ kD N a U w Q = u z ^ 00 N LL a 'q Ln w O Y w D w � C� < d N J 0 O N (n 0) z I--I U w U) Y U o w ® I z O > w J w �1 z W 0 W � DC U Q Z a J O a = � w z PRELIMINARY PLANS I D® NOT USE FOR CONSTRUCTI ®N DATE: NOVEMBER 23, 2011 REVISIONS: NO. DATE PROJECT NO.: H9001.00 SCALE: NTS C/' 0 U DC J Co N CO i � r U z °o w °o =aa°o 3 Ci MM Z dz - - J 0) O) CIO fn H LL 2sZy 5 LL w w F- a Lu w oc a ♦^ V) z a PRELIMINARY PLANS I D® NOT USE FOR CONSTRUCTI ®N DATE: NOVEMBER 23, 2011 REVISIONS: NO. DATE PROJECT NO.: H9001.00 SCALE: NTS (= H LU LU v w i--i z Z U) z O J Q� LU � g Walnut C reek TRAIL w = TRAIL m � tY � ,1 z LNn w nff:ff LIST OF SIGNAGE ALONG TRAIL �W °LUG LU RESERVED Rules B�� Y� LU w jm� STOP PARKING b area < N D J _ �e= Pane �... »� .r NEUSE RIVER TRAIL NEUSE RIVER TRAIL �Areo i--i a N In rn O [ Al z w U) Rl -1 18" X 18" R7 -1 Y 30" X 30" (VEHICULAR) 12" X 18" U SIGN A SIGN B SIGN C SIGN D SIGN F SIGN I I °� U w Ln xxxx I I ®��� o alnut Creek Treil SPEED Hours of Operation: LIMIT Dawn to Dusk W7 -5 R2 —, pp 18 "X 18" WI -2L WI -5R �2" X 18" ID WI -2R is" 181,x 18" 18" X 18' SIGN J SIGN K SIGN L SIGN M SIGN P mco �..0 J > H w STOP K SIGN W N0 LISTEN MOTOR TVW16-2aP Wll -15 SIGN U z R5 -3 DOEOSSNOTT STOP W4-4P SIGN V SIGNS ll -15P SIGN R SIGN T 0. 1..1� Q �J W16 -7P V V D11 -1 U 24" X 12" BIKE ROUTE 24" X 18' [+� -1 12" X 9' SIGN X SIGN Z SIGN Y W Z J O SUMMARY OF EARTHWORK w IN CUBIC YARDS z LOCATION UNCLASSIFIED UNDERCUT EMBT +% BORROW WASTE EXCAVATION H N� N LU C LJ� J co U > N°LO Q i� Z00� � Z U w °o =a°oo°D 3 MM d0 Z J 01 N m mIT U) H l� I�—i w 0 w �G a w �1 oG V J a V) V) z a PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION DATE: NOVEMBER 23, 2011 REVISIONS: NO. DATE PROJECT NO.: H9001.00 SCALE: NTS 3A TYPE OF SIGNS SIGNAGE SYMBOL A B C D E F G H I J K L M N P Q R S T U V W X Y Z o^ _ O Q � tL c� � O z � w ' z cn z Q z O Y m Ud J z zo fm cc) � z � Q STATION � H Z w o w 2 H z _p m a p � Q a Q U Z 2 U w �_ o z Q H cn � W a Y � Q g w � p H � � Lpu � � w z w m LL Z O U � H W � a � z O Y z O � � p LL Z = z C7 in g a to z p fn > U Q W = w � v w V z Q W U �_ �_ °w w cn Q w = d O � �� �� � mz mm O�LU Uo _ w � p H O � Z � m o O z z � Q � w� Y � m� z� HC9 Qz ?t'n O� UU �X O- z� cn� ma OLn Ur H w � � Y p J a O m �� �X Q nl � ¢a z� Om O p �� pX � � �� U� � ' U� X _� QX w �N �� W ' U m COMMENTS -L1- 10 +33 LT 8.5 1 R1 -1 -L 1- 10 +33 RT 8.5 1 -L 1- 10 +60 LT 8.5 1 -L1- 13 +70 LT 8.5 1 W1 -2L -L1- 13 +70 RT 8.5 1 W1 -2R -L1- 15 +35 LT 8.5 1 W1 -2R -L1- 15 +35 RT 8.5 1 W1 -2L -L1- 19 +40 LT 8.5 1 W1 -2L -L1- 19 +40 RT 8.5 1 W1 -2R -L1- 21 +50 LT 8.5 1 W1 -2R -L1- 21 +50 RT 8.5 1 W1 -2L -L 1- 24 +50 LT 8.5 1 -L 1- 24 +60 LT 8.5 1 R5 -3 -L1- 24 +63 RT 8.5 1 1 R1 -1 SBR SEE SHT 2E 1 1 1 W1 -15, W1 -15P, W16 -7P SBR SEE SHT 2E 1 1 1 W1 -15, W1 -15P, W16 -2AP SBR SEE SHT 2E 1 1 D11 -1, W6 -4 SBR SEE SHT 2E 1 1 1 W1 -15, W1 -15P, W16 -7P SBR SEE SHT 2E 1 1 D11 -1, W6 -4 SBR SEE SHT 2E 1 1 1 W1 -15, W1 -15P, W16 -2AP -L 1- 25 +20 RT 8.5 1 1 R5 -3 -L1- 25 +20 LT 8.5 1 R1 -1 -L 1- 25 +25 LT 8.5 1 -L 1- 25 +25 RT 8.5 1 -L2- 10 +38 RT 8.5 1 US -64 -L2- 55 +45 RT 8.5 1 W7 -5 -L2- 55 +45 RT 8.5 1 -L2- 56 +00 LT 8.5 1 -L2- 18 +70 RT 8.5 1 -L2- 17 +00 LT 8.5 1 W7 -5 -Y1- 18 +46 LT 8.5 1 R1 -1 -Y1- 1 EXACT LOCATION TBD -Y1- 10 +50 RT 8.5 1 CONFIDENCE MARKER 2 USE ON LITTLE JOHN MILE MARKERS 2 SPEED LIMIT TYPE H 2 TOTAL 3 4 3 2 5 2 1 2 1 8 2 2 4 4 2 2 2 SIGNAGE SYMBOL A B C D E F G H I J K L M N P Q R S T U V W X Y Z Note- This Drawing Correlates With 440 12 Of 44 Raleigh 44e444y5 Caster Sign Program. 414445 to match 444ig4 44e4440 4D444r4 Cap 4° x 4" x 1/4) Aluminum Sheet 4144 To Top Of FP�4 C I U U11 ���C1 II 4 Cite ❑❑ na4so 4D 4D 4ILCIIL Cap 4" x 4' x 1/4) 44minum Sheet Welded TO Top Of Tube Ground Clean Tube 499 x 499 x 4° x 1 Aluminum Tube 6063 D S Cite ❑D n.t.s. C44r Etevati44 r CAA 4' x 4' x �� ° 4�III II L Sheet 4144 To Top Of Tube Ground Clean Tube 499 x 499 x 2399 x 1/899 Square Atuminum Tube 6 ❑4 52 Compacted Fitt 499 x 499 x 1/899 4uminum Sheet 4144 TO Bottom Of Tube Ground Clean 1/4 x 4" Rebar Welded To Bottom 6 Mlle ❑❑ n.t.s. Concrete Carter 44Di44 SIGN TYPE E Miteage Markers 18// 1 399 4lvo SOxx Boardwalk Rail 2 x 4" PT Board 1/49 4a4 Bolts 5 x 3/4' Carriage Gall. Bolas Mile Marker Boardwalks 4 �5 0 N E U S E C 00 00 ° °0 0 0 O° 0 ° O ° J'4 44° 4444 a O �77 o o 00 00 0 0 0 O° 0 ° O ° 18 00 ° O °° ° 0 O° 4 O ° O o 00 00 ° 0° 0 0 ° 0 00 0 00 00 0 00 a ° O° 00 - 0 00 0 0° 0 0 0 0 - 0 0 00 a i ° 0 0 0 0 o ° 000 0 ° 00 � 12 NOTE, 44444 TYPICAL 44 4444 4444 �Ch4 Marker Section 12 n.t.s. w J w �1 z W 0 W � DC U Q Z a J O a = � w z a w z z g a Z w w O z w V) Y U O Ln Q w Z J O U > H C/' 0 U DC rn V C O w w � H ") U � � � U '—' >< � Ur MM d0 Z ' � L J - O m vLL z c~n 0 w �c a 0 w � a V J V) z � U � 2 N U 00 a ri Z Ln O � LU w�C7o w LU OP C)e d N J 01 N (n ON U w J w �1 z W 0 W � DC U Q Z a J O a = � w z a w z z g a Z w w O z w V) Y U O Ln Q w Z J O U > PRELIMINARY PLANS I D® NOT USE FOR CONSTRUCTI ®N DATE: NOVEMBE R 23, 2011 REVISIONS: 1 NO. I DATE 1 (PROJECT NO.: H9001.00 t NTS C/' 0 U DC J Cfl N C O � H ") U � � � U Z w Cs MM1 >< � Ur MM d0 Z ' � L J - O m vLL m w 0 w �c a w � a V J V) z a PRELIMINARY PLANS I D® NOT USE FOR CONSTRUCTI ®N DATE: NOVEMBE R 23, 2011 REVISIONS: 1 NO. I DATE 1 (PROJECT NO.: H9001.00 t NTS NOTE: SIGN SHALL BE 18" X 18" FOR TRAIL APPLICATIONS. MOUNT SIGN TO POST TO NCDOT SPECS. ALL HARDWARE TO BE GALVANIZED AND FILED TO PREVENT THEFT /REMOVAL ST MOUNT SIGN TO POST TO NCDOT SPECS. ALL HARDWARE TO BE GALVANIZED AND FILED TO PREVENT THEFT /REMOVAL 4 "x 4" POST 4 "x 4" POST - ASPHALT TRAIL/ GREENWAY ASPHALT TRAIL/ GREENWAY 3' -6" 2„ 2500 PSI CONC. FOOTING, (TYP.) #57 WASHED STONE, (TYP.) COMPACTED SUBGRADE DESIGNATED AS© ON PLANS 2500 PSI CONC. FOOTING, (TYP.) T -6" 0 in 2" 2" s` \ \ #57 WASHED STONE, (TYP.) COMPACTED SUBGRADE 1' -0" m r 1 GREENWAY STOP SIGN INSTALLATION 3 GREENWAY TYPICAL SIGN INSTALLATION 3 3 NOTE: SEE PLANS FOR SIGN TYPE AND SIZE. PROVIDE WIDENING TO THE INSIDE OF THE FOLLOWING CURVES 2" SOLID YELLOW LANE LINE ALIGNMENT CURVE BEGIN STA END STA LENGTH C O r= v Lu H co C Lu Lu z Z W o =c)m w d0 Z LL J O) m q U) H LL 2sZy 2 5 LL w 1--i CURVE WIDENING DETAIL NOTE: SEE SIGNAGE PLAN SHEETS FOR PLACEMENT WHEN CONDITION EXISTS AT INTERSECTIONS AND BOARDWALK NOTE: TRAIL HEAD SIGNS ASSOCIATED WITH VEHICULAR TRAFFIC AND SIGNS ALONG ROADWAYS SHALL MEET NCDOT AND MUTCD SIGN REQUIREMENTS, AND BE INSTALLED PER NCDOT STANDARD DRAWING 940.50 w J w �1 z W 0 W � DC U Q Z a J O a = � w z H N 0 U LJ� J co N C O r= v Lu H co C Lu Lu z Z W o =c)m w d0 Z LL J O) m q U) H LL 2sZy 2 5 LL w 1--i a Lu w a z III Z U) z z J O a g Q� kD cj� N a U w Q = zLn ^ LL a ,1 w O Y 3 w D w op C� a < d N J O N (n ON Z H U W `) Y U U O Ln w ® I Z O U > w J w �1 z W 0 W � DC U Q Z a J O a = � w z PRELIMINARY PLANS I D® NOT USE FOR CONSTRUCTI ®N DATE: NOVEMBER 23, 2011 REVISIONS: 1 NO. I DATE 1 IPROJECT NO.: H9001.00 3C NTS N 0 U LJ� J co N C O Lu H co C U z Z W o =c)m MM d0 Z LL J O) m q U) H LL 2sZy 2 5 LL w W a Lu w a ♦^ V) z a PRELIMINARY PLANS I D® NOT USE FOR CONSTRUCTI ®N DATE: NOVEMBER 23, 2011 REVISIONS: 1 NO. I DATE 1 IPROJECT NO.: H9001.00 3C NTS Note- This Drawing Correlates With Page N Of The Raleigh CNenways Masan Nigh Program, Finishes to match Raleigh Greenway Standards 1 CCU 3 noNs. �e Thfough—Bott Perit r 44 4 Graphic Panel 0 as Panel are 1R 0 0 12 if 0 0 Graphic Vaal 17 1;' 1 (0- C to C 11 1; 10 i t o to C NNar Plate I 9 Steel, Noway 6ouated Standard Coax 4 apaa Panel, Backer Plate 4 n,t.s. SIGN TYPE H INTERPEaTaN CC 1E) cl I 2 a 3 n.t.<o 1/4-20 Securi Through Bolt Graphic Panel 1/2 Backer 17 1/2" x 11 SNet Ntaa9 Powder Standard Cotor Weld Continuous Post V" x 2" SNE Powder Coated Standard Color SNexe No 5 aapaa 4 naNs. as Panel Elevation 2" e Peet `olor itt Note: City Of Raleigh To Supply Design Only. Contractor For Production, Mounting, Tub e Graphic Nosh, (4)) Steel 4t Powder Standar Con( aaffa Responsible and Erection. 3 CCU �IG naNs. Natal Details as Panel action )Nova Grade m W a a LU a V) z a LU J LU �1 z W 0 W � DC U Q Z a J O a = � w z LU z z g a Z W W O z LU V) Y U O Ln Q w Z J O U > F- C/' 0 DC i N") C'4 C O H U .0 � � Z U >< ---t Ur MM d0 Z LU [ LL J 01 ' M f/1 H LL 5 LL w n t/)U) PJ >OE LIMINA Y PLANS I ® NOT USE FOR CONSTRUCTI ®N DATE: NOVEMBER 23, 2011 REVISIONS: 1 NO. I DATE 1 (PROJECT NO.: H9001.00 3D NTS H C7 w LU '—' w z o Q < LU oC � U 2 N U 00 LL � ,--i Z T O 0-6 U') LU 2 3:wLU C)e d N J 01 N (n ON U m W a a LU a V) z a LU J LU �1 z W 0 W � DC U Q Z a J O a = � w z LU z z g a Z W W O z LU V) Y U O Ln Q w Z J O U > F- C/' 0 DC i N") C'4 C O H U .0 � � Z U >< ---t Ur MM d0 Z LU [ LL J 01 ' M f/1 H LL 5 LL w n t/)U) PJ >OE LIMINA Y PLANS I ® NOT USE FOR CONSTRUCTI ®N DATE: NOVEMBER 23, 2011 REVISIONS: 1 NO. I DATE 1 (PROJECT NO.: H9001.00 3D NTS Note- Finishes to match Raleigh Green\y Standards. WHERE SIGN IS INSTALLED AT BOARDWALK, BOTTOM E]L]EVATION OF SI GN SHALL EQUAL TOP RAIL ]ELEVATION 2 1/2 )9 Aluminum Pipe 606 T529 Capped & Ground Clean 1/49, Aluminum Sheet 3033 149 Welded To ]pipe See 3K rl--,Regutatory Sign Plan 1/4" Aluminum Sheet 3033 H 149 AtCe4 T o ��P� 2 1/2" Ali Capped a] Regulatory Sign Elevation 0,25 1'3 49 SIGN TYPE K 2.5" x 93" Aluminum Tube, Capped Ground SPECIAL SIGNS pI":' --) in ---- - - - 1/4" Aluminum Sheet 3 Welded To x Tube/ i i I , p Regulatory Sign Sectiq / 1/499 Aluminum Sheet 3033 H 14, At4e4 CC CIpC \ 2 1/2 DAturninum Pipe, 606 `0029 Capped Ground & Clean r3--,Regulatory Sign Elevation 49 I i 1/4)" Aluminum Sheet 3033 H 149 At4eC To Pipe -\ xxxx 4 ., •■ 2 1/p99 Aluminum Pipe96063 T52, Capped & Ground Clean Painted standard Color 49 Concrete Compacted Fitt 28 24 r-4-,Regutatory Sign Section 10\0 O o� 00 O O 0 O C 0 C 00 00 O0 O O °O 0 0 O O � D 00 00 00 00 O � D O 00 00 pro ODp O O O O O O oo\ oo 4 O V 12" m 0 w a a w a V) z a w J w �1 z W 0 W � DC U Q Z a J O a = � w z w z z g a Z w w O z w V) Y U O Ln Q w Z J O U > C/' 0 DC i N") C'4 C O H U .0 � � Z U >< -- -t =a M M d 0 3 �Ur MM Z LL !z: -j 01 N 2 2sZ f/1 H LL 5 LL w tnU) PRELIMINARY PLAN I D® NOT USE FOR C®NSTRUCPI ®N DATE: NOVEMBER 23, 2011 REVISIONS: 1 NO. I DATE 1 (PROJECT NO.: H9001.00 3E NTS H C7 w w '—' J z 0 En r- o < LU kD oC � U 2 N U 00 LL ri Z Ln 0 06 Uw ID O 2 C7 0 Y w o0 < d N D J 1 r N (n ON U m 0 w a a w a V) z a w J w �1 z W 0 W � DC U Q Z a J O a = � w z w z z g a Z w w O z w V) Y U O Ln Q w Z J O U > C/' 0 DC i N") C'4 C O H U .0 � � Z U >< -- -t =a M M d 0 3 �Ur MM Z LL !z: -j 01 N 2 2sZ f/1 H LL 5 LL w tnU) PRELIMINARY PLAN I D® NOT USE FOR C®NSTRUCPI ®N DATE: NOVEMBER 23, 2011 REVISIONS: 1 NO. I DATE 1 (PROJECT NO.: H9001.00 3E NTS REALIGN EAIVIt$Gr TRAIL AND BEGIN CONSTRUCTION 1 SAW, Cj4T A� REMOVE EXTRA PAVEMENT 00 0 TIE TO EXISTING TRAIL LLJ vI LLJ -c (t)u.,ft)uu. 220 220 210 200 190 Me] 170 F5 0 —r F-� (D U-1 U-1 Z U) o Q wu N oC0 cj� u ce < N u N 00 LL- Z I N Ln 0 C6 Ln w L C7 o U) " 3: w �- L'u Op Q� < N �-4 -J o'j a- N Ln ON Lu Lu V) z �e Lu Lu 0C U D a Lu z z 15 Z Lu Lu 0 Lu U) Y U 0 Ln 9 U co Lu z -j u 0 . u > 0 �Q 0 o Lu Lu -j < 0 C) Lu 0 3: F- c/) Lu co E DC C) 0 > C-4 c) C'4 C,3) Lco�, Lu , P- rLo- Z .0 .0 -g C:) LU C:) af ccol, cw:) 0 if (5 m ce) z Lu [u- LL — 5 -1 0) 01 N u- n P1 = 17+40.00 210 PRELIMINARY PLANS EL 192.78" P1 18+70.00 DO NOT USE FOR CONSTRUCTION EL = 192.26" 1 VC = 80" VC /00 200 /5 +20.00 (-)0.4000;l. P1 20 +00.00 DATE: NOVEMBER 23, 2011 EL 204.61" REVISIONS: L 202.46" VC 80*' 190 NO. DATE 180 11PROJECT NO.: 170 H9001.00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 1 4 P1 STA. 22 +55.06 A = 54* 13*'54.8" (RT) D = 57* l7' 44.8" L = 94.65' T = 51.21' R = 100.00/ rr) 202 CITY OF RALEIGH DB 035/5, PG 0709 FIN 1723414973 202 END CONSTRUCTION CITY OF RALEIGH TIE TO EXISTING TRAIL DB 035/5, PG 0709 -Ll- STA. 33 + 73.57 . . ........ PIN 1723414973 500 PROP. 40'-42" HDPE GN PRO P. 28'-15" HDPE X Co 500 NOD ' 14 FOR SUNNYBROOK CROSSING DETAILS, SEE SHEET 2E 220 210 200 190 180 170 21+00 22+00 M H (D -Ll- CURVE DATA Lu z P1 STA. 23 +43.10 P1 STA. 24 +0/.88 P1 STA. 24 +37.13 P1 STA. 25 +53.97 P1 STA. 25 +89.9/ P1 STA. 26 +43.57 P1 STA. 26 +88.59 P1 STA. 27 +25.78 P1 STA. 27+90.79 P1 STA. 32 +39.90 A = 48*04'25.0"(LT) A = 22*02"33.2"(RT) A = 78*12"02.9"(LT) A = 109*09*'32.0"(RT) A = 65*57*52.8"(LT) A = 37*06"24.8"(RT) A = 15*44.,23.7"(LT) A = 26*29"37.1"(RT) A = 16*03-'17.4"(LT) A = 40*00-'00.0" (LT ) D = 57*17"44.8" D = 57*17"44.8" D = 286*28"44.0" D = 286*28"44.0" D = 143*14"22.0" D = 57*17*44.8" D = 57*17*44.8" D = 57*17"44.8" D = 19*05"54.9" D = 14*19"26.2" L = 83.90' L = 38.47' L = 27-30' L = 38.10' L = 46.05" L = 64.76' L = 27.47' L = 46.24' L = 84.06" L = 279.25' T = 44.60" T = 19.48" T = 16.25" T = 28.12" T = 25.96' T = 33.56' T = 13.82" T = 23.54' T = 42.31' T = 145.59' R = 100.00' R = 100.00" R = 20.00' R = 20.00' R = 40.00" R = 100.00' R = 100.00' R = 100.00' R = 300.00' R = 400.001 rr) 202 CITY OF RALEIGH DB 035/5, PG 0709 FIN 1723414973 202 END CONSTRUCTION CITY OF RALEIGH TIE TO EXISTING TRAIL DB 035/5, PG 0709 -Ll- STA. 33 + 73.57 . . ........ PIN 1723414973 500 PROP. 40'-42" HDPE GN PRO P. 28'-15" HDPE X Co 500 NOD ' 14 FOR SUNNYBROOK CROSSING DETAILS, SEE SHEET 2E 220 210 200 190 180 170 21+00 22+00 M H (D W W Lu z w Lu Lu kD N cj� u < r1i u N 00 LL Lu Q Z , r-i T O 0�1 ULU, ko cr; U) 3: Lu Lu 00 < N N D -J a- N Ln m U "I Lql!4141111111111� AS- �e Lu Lu 0C U D lo� Lu z z Z Lu Lu 0 Lu U) Y U 0 Ln 9 u co Lu z -j C) U u > 0 �Q 0 o Lu Lu 0 C) L U O 3: PIN 1723414973 1723414973 Fw Lu 0 -- WET Vf25-_ ..... . ...... FW . ..... . ................... . ..... . .................. - FW ................ . ..... . ................. -i C) C.) ... . ...... ... Fw.... . . . .............................. . ............ - FW ................. ...... . ......... N '"o Z A C) C) C) c:j cc .0 Z Lu a00 M f 00 N c') w Z LL LU r r -s 23+00 220 P1 = 25 +30.00 23 +50.00 EL 199.58" P1 28+40.00 0 L = 196.21' VC 20*' EL 197.68'...... 21 PRELIMINARY PLANS U-) VC /00" P1 32 *70.00 DO NOT USE FOR CONSTRUCTION = 80" N Ln P1 30 +40.00 Q:) m EL 192.06" m EL 191.28" ( +)1.2000 o m 0000;/. (-)4900 VC 60" (+)3. VC /00 0-;- 200 4637 (-)/.O000;/. (-),5.0000. P1 26 +80.00 (+)1.8000;1- (-,'3.0000,,-1 (+)4-0000�1- 9 DATE: NOVEMBER 23, 2011 REVISIONS: 24+35.00 PROP 40'- 42" HDPE EL 204.08 oo;/. 190 NO. DATE EL = 200.85' VC /00' P1 29+30.00 VC = 601 7 P/ 33+30.00 6 .EL PROP 28'- 15" HDPE VC = 80/ EL = 194.16' EL = 194.46' 180 VC 70" VC 60" PROJECT NO.: H9001.00 170 SCALE: 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 1 5 I w N Lu -L2- CURVE DATA LJ� N C'4 CO P1 ST A. /0 +84.63 P1 STA. 12 +57.60 P1 STA.14 +09.82 P1 ST A. /5 +07.21 P1 ST A. /5 +99.13 P1 STA. 17 +17.88 P1 STA. 18 +46.45 P1 STA. 19 +43.29 d0 Z ' A = 41* 0/' 02.3" (LT) 0 = 82° 40' 24.5" (RT) 0 = 70° 58' 16.2" (LT) A = 17° 58' 19.0" (RT) A = 17° 09' 29.2" (LT) 0 = 27° 46' 33.2" (RT) A = 21° 37' 42.5" (LT) A = 9° 21' 13.4" (RT) t c� D = 47° 44' 47.3" D = 38° //" 49.9" D = 60° 18' 40.8" D = 19° 05' 54.9" D = 19° 05'54.9" D = 19° 05' 54.9" D = 19° 05' 54.9" D = //* 27' 33.0" ss L = 85.91' L = 216.44' L = 117.67' L = 94.10' L = 89.84' L = 145.43' L = 113.25' L = 81.63' l O T = 44.89' T = 131.95' T = 67.73' T = 47.44' T = 45.26' T = 74.18' T = 57.31' T = 40.90' l�, R = 120.00' R = 150.00 R = 95.00' R = 300.00' R = 300.00' R = 300.00' R = 300.00' R = 500.00' l { I I n) WE��fLAND NF23 F ANNIE ON 12 l DB 931, PG 6 s PIN 1723605680f I I f, rd .4F \ c E � �° ��.. „war - t�.�„ . TC 0 � .................... loo {\ �e s EST 1 EST 2 N CLASS 'B' RIP RAP N/F .. '{ S bL X 3 LOCITYDISS ATOR PAD # RUFUS LOCKHART ^ ^ ALBERTA LOCKHART , 220 210 200 190 170 m l t\ Wei I'll ° EL = 193.29' +)/.7 L = +70. 220 i W W DC U Z J a i 0 �o �Q �o ww Q O D s z � � w O z 3: w N Lu C LJ� N C'4 CO (D i P- H U .0 � U Z wifomce) 3 •• w d0 Z ' LLJ O) m q U) H LL 2 5 LL w ~ a w oG a z III Z U) La J g QLu 13' N Q I..L U w Q = ^ LL Q�'zLn w O cs Y� w D w C) a < d N J O N (n 01 Z H U w `) Y U U Ln Ln 99 CD H w ® I Z O U > i W W DC U Z J a i 0 �o �Q �o ww Q O D s z � � w O z 3: P1 = 18 +40.00 210 PRELIMINARY PLAN S] EL= 194.46' D® NOT USE FOR C®NSTRUCPI ®N VC = 70' 200 ( +)2.70uu` ool- DATE: NOVEMBER 23 2011 190 REVISIONS: NO. DATE Pl = 19+50.00 EL = 197.43' VC = 120' 180 PROJECT NO.: 170 H9001.00 10 +00 11 +00 12 +00 13 +00 14 +00 15 +00 16 +00 17 +00 18 +00 19 +00 20 +00 1 6 N Lu C LJ� N C'4 CO i P- H U .0 � U Z wifomce) 3 •• ��Ur MM d0 Z ' LLJ O) m q U) H LL 2 5 LL w w �G a w oG a V J N QZ a P1 = 18 +40.00 210 PRELIMINARY PLAN S] EL= 194.46' D® NOT USE FOR C®NSTRUCPI ®N VC = 70' 200 ( +)2.70uu` ool- DATE: NOVEMBER 23 2011 190 REVISIONS: NO. DATE Pl = 19+50.00 EL = 197.43' VC = 120' 180 PROJECT NO.: 170 H9001.00 10 +00 11 +00 12 +00 13 +00 14 +00 15 +00 16 +00 17 +00 18 +00 19 +00 20 +00 1 6 220 210 200 190 W� 204 N/F RUFUS LOCKHART, ALBERTA LOCKHART, AND ISREAL LOCKHART DB 93I, PG 601 PIN 1723609076 PROP DUAL 32' -42" HDPE m X 180 PROP D z °" A Ij c� l i 1� 1� 1� ta m -L2- CURVE DATA = w (D w P1 ST A. 22 +44.70 P1 ST A. 23 +50.36 P1 ST A. 27 +14.47 P1 ST A. 29+45.00 P1 ST A. 3/ +58.32 P1 ST A. 32 +78.52 A = 96° 42' 42.4" (RT) A = 27° 42' 42.4" (LT) A = 57° 17' 3/5' (LT) 0 = 15° 54' 55.9" (RT) 0 = 17° 08' 08.5" (LT) A = l0° 30' 44.2" (RT) J o � - g D = 57° l7' 44.8" D = 28° 38' 52.4" D = 28° 38' 52.4" D = 5° 43' 46.5" D = //* 27`33.0" D = //* 27' 33.0" W Lu L = 168.79' L = 96.73' L = 199.99' L = 277.78' L = 149.54' L = 91.74' T = 112.46' T = 49.33' T = 109.25' T = 139.79' T = 75.33' T = 46.00' � _ 8 z w R = 100.00' R = 200.00' R = 200.00' R = 1,000.00' R = 500.00' R = 500.00' 0 06 W � o Lu Y�00 < N D J w a N L Q 0 a m z I--I w U `) Y U Ct � H w ® � O 205 NIF QUALITY PROPERTIES PROP 32' -30" HDPE N ASSET MANAGEMENT DB 14217, PG 1662 BY 2006, PG 929 O RG �� PIN 1722780727 r U3 N o O k o e� Lo RA / m fP, 'TOR PA lz 5 ,✓ ;;'` Off• iZ111i -� �Cb cp F / . ..x ............. EST 5 TON CLASS,' —AiP RAP .._.._.:. ~ i F EST 16 SY,'FICTER FABRIC -.- w w, \ / i 101 X 5'W VELOCITY :rDISSIPATOR. -PAb WETLAND WF20 -- - w \ — c- WETLAND -�' _ :' , 1 FW ti ti. f. tY loo r WETLAND WF21 �...., S F 16 B ..w .. . ' .. j r p t l.. .. t `.•„ q Ila 6 / O 7. R / = 27 +70.....( L = 193.67' +)1.6000 P/ 29 EL l5 VC = 6( `i W W DC U Z J a 0 �o �Q �o ww Q O D s z � � w O z 3: 220 210 PRELIMINARY ARY P] ANS D® NOT USE FOR CONSTRUCTION Pl = 32 +60.00 VC = /00' 200 DATE: NOVEMBER 23, 2011 REVISIONS: — — 1 NO. DATE .-OZ" 180 PROJECT NO.: H9001.00 170 170 SCALE: 20 +00 21 +00 22 +00 23 +00 24 +00 25 +00 26 +00 27 +00 28 +00 29 +00 30 +00 31 +00 32 +00 33 +00 7 N r E U N� LJ� J N CO i Lo � H U t Za�o,O�o,-C(j LLBO =00g �---tUr MM LL d0 5 J 0) O) DD q fn H LL 5 LL w w �c F- a a w a � ♦^ V J V) z a 220 210 PRELIMINARY ARY P] ANS D® NOT USE FOR CONSTRUCTION Pl = 32 +60.00 VC = /00' 200 DATE: NOVEMBER 23, 2011 REVISIONS: — — 1 NO. DATE .-OZ" 180 PROJECT NO.: H9001.00 170 170 SCALE: 20 +00 21 +00 22 +00 23 +00 24 +00 25 +00 26 +00 27 +00 28 +00 29 +00 30 +00 31 +00 32 +00 33 +00 7 220 210 200 Od. 205 N/F QUALITY PROPERTIES ASSET MANAGEMENT DB 142/7, PG 1662 BY 2006, PG 929 PIN 1722780727 Ln n PROP DUAL 2 -36" DPE Cy) �) PGE J P1 = 34 +90.00 EL = 205.16` (+)1.0 pp ©/� 19 — — VC = 260` P1 = 40 +50.00 `'�- -- - -- - --'' EL = 199.96' • 170 CcICIIiI 1mill 11 - �'IIiI� �iI� I:IIiIm IIi � umeIel - )0.5000% Q! aCK QcIIilel r/ EL = .5/' ( +)3 °2000/ — - — EL AM 111 sill 220 i W W DC U Z J a 0 �o �Q �o ww Q O D s z � � w O z 3: c/' 0 DC > N 12 C'4 CO H U CR CR � Z U wifo m M °o 3 �Ur M d0 � J 01 N Z f/1 H u- 5 LL w ntn o 210 PRELIMINARY ARY P] ANS D® NOT USE FOR CONSTRUCTI ®N 200 DATE: NOVEMBER 23, 2011 190 REVISIONS: NO. DATE 180 PROJECT NO.: H9001.00 170 46 +00 I 8 -L2- CURVE DATA = w (D w P1 STA. 39 +67.03 P1 STA. 43 +97.22 z A = 32° 27' 59.4" (RT) A = 58° 27' 59.4" (LT) j Z J 2 v~) � - g D = 28° 38' 52.4" D = 57° 17' 44.8" W Lu L = 113.33' L = 102.04' p� T= 58.23' T= 55.96' w= z° Z R= 200.00' R= 100.00' 0 W 8 o Lu 0 Y - w w oo U a < a N N u J Q a m O z I--I U w `n Q 208 u U �W O Ln N/F gag I I DEBORAH DOUGLAS ® II O U DB 12059, PG 1012 �d ®� ®�� U > PIN 1722781570 a PROP DUAL 2 -36" DPE Cy) �) PGE J P1 = 34 +90.00 EL = 205.16` (+)1.0 pp ©/� 19 — — VC = 260` P1 = 40 +50.00 `'�- -- - -- - --'' EL = 199.96' • 170 CcICIIiI 1mill 11 - �'IIiI� �iI� I:IIiIm IIi � umeIel - )0.5000% Q! aCK QcIIilel r/ EL = .5/' ( +)3 °2000/ — - — EL AM 111 sill 220 i W W DC U Z J a 0 �o �Q �o ww Q O D s z � � w O z 3: c/' 0 DC > N 12 C'4 CO H U CR CR � Z U wifo m M °o 3 �Ur M d0 � J 01 N Z f/1 H u- 5 LL w ntn o 210 PRELIMINARY ARY P] ANS D® NOT USE FOR CONSTRUCTI ®N 200 DATE: NOVEMBER 23, 2011 190 REVISIONS: NO. DATE 180 PROJECT NO.: H9001.00 170 46 +00 I 8 220 210 200 190 • 170 Z \ I--," w j F PROP DUAL 64'- 42" HDPE ENT EQUALITY A. 54 + 44.51 -L2- _ 209 POC STA. 10 + 00.00 -WB- \ N/F Ln ► 7 0 V 0 i V, ul rn rn I A. 4b tlb.Ub r'/ S A. 4b tyb.UZ r'/ S A.5,) t/W f A. 5b A. Sts tLy.4L r'l S A.// tb-V.4/ rn V 0 = 9° 26' 12.9" (LT) A = 8° 26' 12.9" (RT) 0 = IT 10'01.,3" (LT) 0 = 80° 31'59.0" (RT) 0 = 69° 21' 57.7" (LT) 0 = 80° 3/' 59.0" (RT) Z D = ll° 27' 33.0" D = //* 27' 33.0" D = ll° 27' 33.0" D = 28° 38' 52.4" D = 38° 11'49.9" D = 28° 38' 52.4" LU L = 82.35' L = 73.63' L = 149.81' L = 281.11' L = 181.60' L = 281.11' ` T = 41.27' T = 36.88' T = 75.47' T = 169.41' T = 103.80' T = 169.41' ° R = 500.00' R = 500.00' R = 500.00' R = 200.00' R = 150.00' R = 200.00 �'� -62° / = 5/ m W a a w a V) z a 220 i W W DC U Z J a a w z z g a Z W W i� O z W U) Y U O Ln Q w Z J U O > 0 �o �Q �o ww Q O D s z � � w O z 3: c/' 0 DC J co U i N P- C'4 CO H U .0 .0 - Z U if (5 M M d0 � J 01 N Z f/1 H u- n 5 LL w n v J P1 = 54+30.00 EL = 191.28' i VC = 90' 210 PRELIMINARY PLANS D® N., U,F FOR CONSTRUCTI ®N END GRADE -L2- 31N GRADE -WB- STA.._54 +44_51 = 200 L = 191. P DUAL 64'- 42" HDPE DATE: NOVEMBER 23, 2011 190 REVISIONS: NO. DATE 180 PROJECT NO.: 170 H9001.00 46 +00 47 +00 48 +00 49 +00 50 +00 51 +00 52 +00 53 +00 54 +00 10 +55.49 58 +00 59 +00 1 9 H rn V w w H � Z cn o Q < LU kD oC � w 2 N U 00 LL QHT'z'n O U-) w O 2 C7 0 �j W � Lu pp d N J 01 N (n m U m W a a w a V) z a 220 i W W DC U Z J a a w z z g a Z W W i� O z W U) Y U O Ln Q w Z J U O > 0 �o �Q �o ww Q O D s z � � w O z 3: c/' 0 DC J co U i N P- C'4 CO H U .0 .0 - Z U if (5 M M d0 � J 01 N Z f/1 H u- n 5 LL w n v J P1 = 54+30.00 EL = 191.28' i VC = 90' 210 PRELIMINARY PLANS D® N., U,F FOR CONSTRUCTI ®N END GRADE -L2- 31N GRADE -WB- STA.._54 +44_51 = 200 L = 191. P DUAL 64'- 42" HDPE DATE: NOVEMBER 23, 2011 190 REVISIONS: NO. DATE 180 PROJECT NO.: 170 H9001.00 46 +00 47 +00 48 +00 49 +00 50 +00 51 +00 52 +00 53 +00 54 +00 10 +55.49 58 +00 59 +00 1 9 FOR -Yl- PROFILE SEE SHEET 12 Pl STA. 11 +69.41 P1 STA. 13 +84.9/ 0 = 80° 3/' 59.0" (RT) A = 69° 21' 57.7" (LT) D = 28° 38' 52.4" D = 38° 11`49.9" L = 281.11' L = 181.60' T = /gQ dl' T = In 3 Rn' -Y1- CURVE DATA P1 STA. 16 +80.09 Pl STA. 18 +0/.92 A = 69° 10' 22.2" (RT) 0 = 67° 38' 59.0" (LT ) D = 71° 37' 11.0" D = 47° 44' 47.3" L = 96.58' L = 141.69' T = 4i � /e' T = Rn_4 1' Q / 11 +00 12 +00 13 +00 14 +00 15 +00 PRELIMINARY PLANS D® NOT USE FOR CONSTRUCTI ®N DATE: NOVEMBER 23, 2011 REVISIONS: NO. DATE PROJECT NO.: H9001.00 10 H (D Lu w Z 11 1 J Z o U) g Q� kD Q U w N ^ Q 2 U 0 Q / 11 +00 12 +00 13 +00 14 +00 15 +00 PRELIMINARY PLANS D® NOT USE FOR CONSTRUCTI ®N DATE: NOVEMBER 23, 2011 REVISIONS: NO. DATE PROJECT NO.: H9001.00 10 N /F WILLIAM M. & PATRICIA A. LYNN DB 2160, PG 191 BM 1968, PG 160 PIN 1713 -92 -5869 s NCDOT STD. 848.05 WHEELCHAIR RAMP O O O ° L-f) 213 N /F JAMES E. & ° O SUSIE B. CHEEK Q DB 2505, PG 616 -� BM 1964, PG 74 PIN 1713 -92 -6951 Q NCDOT STD. 848.05 WHEELCHAIR RAMP 214 N /F JOSEPH M. & SARAH S. SANSOM DB 2226, PG 316 BM 1964, PG 74 PIN 1713 -92 -8943 215 N /F JOYCE P. & ROBERT YOUNG DB 13857, PG 1870 BM 1964, PG 74 PIN 1713 -92 -9933 N /F ADDIE MAE SHAFE & TERRI LYNN GIVENS DB 10073, PG 2575 BM 1964, PG 74 PIN 1723 -02 -0967 217 N /F DEQING WU DB 13728, PG 19: BM 1964, PG 74 PIN 1723- 02 -09: (9is-) NCDOT STD. 848.05 WHEELCHAIR RAMP c 0 END CONSTRUCTION O —UN STA. 11 + 15.75 O PROPOSED 5'' CONCRETE SIDEWALK O O ° M � D BEGIN CONSTRUCTION co TIE TO EXISTING SIDEWALK Q —LJ1— STA. 10 + 00.00 z O I� CA, O NCDOT STD. 848.05 WHEELCHAIR RAMP BEGIN CONSTRUCTION —U2— STA. 10 +18.97 NOTE: SIDEWALK TO BE INSTALLED ON EXISTING GRADE NCDOT STD. 848.05 220 WHEELCHAIR RAMP NF MIRANDA M/& JOHN W. 221 MCPHATTER N/F DB 6376, PG 808 PEGGY GILBERT BM 1962, PG 151 DB 8619, PG 1464 PIN 1723 -02 -4919 BM 1962, PG 151 PIN 1723 -03 -4090 222 .411 AUE AUE UE AU TIE TO EXISTING TU DRIVEWAY MP ° ° f� O M EIP M EM LO O PROPOSED 5 4- EXISTING 5� CONCRETE SIDEWALK O POW � CAROLINA LINE ER & LIGHT EL ° E RIGH T OF EC TRIC � (BM 1962, WA Y 62, PG 151 ) PROPOSED 5' CONCRETE SIDEWALK O BE IN CONSTRUCTION 2- STA. 10 + 14.31 O O END CONSTRUCTION -U2- STA. 13 +49.96 O NOTE: SIDEWALK TO BE INSTALLED ON EXISTING GRADE Q z DP 0 0 O O 25' 0' 25' 50' (ENGLISH) N /F DONNA H. MONK & DEL( 0 HINES DB 12082, PG 6� BM 1962, PG 1 F PIN 1723 -03 -60 .411 AUE AUE UE AU TIE TO EXISTING TU DRIVEWAY MP ° ° f� O M EIP M EM LO O PROPOSED 5 4- EXISTING 5� CONCRETE SIDEWALK O POW � CAROLINA LINE ER & LIGHT EL ° E RIGH T OF EC TRIC � (BM 1962, WA Y 62, PG 151 ) PROPOSED 5' CONCRETE SIDEWALK O BE IN CONSTRUCTION 2- STA. 10 + 14.31 O O END CONSTRUCTION -U2- STA. 13 +49.96 O NOTE: SIDEWALK TO BE INSTALLED ON EXISTING GRADE Q z DP 0 0 O O 25' 0' 25' 50' (ENGLISH) J O ~ Y Q Y Q O W a � w w w � _j a U o O w z 0 z J a i H c/' 0 DC N C'4 CO (D P_ i H co � Lu Z z w d0 Z LL J O) m q U) H LL 2sZy 2 5 LL w 0 w F_�c a w � oG a z Lu z w z J a g QLu Lu cj� N Q U w Q = ^ LL a�,1zLn w Lu O Y w D w 0 a < a N N L QJ a 0-i m z i--i U w `n Y U U � w99 ® I Z o U > J O ~ Y Q Y Q O W a � w w w � _j a U o O w z 0 z J a i PRELIMINARY PLANS I DO NOT USE FOR CONSTRUCTION DATE: NOVEMBER 23, 2011 REVISIONS: NO. DATE PROJECT NO.: H9001.00 11 c/' 0 DC N C'4 CO P_ i H co � U Z z �.4Ur MM d0 Z LL J O) m q U) H LL 2sZy 2 5 LL w 0 w F_�c a w � oG a V � �) V) z a PRELIMINARY PLANS I DO NOT USE FOR CONSTRUCTION DATE: NOVEMBER 23, 2011 REVISIONS: NO. DATE PROJECT NO.: H9001.00 11 H w a (D w V � w H z H �..�..� Z U) Z O g J o PI Il 5 f H a 0 0 .0 a w kD c� w f � N a — + P/ /4 7 _ P/ / 7 ...5.00 � / 4 2 5.00 EL 93.9. Q oC u a � w _ N Z - /9/.7 � Z _ EL 19/.63 EL 5 ,� � w 2 2 05 05 VC s0 � 0 w W C7 0 Ce VC 50 O VC 80 � �, w Y w H � N 01 N D ri O a N u1 01 2. 0 3 8 z 800 0 0 J0.9 J a O N w 3 0 r 5 e :.. l 5 .� 5 9 a 9 Y (; � it .� 0 .3 � a o 0 J3 90 00/ l +J1. 20 .. 0 _ _ o 0 d 8 0 5 0 0 _ (..... o m JI (`� d 8 Ln 0 0 �t3 5 9 0 + t. 0 J a _ � o a _ e I w Pl l6 /0.00 H J — 7� Z PI _ 10...45.00 m U - 198.50" I � o� EL d 1 �7 l $5 EL. 9 a22 $5 VC 60 Pl 13 60.00 _ = VC so EL 193.25 VC = 60 175 175 J 165 165 O D Q 155... 15..5 Q O W a oC W w w J a- 145 14..5 U Q O 0 w 135... 13..5 z O z J Q 125 125 10 11 12 13 14 15 16 17 18 co E W 0 0 J — H F- > O N C O V LO r n Ln Ln N— Z O .0 H Id O W .. o = ao O ao O 3 if (5 M M N O Z a W — of 0') N LL W r H r _ J O p) N — m 2sZ LL 5 LL UJ W a a w ♦^ V) a z a DATE: NOVEMBER 23 2011 REVISIONS: NO. DATE PROJECT NO H9001.00 SCALE: 12 "WORTH DAL PARK CITY OF RALEIGH NORTH CAROLINA NEUSE RIVER TRAILS WALNUT CREEK INDEX OF SHEETS 1 1A 1B THRU 1C 1D 2 THRU 2D 3 3A THRU 3E 4 THRU 13 S -1 THRU S -4 SB -1 THRU SB -5 X -1 THRU X -13 TITLE SYMBOLOGY SHEET NOTES CONSTRUCTION ACCESS TYPICAL SECTIONS & DETAILS EARTHWORK & PARCELS INFORMATION SIGNING SUMMARIES AND DETAILS PLAN & PROFILE SHEETS STRUCTURE PLANS BOARDWALK PLANS CROSS SECTIONS H 7 CITY OF RALEIGH NORTH CAROLINA NEUSE RIVER TRAILS WALNUT CREEK INDEX OF SHEETS 1 1A 1B THRU 1C 1D 2 THRU 2D 3 3A THRU 3E 4 THRU 13 S -1 THRU S -4 SB -1 THRU SB -5 X -1 THRU X -13 TITLE SYMBOLOGY SHEET NOTES CONSTRUCTION ACCESS TYPICAL SECTIONS & DETAILS EARTHWORK & PARCELS INFORMATION SIGNING SUMMARIES AND DETAILS PLAN & PROFILE SHEETS STRUCTURE PLANS BOARDWALK PLANS CROSS SECTIONS Dlllij LOCATION: w 2�� FROM NEW HOPE ROAD J � k� ~ TO NEUSE RIVER 11J G V) z TYPE OF WORK: w 0 RA D I N PAV I N ST R CT R E D RA I N A E oC o G G, G, U U G U VICINITY MAP EROSION CONTROL, LANDSCAPING 0 � w PRELIMINARY PLAN SET z a J O Q = z II I BEGIN PROJECT -WB- STA. 15 +20.00 GRAPHIC SCALES 50 25 0 50 100 PLANS 50 25 0 50 100 PROFILE (HORIZONTAL) 4 4i O; Z -WB- STA. 69 +'75.00 LB = -WBR2- STA. 69 + 75.00 LA BOARDWALK 2 7 1 � l cREEll- �N ANN a w Z Z g a Z w w 0 z w U) Y U 0 aw Z J O U > F D ROJECT w 0 J Is Lu i N � r CO C-) BOARDWALK 4 B— TA* l 1.18 woZ00� CC) c"': t , M M d _0 LuLLJ 0) 0) N z -WBR2- STA. 84 + 96.32 = m IT cl) u- w -W B- STA. 83 + 5 0.0 0 LA --- F- (n a ^ w C/ ) a BOARDWALK 6 N AM AS � g �n -WBRI- STA. 54 +12.83 LB = BOARDWALK 5 --/ -WB- STA. 52 +20.41 LA � BRIDGE i -WB- STA. 44 + 00.00 LB = / BOARDWALK 1 —WBRI— STA. 44 + 00.00 LA 10 5 0 10 20 4" 1 1 1 PROFILE (VERTICAL) DESIGN DA TA DESIGN SPEED = 20 MPH LEAN ANGLE = 15 DEGRESS FUNC. CLASSIFICATION = GREENWAY PROJECT LENGTH LENGTH OF GREENWAY = 1.562 MILES LENGTH OF BOARDWALK = 0.917 MILES LENGTH OF BRIDGE = 0.027 MILES LENGTH OF PROJECT = 2.472 MILES PRELIMINARY ARY ]f➢][mA I D® NOT USE FOR C®NSTRUCPI ®N DATE: NOVEMBER 23, 2011 REVISIONS: NO. DATE PROJECT NO.: H9001.00 i H rn V w w ~ z o Q N oC � w � 2 N U 00 LL ���zLn O � Uw � C7o Y H w o0 < a N m N D QJ 01 u a ON ~ U Dlllij LOCATION: w 2�� FROM NEW HOPE ROAD J � k� ~ TO NEUSE RIVER 11J G V) z TYPE OF WORK: w 0 RA D I N PAV I N ST R CT R E D RA I N A E oC o G G, G, U U G U VICINITY MAP EROSION CONTROL, LANDSCAPING 0 � w PRELIMINARY PLAN SET z a J O Q = z II I BEGIN PROJECT -WB- STA. 15 +20.00 GRAPHIC SCALES 50 25 0 50 100 PLANS 50 25 0 50 100 PROFILE (HORIZONTAL) 4 4i O; Z -WB- STA. 69 +'75.00 LB = -WBR2- STA. 69 + 75.00 LA BOARDWALK 2 7 1 � l cREEll- �N ANN a w Z Z g a Z w w 0 z w U) Y U 0 aw Z J O U > F D ROJECT w 0 J Is Lu i N � r CO C-) BOARDWALK 4 B— TA* l 1.18 woZ00� CC) c"': t , M M d _0 LuLLJ 0) 0) N z -WBR2- STA. 84 + 96.32 = m IT cl) u- w -W B- STA. 83 + 5 0.0 0 LA --- F- (n a ^ w C/ ) a BOARDWALK 6 N AM AS � g �n -WBRI- STA. 54 +12.83 LB = BOARDWALK 5 --/ -WB- STA. 52 +20.41 LA � BRIDGE i -WB- STA. 44 + 00.00 LB = / BOARDWALK 1 —WBRI— STA. 44 + 00.00 LA 10 5 0 10 20 4" 1 1 1 PROFILE (VERTICAL) DESIGN DA TA DESIGN SPEED = 20 MPH LEAN ANGLE = 15 DEGRESS FUNC. CLASSIFICATION = GREENWAY PROJECT LENGTH LENGTH OF GREENWAY = 1.562 MILES LENGTH OF BOARDWALK = 0.917 MILES LENGTH OF BRIDGE = 0.027 MILES LENGTH OF PROJECT = 2.472 MILES PRELIMINARY ARY ]f➢][mA I D® NOT USE FOR C®NSTRUCPI ®N DATE: NOVEMBER 23, 2011 REVISIONS: NO. DATE PROJECT NO.: H9001.00 i BOUNDARIES AND PROPERTY State Line - - - -- County Line -- Township Line City Line Reservation Line Property Line Existing Iron Pin Property Corner Property Monument Parcel /Sequence Number Existing Fence Line 0 D 123 CONVENTIONAL Proposed Woven Wire Fence Proposed Chain Link Fence Proposed Barbed Wire Fence Existing Wetland Boundary - - - —WLB— - - - Proposed Wetland Boundary WLB Existing Endangered Animal Boundary EAB Existing Endangered Plant Boundary EPB BUILDINGS AND OTHER CULTURE: Gas Pump Vent or U/G Tank Cap o wcR Existing Telephone Pole S Sign N� W Well Small Mine 0 Foundation 0 Area Outline Cemetery F T Building T Designated LYG Telephone Cable (S.U.E. *) - School Recorded U/G Telephone Conduit Church Designated LYG Telephone Conduit (S.U.E. *)- - - - —TC— - - - Recorded U/G Fiber Optics Cable Dam Designated LYG Fiber Optics Cable (S.U.E.*)- - HYDROLOGY.• Stream or Body of Water Hydro, Pool or Reservoir Jurisdictional Stream Buffer Zone 1 Buffer Zone 2 100 Year Flood Plain 500 Year Flood Plain Floodway Flow Arrow Disappearing Stream Crrirn vrw....7a Wetland Proposed Lateral, Tail, Head Ditch False Sump PLAN RAILROADS: Standard Gauge RR Signal Milepost Switch RR Abandoned RR Dismantled RIGHT OF WAY.- Baseline Control Point Existing Right of Way Marker 0 Existing Right of Way Line Proposed Right of Way Line n Proposed Right of Way Line with R Iron Pin and Cap Marker Proposed Right of Way Line with R Concrete or Granite Marker Existing Control of Access Proposed Control of Access Existing Easement Line E Existing Greenway Easement Line -- -- -- Proposed Temporary Construction Easement - Proposed Permanent Greenway Easement Proposed Permanent Drainage Easement Proposed Permanent Drainage /Utility Easement Proposed Permanent Utility Easement Proposed Temporary Utility Easement Proposed Permanent Easement with Iron Pin and Cap Marker ROADS AND RELATED FEATURES: Existing Edge of Pavement Existing Curb — Limits of Disturbance - Proposed Slope Stakes Cut - - - C - - - Proposed Slope Stakes Fill - - - F - - - Temporary Silt Fence Temporary Tree Protection Fence � Temporary Combination Tree -x Protectiorv'Silt Fence -E- PGE PDE DUE PUE TUE O is BZ 1 BZ 2 100 - 500 FW - < -- - -- <- FLGW Proposed Wheel Chair Ramp Existing Metal Guardrail Proposed Guardrail Existing Cable Guiderail Proposed Cable Guiderail Equality Symbol Pavement Removal -X -X- SHEET SYMBOLS PEGETATION.- Single Tree Single Shrub Hedge Woods Line Orchard Vineyard EXISTING STRUCTURES: MAJOR: Bridge, Tunnel or Box Culvert Bridge Wing Wall, Head Wall and End Wall - MINOR: Head and End Wall Pipe Culvert Footbridge Drainage Box: Catch Basin, DI or JB Paved Ditch Gutter Storm Sewer Manhole Storm Sewer UTILITIES: POWER: Existing Power Pole Proposed Power Pole Existing Joint Use Pole Proposed Joint Use Pole Power Manhole Power Line Tower Power Transformer U/G Power Cable Hand Hole H -Frame Pole Recorded UVG Power Line Designated U/G Power Line (S.U.E. *) 0 � M J Vineyard CONC ) CONC WW CONC HW 0 CB O s i b HH H P — — — —P— — — — TELEPHONE: wcR Existing Telephone Pole N r T T T Proposed Telephone Pole N� T T T T Telephone Manhole O n n n Telephone Booth 0 n n n n Telephone Pedestal ❑D Telephone Cell Tower U/G Telephone Cable Hand Hole HH Recorded U/G Telephone Cable T Designated LYG Telephone Cable (S.U.E. *) - - - -T- - - - Recorded U/G Telephone Conduit TG Designated LYG Telephone Conduit (S.U.E. *)- - - - —TC— - - - Recorded U/G Fiber Optics Cable T FO Designated LYG Fiber Optics Cable (S.U.E.*)- - - - -T FO— - - - WATER: Water Manhole Water Meter o Water Valve Water Hydrant Recorded UAG Water Line W Designated U/G Water Line (S.U.E.* ) - - - —W____ Above Ground Water Line A/G Water TV: TV Satellite Dish C TV Pedestal ILI TV Tower U/G TV Cable Hand Hole Iq Recorded LPG TV Cable TV Designated U/G TV Cable (S.U.E. *) - - - —TV— - - - Recorded LPG Fiber Optic Cable TV FO Designated U/G Fiber Optic Cable (S.U.E. *)-- - - - —TV FO— - - GAS: Gas Valve Gas Meter Recorded LPG Gas Line Designated U/G Gas Line (S.U.E. *) Above Ground Gas Line SANITARY SEWER: Sanitary Sewer Manhole Sanitary Sewer Cleanout U/G Sanitary Sewer Line Above Ground Sanitary Sewer Recorded SS Forced Main Line Designated SS Forced Main Line (S.U.E. *) MISCELLANEOUS: Utility Pole Utility Pole with Base Utility Located Object Utility Traffic Signal Box Utility Unknown U/G Line U/G Tank Water, Gas, Oil AEG Tank Water, Gas, Oil U/G Test Hole (S.U.E. *) Abandoned According to Utility Records End of Information 0 -G- - —G— — — - A/G Gas O O SS- A/G Sanitary Sewer FSS — — — —FSS— — — - • D 0 ❑s 0 0 m AATU R E.0.1. "I q1111 w J w �1 z W 0 W � DC U Q Z a J O a = � w z a w z z g a Z w w i� O z w V) Y U O Ln U co LU z J U U> H N r E N� rn V CO w w i � U H F__ ��Ur MM LL d0 z N z 11 1 Z cn 0 w a o Q ♦^ V) oC � U 2 N U 00 00 LL ,1 Z O '6 U) w O � 2 C7 0 �j w --� LU 00 D! d N J C11 N (n M H U "I q1111 w J w �1 z W 0 W � DC U Q Z a J O a = � w z a w z z g a Z w w i� O z w V) Y U O Ln U co LU z J U U> PRELIMINARY PLANS I D® NOT USE FOR CONSTRUCTI ®N DATE: NOVEMBER 23, 2011 REVISIONS: 1 NO. I DATE 1 PROJECT NO.: H9001.00 SCALE: NTS N r E N� N C'4 CO LJ� i � U z wg =C')M ��Ur MM LL d0 z N z J Cn m T U) LL L W 0 w a a w a ♦^ V) z a PRELIMINARY PLANS I D® NOT USE FOR CONSTRUCTI ®N DATE: NOVEMBER 23, 2011 REVISIONS: 1 NO. I DATE 1 PROJECT NO.: H9001.00 SCALE: NTS GENERAL NOTES THE CONTRACTOR SHALL PERFORM ALL CONSTRUCTION ACTIVITIES IN ACCORDANCE WITH THE APPLICABLE REQUIREMENTS OF THE JULY 2006 NCDOT STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES. UNLESS NOTED OTHERWISE IN THESE PLANS OR ASSOCIATED SPECIFICATIONS ALL DEMOLITION SHALL BE APPROVED BY CITY OF RALEIGH INSPECTIONS DEPARTMENT. ALL DEMOLITION AND SUBSEQUENT CONSTRUCTION TO BE IN ACCORDANCE WITH PERMITS ISSUED AND APPLICABLE STATE, COUNTY, AND LOCAL CODES. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL INSPECTIONS, CERTIFICATIONS, PERMITS, EQUIPMENT, ETC. THAT MAY BE REQUIRED. WHERE ASPHALT SECTION IS REMOVED, CONTRACTOR SHALL USE A SAW CUT AT THE LIMITS OF DEMOLITION TO OBTAIN A CLEAN EDGE. ALL TREE PROTECTION FENCING SHALL BE INSTALLED PRIOR TO LAND DISTURBANCE OPERATIONS INCLUDING TREE REMOVAL, IN SUCH A MANNER AS TO CLEARLY AND ADEQUATELY SEPARATE ALL TREES TO BE REMOVED FROM REMAINING VEGETATION. CONTACT CITY OF RALEIGH PARKS AND RECREATION DEPARTMENT TO SET UP A PRE - CONSTRUCTION MEETING PRIOR TO LAND DISTURBANCE. TREE PROTECTION FENCING CAN AND SHOULD BE INSTALLED PRIOR TO PRE - CONSTRUCTION MEETING. NO GRADING IS TO OCCUR IN THE TREE PROTECTION AREAS OR TREE CRITICAL ROOT ZONES. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL INSPECTIONS, CERTIFICATIONS, EQUIPMENT, ETC. THAT MAY BE REQUIRED. THE CONTRACTOR MUST, AT ALL TIMES, KEEP THE PREMISES FREE FROM ACCUMULATIONS OF WASTE MATERIALS OR RUBBISH CAUSED BY HIM, HIS EMPLOYEES, OR HIS WORK. ALL DEBRIS SHALL BE REMOVED FROM THE SITE ON A DAILY BASIS. RELOCATION OF EXISTING UTILITIES TO BE COORDINATED WITH THE LOCAL UTILITY PROVIDER(S). EXISTING UTILITIES AND STRUCTURES SHOWN BOTH UNDERGROUND AND ABOVE ARE BASED ON THE BEST AVAILABLE RECORD DRAWINGS. THE CONTRACTOR SHALL VERIFY FIELD CONDITIONS PRIOR TO BEGINNING RELATED CONSTRUCTION. ANY DISCREPANCIES SHALL BE REPORTED TO THE OWNER'S REPRESENTATIVE IMMEDIATELY. CONTRACTOR SHALL LOCATE ALL UTILITIES AND UTILITY ELEVATIONS PRIOR TO CONSTRUCTION. ALL UTILITIES TO REMAIN SHALL BE PROTECTED BY THE CONTRACTOR. ANY UTILITIES DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED BY CONTRACTOR. CONTRACTOR SHALL RESTORE ALL LAY DOWN AND STAGING AREAS TO ORIGINAL CONDITIONS AND TO THE SATISFACTION OF THE OWNER, PRIOR TO DEMOBILIZATION AT THE CONCLUSION OF THE PROJECT. ANY EXCAVATION MUST BE FILLED IN AND TAMPED AT THE CONCLUSION OF EACH WORK PERIOD, AND EQUIPMENT AND SUPPLIES RETURNED TO THE CONSTRUCTION STAGING AREA. CONSTRUCTION /SAFETY FENCING REMOVED TO FACILITATE ACCESS BY THE CONTRACTOR FOR CONSTRUCTION MUST BE REPLACED AT THE END OF EACH WORK PERIOD TO DIRECT PEDESTRIAN TRAFFIC AWAY FROM HAZARDOUS AREAS. DEMOLITION, AND SUBSEQUENT CONSTRUCTION OF STORM DRAINAGE FACILITIES SHALL BE PERFORMED IN SUCH A MANNER THAT THE OLD PIPE AND STRUCTURES ARE REMOVED AND NEW STRUCTURES AND PIPING ARE IMMEDIATELY PUT INTO SERVICE. CONTRACTOR SHALL ENSURE THAT STORM DRAINAGE DOES NOT REMAIN OUT OF SERVICE FOR LONGER THAN 12 HOURS AT A TIME. PROVISIONS SHALL BE MADE TO MAINTAIN STORM WATER DRAINAGE DURING CONSTRUCTION. CONTRACTOR SHALL STAKE CENTERLINE OF TRAIL ACCORDING TO PLANS AND OBTAIN APPROVAL FROM OWNER'S REPRESENTATIVE PRIOR TO CONSTRUCTION. ANY DISCREPANCIES SHALL BE RESOLVED PRIOR TO CONSTRUCTION MEETING. STATIONING IS APPROXIMATE. CONTRACTOR SHALL VERIFY ALL STATIONING FOR APPLICABILITY TO EXISTING CONDITIONS PRIOR TO CONSTRUCTION. DEVIATION FROM ALIGNMENT DUE TO LARGE TREES OR OTHER OBSTACLES ETC SHALL BE APPROVED BY CITY OF RALEIGH. CONTRACTOR SHALL MAINTAIN ALL ABOVE AND BELOW GROUND STORM WATER DRAINAGE AND PATTERNS AND PIPING AS THEY CURRENTLY EXIST UNLESS NOTED OTHERWISE. ANY DISTURBANCE OF THE PATTERNS OR STRUCTURES BY THE CONTRACTOR SHALL BE CORRECTED BY THE CONTRACTOR TO CONDITION PRIOR TO DISTURBANCE. CLEAN OUT STORM WATER PIPE ONLY IF NOTED ON PLAN AND ACCORDING TO DETAIL. CONTRACTOR ACCESS FOR TRAIL CONSTRUCTION SHALL BE CONFIRMED BY CONTRACTOR WITH OWNER'S REPRESENTATIVE AND PROPERTY OWNER PRIOR TO CONSTRUCTION. CONTRACTOR SHALL REVIEW TREE REMOVAL WITH OWNER'S REPRESENTATIVE AND OBTAIN APPROVAL PRIOR TO TREE REMOVAL. CONTRACTOR SHALL REMOVE ALL VEGETATION TO 3' BEYOND ASPHALT EDGE OF TRAIL OR WITH IN REQUIRED DRAINAGE DITCHES. TRIM UP BRANCHES OF TREES TO PROVIDE 8' VERTICAL CLEARANCE. ALL CONSTRUCTION SHALL COMPLY WITH CITY OF RALEIGH STANDARDS. CONTRACTOR SHALL PROVIDE SILT FENCING IN ALL AREAS AND EROSION CONTROL MEASURES AS NEEDED OR DIRECTED BY THE EROSION CONTROL INSPECTOR. IF ADDITIONAL MEASURES ARE REQUIRED IN ADDITION TO THE PLANS, COMPENSATION WILL BE PROVIDED PER THE CONTRACT PROVISIONS. ALL DISTURBED AREAS THAT WILL BE IDLE 14 DAYS OR LONGER SHALL BE SEEDED BY CONTRACTOR. NOTES THE ENGINEER AND OR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND METHODS ASSOCIATED WITH PROJECT AS SET FORTH IN THESE PLANS. IF DEPARTURES FROM THE SPECIFICATIONS OR DRAWINGS ARE DEEMED NECESSARY BY THE CONTRACTOR, DETAILS OF SUCH DEPARTURES AND REASONS THEREOF SHALL BE SUBMITTED TO THE OWNER IN WRITING FOR REVIEW. NO DEPARTURES FROM THE CONTRACT DOCUMENTS SHALL BE MADE WITHOUT THE WRITTEN PERMISSION OF THE OWNER. SEQUENCE OF CONSTRUCTION ACTIVITIES 1. A PRECONSTRUCTION CONFERENCE MUST BE HELD PRIOR TO THE START OF ANY CONSTRUCTION ACTIVITIES. A MANDATORY PRE - CONSTRUCTION MEETING WILL ALSO BE REQUIRED WITH THE LAND QUALITY SECTION OF NCDENR BEFORE LAND DISTURBING ACTIVITIES BEGIN. CALL 919 - 791 -4200 TO SCHEDULE A MEETING. 2. INSTALL CONSTRUCTION ENTRANCES AS NEEDED AT LOCATIONS SHOWN ON SHEET 1 D. OTHER STAGING AREAS WILL NEED TO BE DISCUSSED WITH CITY OF RALEIGH PRIOR TO THE START OF CONSTRUCTION. CONTACT THE CITY OF RALEIGH AT (919)516 -2837. 3. DETERMINE AND MARK LIMITS OF DISTURBANCE. 4. INSTALL TREE PROTECTION FENCING, SILT FENCE, COMBINATION FENCE AND, SILT FENCE OUTLETS. SILT FENCE OUTLETS SHALL BE INSTALLED PER FIELD LOCATED LOW POINTS AND AS SHOWN ON APPROVED PLANS. 5. CLEAR ONLY AS NECESSARY TO INSTALL THESE DEVICES. CALL FOR ON SITE INSPECTION BY ENVIRONMENTAL INSPECTOR AND OBTAIN CERTIFICATE OF COMPLIANCE. 6. TOPSOIL AND STONE BASE REMOVAL AND /OR STORAGE AREAS SHALL BE CONTAINED WITHIN THE PROPOSED LIMITS OF DISTURBANCE. 7. BEGIN GRADING & CLEARING AND GRUBBING. MAINTAIN DEVICES AS NEEDED. ROUGH GRADE SITE. INSURE THAT SEDIMENT LADEN WATER IS DIRECTED TO SEDIMENT CONTROL DEVICES. 8. INSPECT AND MAINTAIN ALL EROSION CONTROL MEASURES EVERY 7 DAYS AND AFTER EACH SIGNIFICANT RAINFALL (0.5 INCHES OR GREATER) AND DOCUMENT WITH INSPECTION REPORTS. 9. PLACE TEMPORARY SEEDING ON ALL DISTURBED AREAS THAT WILL BE IDLE 14 DAYS OR LONGER. 10. INSTALL STORM SEWER SYSTEMS AND CULVERTS AND PROTECT INLETS WITH INLET PROTECTION. INSTALL CULVERTS IN JURISDICTIONAL AREAS ACCORDING TO NCDOT BEST MANAGEMENT PRACTICES FOR CONSTRUCTION AND MAINTENANCE ACTIVITIES MANUAL. CULVERT INSTALLATIONS IN STREAMS WILL REQUIRE DEWATERING BY USE OF COFFER DAMS /IMPERVIOUS DIKES AND PUMPS TO MAINTAIN WATER QUALITY STANDARDS, PER DETAIL ON SHEET 2C. CULVERT TO BE CONSTRUCTED IN THE DRY. CONTRACTOR TO COORDINATE WITH EROSION CONTROL INSPECTOR. ANY TEMPORARY COFFER DAM SHALL BE CONSTRUCTED OF MATERIALS SUCH AS SHEET PILING, SANDBAGS OR CLEAN CLASS 1 RIP RAP OR LARGER STONE THAT WILL NOT CONTRIBUTE TO TURBIDITY OR SILTATION OF THE WATER BODY. A TEMPORARY SEDIMENTATION BAG SHALL BE USED PER NCDOT STANDARD DRAWING NUMBER 1630.06. SANDBAGS SHALL BE OF THE FILTER FABRIC TYPE, DOUBLE BAGGED AND INDIVIDUALLY TIED TO PREVENT SAND LEAKAGE. THEY SHALL BE PLACED AND REMOVED MANUALLY TO PREVENT SPILLAGE. ONLY CLEAN SAND, FREE OF DEBRIS, SILT, FINE PARTICLES OR OTHER FOREIGN SUBSTANCES, SHALL BE USED TO FILL THE BAGS. THE COFFERDAM SHALL BE ENTIRELY REMOVED IMMEDIATELY UPON COMPLETION OF WORK. DURING PERIODS OF WORK ACTIVITY, FLOW IMMEDIATELY DOWNSTREAM OF THE WORKSITE SHALL EQUAL FLOW IMMEDIATELY UPSTREAM OF THE WORKSITE. ALL OTHER OPTIONS WILL NEED PRIOR APPROVAL. SEE SHEET 2C FOR DETAIL. NO DIRECT PAYMENT SHALL BE MADE FOR THE WORK OF INSTALLATION, MAINTENANCE, AND REMOVAL OF IMPERVIOUS DIKE(S) AS DESCRIBED IN THIS PROVISION. PAYMENT FOR SUCH WORK SHALL BE DISTRIBUTED AMONG THE VARIOUS PAY ITEMS. 11. AS AREAS ARE BROUGHT UP TO FINISH GRADE, SPREAD TOPSOIL OVER ALL AREAS TO RECEIVE TURF OR LANDSCAPING. SEED ALL AREAS WITHIN 14 DAYS OF COMPLETING ACTIVITY. PERMANENT GRASS SHALL BE INSTALLED FOR ALL AREAS AT FINAL GRADE AND IN SEASON. FERTILIZE, WATER AND RESEED AS REQUIRED TO ESTABLISH AND MAINTAIN A VIGOROUS STAND OF GRASS. 12. AFTER COMPLETION OF CONSTRUCTION AND THE SITE IS STABILIZED, REMOVE ALL ACCUMULATED SEDIMENT FROM SEDIMENT TRAPPING MEASURES AND SPREAD EVENLY ACROSS THE SITE. THEN REMOVE TEMPORARY EROSION CONTROL MEASURES, SMOOTH AREA AND APPLY APPROPRIATE GRASS. 13. WHEN VEGETATION HAS BECOME ESTABLISHED, CALL FOR FINAL SITE INSPECTION BY ENVIRONMENTAL OFFICER. OBTAIN CERTIFICATE OF COMPLIANCE. 14. CONTRACTOR IS REQUIRED TO MAINTAIN A WEEKLY WRITTEN REPORT OF SEDIMENT AND EROSION CONTROL DEVICES. m 0 W �c a w a V) Z a ne w J w �1 z W 0 W � DC U Q Z a J O a = � w z N� N 0 LJ� Lu J co U N Lo � CO U m H Zcoocoo, C(j wg =c')m z 'IT (5 MM d0 � J 01 N Z q U) LL_ W V) IW NARY PLANS] Q• D® N ®'P" USQ•, R CONSTRUCT— DATE: NOVEMBER 23, 2011 REVISIONS: 1 NO. I DATE 1 IPROJECT NO.: H9001.00 t H (D Lu Lu Z z Z J g QLu k 'y Q I..L U Lu Q z N LL Q w O 1T Y� W D 2� Lu 3 a < d N J rn O N (n m z U w `) Y U 0 99 w ® I Z ° U > m 0 W �c a w a V) Z a ne w J w �1 z W 0 W � DC U Q Z a J O a = � w z N� N 0 LJ� Lu J co U N Lo � CO U m H Zcoocoo, C(j wg =c')m z 'IT (5 MM d0 � J 01 N Z q U) LL_ W V) IW NARY PLANS] Q• D® N ®'P" USQ•, R CONSTRUCT— DATE: NOVEMBER 23, 2011 REVISIONS: 1 NO. I DATE 1 IPROJECT NO.: H9001.00 t NOTES EROSION CONTROL NOTES TOTAL ACREAGE OF DISTURBED AREA IS 21.83 ACRES, TOTAL PROJECT AREA IS 1,901.26 ACRES. ACREAGE OF PERMANENT AND TEMPORARY SEEDING IS 35.8 ACRES. SEE CONTRACT DOCUMENTS AND SHEET 2D FOR SEEDING SPECIFICATIONS. ON -SITE BURIAL PITS ARE NOT ACCEPTABLE. ANY GRADING BEYOND THE LIMITS SHOWN ON THE PLAN IS A VIOLATION OF THE STATE /COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO FINE. STABILIZATION IS THE BEST FORM OF EROSION CONTROL. TEMPORARY SEEDING IS NECESSARY TO ACHIEVE EROSION CONTROL IN LARGE DENUDED AREAS AND ESPECIALLY WHEN SPECIFICALLY REQUIRED AS PART OF THE CONSTRUCTION SEQUENCE SHOWN ON THE PLAN. ALL GRADED SLOPES MUST BE SEEDED AND MULCHED WITHIN 14 CALENDAR DAYS OF COMPLETION OF GRADING. DURING UNSUITABLE GROWING SEASONS, MULCH WILL BE USED AS A TEMPORARY COVER ON SLOPES THAT ARE 4:1 OR STEEPER, MULCH WILL BE ANCHORED. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A LOCAL REPRESENTATIVE OF THE STATE /COUNTY STORM WATER MANAGEMENT SECTION AND THE LOCAL INSPECTIONS DEPARTMENT. CONSTRUCTION, MAINTENANCE, REMOVAL OF ALL EROSION CONTROL DEVICES, ALL FINES, LEGAL FEES AND RESTORATION COSTS ARE THE RESPONSIBILITY OF THE CONTRACTOR UNLESS OTHERWISE NOTED. A COPY OF THE APPROVED PLANS MUST BE ON FILE AT THE JOB SITE. CONTRACTOR SHALL OBTAIN A COPY OF EACH SUBSURFACE INVESTIGATION REPORT AND FOLLOW THE RECOMMENDATIONS OR AS DIRECTED FOR GRADING, COMPLETION AND PAVEMENT DESIGN, ETC. EROSION PROVISION THE CONTRACTOR SHALL BE REQUIRED TO TAKE EVERY REASONABLE PRECAUTION THROUGHOUT THE CONTRACT TO PREVENT THE EROSION OF SOIL AND THE SEDIMENTATION OF STREAMS, LAKES, RESERVOIRS, OTHER WATER IMPOUNDMENTS, GROUND SURFACES, OR OTHER PROPERTY AS REQUIRED BY THE SEDIMENT POLLUTION CONTROL ACT OF 1973 AND THE 1974 AMENDMENTS TO THE ACT. FAILURE ON THE PART OF THE CONTRACTOR TO COMPLY WITH THE PROVISIONS OF THE EROSION CONTROL PLAN OR TO PERFORM EROSION CONTROL WORK AS DIRECTED WILL RESULT IN THE ENGINEER, INSPECTOR OR NCDENR NOTIFYING THE CONTRACTOR TO COMPLY WITH THESE PROVISIONS. IN THE EVENT THAT THE CONTRACTOR FAILS TO BEGIN SUCH REMEDIAL ACTION OR FAILS TO BEGIN EROSION CONTROL WORK WITHIN 24 HOURS AFTER RECEIPT OF SUCH NOTICE WITH ADEQUATE FORCES AND EQUIPMENT, THE ENGINEER MAY PROCEED TO HAVE THE WORK PERFORMED WITH OTHER FORCES. NO PAYMENT WILL BE MADE TO THE CONTRACTOR FOR WORK PERFORMED BY OTHERS. ANY COSTS INCURRED BY THE CITY DUE TO THE FAILURE OF THE CONTRACTOR TO COMPLY WITH THESE PROVISIONS WILL BE BORNE BY THE CONTRACTOR. SUCH COSTS WILL INCLUDE CIVIL PENALTIES ASSESSED FOR SOIL EROSION AND SEDIMENTATION CONTROL VIOLATIONS. ANY COSTS INCURRED BY THE CITY FOR WORK PERFORMED BY OTHERS AS PROVIDED ABOVE IN THE EXCESS OF THE COSTS THAT WOULD HAVE BEEN INCURRED HAD THE WORK BEEN PERFORMED BY THE CONTRACTOR WILL BE DEDUCTED FROM RETAINAGE OR OTHER MONIES DUE THE CONTRACTOR OR HIS CONTRACT. MISC - WETLANDS. TREES. STORM PIPING CONTRACTOR TO VERIFY ACTUAL WETLAND BOUNDARY IN THE FIELD PRIOR TO CONSTRUCTION OF BOARDWALK. WETLAND LOCATION WILL DETERMINE BOARDWALKS STARTING /STOPPING LOCATION. ALL DISTURBED AREAS TO BE OVERSEEDED WITH APPROVED MIX. CONTRACTOR SHALL MAINTAIN A WETLAND SEEDING MIX ON SITE TO BE APPLIED TO TEMPORARILY DISTURBED WETLAND AREAS AS DIRECTED BY ENGINEER IN THE FIELD. WETLAND SEED MIX IS PROVIDED IN THE SPECIFICATIONS IN SECTION 02910. WETLAND LOCATION /DELINEATION BY ESI DATED 12/2006 LOCATION OF PIPING FOR DITCHES IS APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY LOCATION AND MATCH PIPING TO DITCH CENTERLINE. SAVE ALL PROMINENT EXISTING TREES PLUS EXISTING TREES AS FLAGGED. IF JUDGMENT IS REQUIRED, CONTACT DESIGNER FOR FIELD ADJUSTMENT. IF EGREGIOUS VIOLATIONS OCCUR AS DETERMINED BY THE OWNER, REPLANTING MAY BE ORDERED AT A COMPENSATORY RATE AT THE CONTRACTORS EXPENSE. SEEDING A. ACCOMPLISH SEEDING BY MEANS OF AN APPROVED POWER -DRAWN SEED DRILL, COMBINATION CORRUGATED ROLLER - SEEDER, APPROVED HAND OPERATED MECHANICAL SEEDER, OR OTHER APPROVED METHODS TO PROVIDE EVEN DISTRIBUTION OF SEED. B. DO NOT SEED WHEN GROUND IS EXCESSIVELY WET OR EXCESSIVELY DRY. AFTER SEEDING, ROLL AREA WITH A ROLLER, NOT LESS THAN 18 INCHES IN DIAMETER AND WEIGHING NOT MORE THAN 210 POUNDS PER FOOT OF WIDTH. UPON COMPLETION OF ROLLING, WATER AREA WITH A FINE SPRAY. C. IMMEDIATELY FOLLOWING SEEDING APPLY MULCH OR MATTING. DO NOT SEED AREAS IN EXCESS OF THAT WHICH CAN BE MULCHED ON SAME DAY. D. APPLY WATER WITH A FINE SPRAY IMMEDIATELY AFTER EACH AREA HAS BEEN MULCHED. SATURATE TO 4 INCHES OF SOIL DEPTH. m 0 W �c a w a V) z a N� N LU 0 I.J. (D N _ � H U Z U w °o(Do � Ur C') M MM 3 � d0 N z LL !.: J m O) 2 04 Z) g �_ q U) H i LL LL w V) jw� MULCHING AND MATTING A. APPLY MULCH OR MATTING AS REQUIRED TO RETAIN SOIL AND GRASS, BUT NO LESS THEN THE FOLLOWING: PRELIMINARY PLANS 1. SLOPES FROM 5:1 OR FLATTER BY SPREADING A LIGHT COVER OF MULCH OVER SEEDED AREA AT THE D® NOT USE FOR CONSTRUCTION RATE OF NOT LESS THAN 92 LBS. PER 1000 SQ.FT. 2. SLOPES GREATER THAN 5:1 MULCH WITH MATTING. PIN MATTING TO THE GROUND WITH WIRE STAPLES AT 5 FOOT INTERVALS, IMMEDIATELY AFTER SEEDING. 3. USE TACK TO PREVENT DISRUPTION OF MULCH. B. FOR TACK USE AN ASPHALT TIE -DOWN OF EMULSIFIED ASPHALT GRADE AE -E OR CUT -BACK ASPHALT ff NOVEMBER 23, 2011 GRADE RC -2 OR OTHER APPROVED EQUAL. AN APPROVED JUTE MESH OR NET MAY BE USED IN LIEU OF IONS: TACKING STRAW MULCH. DATE C. OTHER TYPES OF MULCH AND ANCHORING METHODS MAY BE USED UPON APPROVAL BY THE ENGINEER. ALL STORM PIPING SHALL BE HDPE DBL WALL- SMOOTH INTERIOR EXCEPT WERE OTHERWISE NOTED. SEE DRAINAGE SUMMARY SHEET. D. EXCELSIOR MATTING SHALL MEET NCDOT STANDARD SPECIFICATIONS AND SHALL BE INSTALLED PER PROJECT NO.: APPROVED PLANS. ON ALL STORM PIPING, BURY INVERTS ONLY AS NEEDED. H9001.00 CMP PIPING SHALL HAVE ASPHALT COATING INSIDE AND OUT WHEN DESIGNATED (SEE SPECS). PROTECTION SCALE: NTS ALL PROPOSED CONCRETE WALKWAYS, ASPHALT TRAILS, ETC. WILL BE CONSTRUCTED TO EXISTING A. PROTECT SEEDED AREAS FROM DAMAGE BY BARRICADES, SIGNS, AND OTHER GRADES UNLESS OTHER WISE NOTED ON THE PROFILE. APPROPRIATE MEANS. MAINTAIN AND PROTECT SLOPES FROM WEATHER- DAMAGE. 1 C (D H LU H z o � m z z g COMPACTION NOTES J Q� Uj � STRUCTURAL FILL BENEATH THE PAVED AREAS SHOULD BE PLACED IN UNIFORM LIFTS OF 8 INCHES OR Ce LL � Q � U z T w LESS (LOOSE MEASURE), AND COMPACTED TO AT LEAST 95 PERCENT OF MAXIMUM DRY DENSITY AND 06 W 8 � _ ^ � WITHIN 2 PERCENT OF THE OPTIMUM MOISTURE AS DEFINED BY THE STANDARD PROCTOR COMPACTION Y � W ° � TEST. HOWEVER, THE UPPER 12 INCHES OF THE FILL PLACED SHOULD BE COMPACTED TO 98 PERCENT a N m Cn ° z OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY. TO CONFIRM THAT THE SPECIFIED DEGREE OF Uj COMPACTION IS OBTAINED, FIELD DENSITY TESTING SHOULD BE PERFORMED IN EACH LIFT BY A SOILS U � TECHNICIAN. o 2006 NCDOT ROADWAY ENGLISH STD. DRAWINGS I U ~ J o THE FOLLOWING ROADWAY STANDARDS AS APPEAR IN "ROADWAY STANDARD DRAWINGS" HIGHWAY DESIGN ®� �® BRANCH - N.C. DEPARTMENT OR TRANSPORTATION - RALEIGH, N.C., DATED JULY 187 2006 ARE APPLICABLE TO THIS PROJECT AND BY REFERENCE HEREBY ARE CONSIDERED A PART OF THESE PLANS: STD.NO. TITLE rlC DIVISION 2 - EARTHWORK LV 200.02 Method of Clearing - Method II DIVISION 3 - PIPE CULVERTS LV 300D.01 Method of Pipe Installation - Method 'A' W DIVISION 8 - INCIDENTALS LU 838.01 Concrete Endwall for Single and Double Pipe Culverts - 15" thru 48" Pipe 90° Skew z 838.80 Precast Concrete Endwall - For Single 12" thru 72" Pipe 900 Skew LU O 848.01 Concrete Sidewalk LL 876.01 Rip Rap in Channels 876.02 Guide for Rip Rap at Pipe Outlets 'B' U D 876.04 Drainage Ditches with Class Rip Rap a ADDITIONAL NCDOT STANDARDS NOT ON THE LIST ABOVE MAY BE REQUIRED AS PER PLAN DETAILS AND oC SPECIFICATIONS. D LV Z a J O Q = W z SEEDING A. ACCOMPLISH SEEDING BY MEANS OF AN APPROVED POWER -DRAWN SEED DRILL, COMBINATION CORRUGATED ROLLER - SEEDER, APPROVED HAND OPERATED MECHANICAL SEEDER, OR OTHER APPROVED METHODS TO PROVIDE EVEN DISTRIBUTION OF SEED. B. DO NOT SEED WHEN GROUND IS EXCESSIVELY WET OR EXCESSIVELY DRY. AFTER SEEDING, ROLL AREA WITH A ROLLER, NOT LESS THAN 18 INCHES IN DIAMETER AND WEIGHING NOT MORE THAN 210 POUNDS PER FOOT OF WIDTH. UPON COMPLETION OF ROLLING, WATER AREA WITH A FINE SPRAY. C. IMMEDIATELY FOLLOWING SEEDING APPLY MULCH OR MATTING. DO NOT SEED AREAS IN EXCESS OF THAT WHICH CAN BE MULCHED ON SAME DAY. D. APPLY WATER WITH A FINE SPRAY IMMEDIATELY AFTER EACH AREA HAS BEEN MULCHED. SATURATE TO 4 INCHES OF SOIL DEPTH. m 0 W �c a w a V) z a N� N LU 0 I.J. (D N _ � H U Z U w °o(Do � Ur C') M MM 3 � d0 N z LL !.: J m O) 2 04 Z) g �_ q U) H i LL LL w V) jw� MULCHING AND MATTING A. APPLY MULCH OR MATTING AS REQUIRED TO RETAIN SOIL AND GRASS, BUT NO LESS THEN THE FOLLOWING: PRELIMINARY PLANS 1. SLOPES FROM 5:1 OR FLATTER BY SPREADING A LIGHT COVER OF MULCH OVER SEEDED AREA AT THE D® NOT USE FOR CONSTRUCTION RATE OF NOT LESS THAN 92 LBS. PER 1000 SQ.FT. 2. SLOPES GREATER THAN 5:1 MULCH WITH MATTING. PIN MATTING TO THE GROUND WITH WIRE STAPLES AT 5 FOOT INTERVALS, IMMEDIATELY AFTER SEEDING. 3. USE TACK TO PREVENT DISRUPTION OF MULCH. B. FOR TACK USE AN ASPHALT TIE -DOWN OF EMULSIFIED ASPHALT GRADE AE -E OR CUT -BACK ASPHALT ff NOVEMBER 23, 2011 GRADE RC -2 OR OTHER APPROVED EQUAL. AN APPROVED JUTE MESH OR NET MAY BE USED IN LIEU OF IONS: TACKING STRAW MULCH. DATE C. OTHER TYPES OF MULCH AND ANCHORING METHODS MAY BE USED UPON APPROVAL BY THE ENGINEER. ALL STORM PIPING SHALL BE HDPE DBL WALL- SMOOTH INTERIOR EXCEPT WERE OTHERWISE NOTED. SEE DRAINAGE SUMMARY SHEET. D. EXCELSIOR MATTING SHALL MEET NCDOT STANDARD SPECIFICATIONS AND SHALL BE INSTALLED PER PROJECT NO.: APPROVED PLANS. ON ALL STORM PIPING, BURY INVERTS ONLY AS NEEDED. H9001.00 CMP PIPING SHALL HAVE ASPHALT COATING INSIDE AND OUT WHEN DESIGNATED (SEE SPECS). PROTECTION SCALE: NTS ALL PROPOSED CONCRETE WALKWAYS, ASPHALT TRAILS, ETC. WILL BE CONSTRUCTED TO EXISTING A. PROTECT SEEDED AREAS FROM DAMAGE BY BARRICADES, SIGNS, AND OTHER GRADES UNLESS OTHER WISE NOTED ON THE PROFILE. APPROPRIATE MEANS. MAINTAIN AND PROTECT SLOPES FROM WEATHER- DAMAGE. 1 C CONSTRUCTION ACCESS #2 O 7 4 O CONSTRUCTION -Z ACCESS #1 LL, CONSTRUCTION v�•- ir-rirvrcr+rcr vvr- iv MrvU I AND STREAM CROSSING CONSTRUCTION ACCESS #4 TEMPORARY WETLAND AND STREAM CROSSING 1 ne w J w �1 z W 0 W � DC U Q Z a J O a = � w z H c/' 0 U DC J co N C O r= v Lu H U � � Lu Lu Z w d0 Z LL J O) m q U) H LL 2sZy 2 5 LL w 0 1--i a w oG a z III Z U) z z J O a g Q� kD N Q I..L U w Q = ^ LL Q � Ln w O Y 3 w D w op C� a < d N J O N (n ON Z H U w `) Y U U O Ln w ® I z O > ne w J w �1 z W 0 W � DC U Q Z a J O a = � w z PRELIMINARY PLANS I D® NOT USE FOR CONSTRUCTI ®N DATE: NOVEMBER 23, 2011 REVISIONS: 1 NO. I DATE 1 IPROJECT NO.: CONSTRUCTION H9001.00 ACCESS #5 1D c/' 0 U DC J co N C O Lu H U � � � U Z MM Lu d0 Z LL J O) m q U) H LL 2sZy 2 5 LL w 0 w a w oG a V J V) z a PRELIMINARY PLANS I D® NOT USE FOR CONSTRUCTI ®N DATE: NOVEMBER 23, 2011 REVISIONS: 1 NO. I DATE 1 IPROJECT NO.: CONSTRUCTION H9001.00 ACCESS #5 1D I , I 4 I I SHLD.I I I I ORIGINAL GROUND % _2 I I I I I I I I I I I I I I I I , INSET 1 � I USE INSET 1 WHEN 3' 3' SHLD. CONDITIONS PERMIT I I I I I I ORIGINAL GROUND 6:1 MAX- I I I M,qXI I TI I 18" I PAVEMENT SCHEDULE Cl PROPOSED APPROX. 2" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.513, AT AN AVERAGE RATE OF 224 LBS. PER SQ. YD. J1 PROPOSED 6" AGGREGATE BASE COURSE. T EARTH MATERIAL. V1 GEOTEXTILE SEPERATOR FABRIC 10' -0", 11' -0" W/ RAILING 6" _ #4 BARS @ 12" CTS. 6" CONCRETE TRAIL #4 BARS @ 12" CTS. �- RAILING SEE DETAIL SHEET 2B A f- FIELD BEND i #4 BARS - �� c 6" COMPACTED SUBGRADE 12" CHAIN CONCRETE TRAIL TYPICAL SECTION 1 BEGIN STATION END STATION CHAIN 5' I 5' I i GRADE POINT I 0.02 i 0.02 � �) V1 6' SHLD. 4'W/ SAFETY RAIL 7 3' POTENTIAL Cl SAFETY RAIL =MAX. GRADE TO THIS LINE( T ASPHALT TRAIL TYPICAL SECTION BEGIN STATION -WB- (BEGIN CONSTRUCTION) 15 +20.00 -WBR1- (END BOARDWALK 1) 46 +47.50 -WB- (END BOARDWALK 2) 52 +88.00 -WBR2- (EQUALITY) 69 +75.00 -WBR2- (END BOARDWALK 3) 81 +80.00 -WB- (EQUALITY) 84 +96.32 -WB- (END BOARDWALK 5) 111 +47.01 -WB- (END BOARDWALK 7) 125 +17.85 -WB- (END BOARDWALK 8) 135 +52.85 -WB- (END BOARDWALK 1) 20 +65.00 21 +15.00 (BEGIN BOARDWALK 2) BOARDWALK TYPICAL SECTION BOARDWALK NO. CHAIN BEGIN STATION END STATION 1 -WB- 15 +30.00 20 +65.00 1 - WB- / -WBR1- 21+15.00 46 +47.50 3 -WB R1 - / -WB- 53 +72.00 52 +88.00 4 -WBR2- 77 +90.00 81+80.00 5 -WB- 109 +97.01 111+47.01 6 -WB- 118 +33.42 122 +86.85 7 -WB- 124 +27.85 125 +17.85 8 -WB- 135 +02.85 135 +52.85 BOARDWALK 4 DOES NOT EXIST PROVIDE A SAFETY RAIL FOR THE FOLLOWING CIRCUMSTANCES: SLOPE >_ 3:1 AND DROP OF 6' SLOPE >_ 2:1 AND DROP OF 4' SLOPE >_ 1:1 AND DROP OF 1' ORIGINAL GROUND NOTES: - TRANSITION SUPERELEVATION AS SHOWN ON PLANS - TYP. DISTANCE IS 101 . - USE 6' SHOULDER IN FILL SECTIONS AND 3' SHOULDER IN CUT SECTIONS. END STATION 15 +30.00 (BEGIN BOARDWALK 1) 53 +72.00 (BEGIN BOARDWALK 2) 69 +75.00 (EQUALITY) 77 +90.00 (BEGIN BOARDWALK 3) 84 +96.32 (EQUALITY) 109 +97.01 (BEGIN BOARDWALK 5) 118 +33.42 (BEGIN BOARDWALK 6) 135 +02.85 (BEGIN BOARDWALK 8) 142 +26.18 (END CONSTRUCTION) 4 A All nl CArl BRIDGE NO. S1 (10') BRIDGE TYPICAL SECTION CHAIN BEGIN STATION -WB- 122 +86.85 END STATION 124 +27.85 m 0 W �c a w a V) z a ne w J w �1 z W 0 W � DC U Q Z a J O a = � w z N- N 0 LJ� Lu i N � C'4 CO H z co � Z U > <-Tomm 3 ��Ur MM d0 Z LL J 01 ' 2 C14 U) LL L W n t/) ♦F - v J PRELIMINARY PLA S I D® NOT USE FOR CONSTRUCTI ON DATE: NOVEMBER 23, 2011 REVISIONS: NO. DATE IPROJECT NO.: H9001.00 z NTS H r= v Lu Lu w z III z u) LA J g QLu lco:l N a u w= a ^ LL Q � ,T w O 0 Lu L � �w�� 0 � � a N N u QJ a p1 m z U w `) Y U U Ln Ln effag CD w ® I z O > m 0 W �c a w a V) z a ne w J w �1 z W 0 W � DC U Q Z a J O a = � w z N- N 0 LJ� Lu i N � C'4 CO H z co � Z U > <-Tomm 3 ��Ur MM d0 Z LL J 01 ' 2 C14 U) LL L W n t/) ♦F - v J PRELIMINARY PLA S I D® NOT USE FOR CONSTRUCTI ON DATE: NOVEMBER 23, 2011 REVISIONS: NO. DATE IPROJECT NO.: H9001.00 z NTS MIN. 10 GA. LINE WIRES 8' MAX. VARIABLE AS DIRECTED BY THE ENGINEER SILT FENCE FABRIC INSTALLED TO SECO WIRE FROM TOP FRONT VIEW NOTES: - END OF SILT FENCE SHOULD BE TURNED UPHILL - SEE N.C. STATE DENR PRACTICE STANDARDS & SPECIFICATIONS SEDIMENT FENCE SET FOR CONDITIONS WHERE PRACTICE APPLIES PLANNING CONSIDERATIONS & DESIGN CRITERIA. (HOWEVER FLOW o SHALL NOT RUN PARALLEL WITH THE TOE OF THE FENCE). N STEEL FENCE POST WIRE FENCE HARDWARE CLOTH MIN. 12 -1/2 GA. NCDOT SEDIMENT CONTROL STONE INTERMEDIATE WIRES GRADE STEEL POST TOP OF SILT FENCE WOVEN WIRE FABRIC MUST BEAT LEAST 1' IS ALWAYS REQUIRED ABOVE THE TOP OF SILT FENCE GEOTEXTILE FABRIC THE WASHED STONE _ `FILL SLOPE o CO° — � t * FOR REPAIR OF SILT FENCE FAILURES, USE No. 57 WASHED STONE GRADE FOR ANCHOR WHEN SILT FENCE IS PROTECTING CATCH BASIN. IN EACH CASE THE SILT FENCE IS TO BE PROPERLY ENTRENCHED & THE o 6" MIN. COVER STONE SHALL BE AT A MINIMUM OF 16" ABOVE GRADE AT THE N OVER SKIRT DIRECTION OF FLOW & BETWEEN 60 - 45 DEGREES. ANCOR SKIRT AS DIRECTED BY ENGINEER. SIDE VIEW ,� STANDARD TEMPORARY SILT FENCE x p ,. CHANNEL BOTTOM ch PLAN VIEW 4 x DIAMETER T FILTER FABRIC SEE PLANS FOR QUANTITIES SECTION A -A 40" 4 x DIAMETER FILTER FABRIC J SEE PLANS FOR QUANTITIES SECTION B -B PIPE OUTLET PROTECTION c� TREE PROTECTION AREA v 18" c� DO NOT ENTER WARNING SIGN DETAIL NOTES: 3' FILTER FABRIC ON GROUND BURY WIRE FENCE AND HARDWARE CLOTH BURY 6" OF UPPER EDGE OF FILTER FABRIC IN TRENCH SECTION VIEW A' RAIA1 nn r'KICE STEEL FENCE POST SET MAX 2' APART - I�- MIN. 18" INTO SOLID GROUND FRONT VIEW SILT FENCE OUTLET L l NOTES: FOOTING SIZE PIPE SIZE C.O.R. STD # 40.01 TYPE A 8" TYPE B PIPE OUTLET TO FLAT AREA WITH NO DEFINED CHANNEL PIPE OUTLET TO WELL- DEFINED CHANNEL 12" 24" >3611- 54" 18" 36" SINGLE x �-4Ur MM Lu TREE PROTECTION AREA DO NOT ENTER TREE PROTECTION AREA DO NOT ENTER 1' w � 0 w F_ � w ~ w (n d a V J �1 Ao z Q a B B x p ,. CHANNEL BOTTOM ch PLAN VIEW 4 x DIAMETER T FILTER FABRIC SEE PLANS FOR QUANTITIES SECTION A -A 40" 4 x DIAMETER FILTER FABRIC J SEE PLANS FOR QUANTITIES SECTION B -B PIPE OUTLET PROTECTION c� TREE PROTECTION AREA v 18" c� DO NOT ENTER WARNING SIGN DETAIL NOTES: 3' FILTER FABRIC ON GROUND BURY WIRE FENCE AND HARDWARE CLOTH BURY 6" OF UPPER EDGE OF FILTER FABRIC IN TRENCH SECTION VIEW A' RAIA1 nn r'KICE STEEL FENCE POST SET MAX 2' APART - I�- MIN. 18" INTO SOLID GROUND FRONT VIEW SILT FENCE OUTLET L l NOTES: FOOTING SIZE PIPE SIZE WIDTH DEPTH 15"-24" 8" 12" >24" - 36" 12" 24" >3611- 54" 18" 36" T FILTER FABRIC H = RIP RAP TO TOP OF PIPE (MAX. H = D +T) T = 15" CLASS 'I' RIPRAP T = 12" CLASS 'B' RIP RAP 1/2 DIAMETER OF PIPE OR 12" WHICHEVER IS GREATER FILTER FABRIC CAPACITY OF PIPE CULVERTS TOGETHER = BANK FULL FLOW TEMPORARY STREAM CROSSING SUMMARY CHAIN STATION DIAMETER NOTES -WB- 52 +50 48" HDPE DOUBLE -WB- 118 +00 48" HDPE SINGLE �-4Ur MM Lu TREE PROTECTION AREA DO NOT ENTER 1. WARNING SIGNS TO BE MADE OF DURABLE, WEATHERPROOF MATERIAL. 2. LETTERS TO BE 3" HIGH MINIMUM, CLEARLY LEGIBLE AND SPACED AS DETAILED. 3. SIGNS SHALL BE PLACED AT 50' MAXIMUM INTERVALS. 4. PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. 5. FOR TREE PROTECTION AREAS LESS THAN 200' IN PERIMETER, PROVIDE NO LESS THAN ONE SIGN PER PROTECTION AREA. 6. ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC. 7. MAINTAIN TREE PROTECTION FENCE THROUGHOUT DURATION OF PROJECT. 8. ADDITIONAL SIGNS MAY BE REQUIRED BY CITY OF RALEIGH INSPECTIONS DEPARTMENT BASED ON ACTUAL FIELD CONDITIONS. 9. PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. 10. FOR CONDITIONS WHERE PRACTICE APPLIES; PLANNING CONSIDERATIONS ( HOWEVER FLOW SHALL NOT RUN PARALLEL WITH THE FENCE) AND DESIGN CRITERIA. 11. END OF SILT FENCE NEEDS TO BE TURNED UPHILL. 12. SEE N.C. STATE DENR PRACTICE & SPECIFICATION SEDIMENTS FENCE SECTION. FOR CONDITIONS WHERE PRACTICE APPLIES; PLANNING CONSIDERATIONS. 13. SEE N.C. STATE DENR PRACTICE & SPECIFICATION SEDIMENTS FENCE SECTION. (HOWEVER FLOW SHALL NOT RUN PARALLEL WITH THE FENCE) STEEL POST -WOVEN WIRE FABRIC — WARNING SIGN SILT FENCE GEOTEXTILE FABRIC MIN. 10 GA. LINE WIRES o N FILL SLOPE co z M GRADE -VIII 6" MIN. COVER 9 1111111 lily l I OVER SKIRT N 1 EXTEND WIRE 6" MIN. INTO TRENCH AND ANCHOR SKIRT AS DIRECTED BY ENGINEER 8' MAX. VARIARI F AR nIRFCTFn RY THE FNrINFFR TM WARNING SIGN TM Tm LJ� J po N C O � w � � co � U z �-4Ur MM Lu TREE PROTECTION AREA DO NOT ENTER TREE PROTECTION AREA DO NOT ENTER m t co I— LL 2sZy � 5 LL w 0 w F_ a w (n d a V J �1 Ln z a SILT FENCE FABRIC INSTALLED TO SECOND WIRE FROM TO �� m �=X\/ mx�� III III it IIIIIIIIII IIII VIII VIII VIII VIII VIII VIII VIII VIII VIII VIII VIII VIII FRONT VIEW VIII VIII VIII VIII VIII VIII III VIII III III III MIN. 12 -1/2 GA. INTERMEDIATE WIRES GRADE I III SIDE VIEW * FOR REPAIR FAILURES, ES, SILT USE SILT/ TREE PROTECTION FENCE FENCE FAILURES, USE No. 57 WASHED STONE. FOR ANCHOR WHEN SILT 6 FENCE IS PROTECTING C. 0. R. STD # 40.03 CATCH BASIN. MIN. 10 GA. LINE WIRES DESIGN CRITERIA NOTES = F-� Lu THE DRAINAGE AREA IS LIMITED TO ONE HALF ACRE. 1. PLACE STONE TO THE LINE AND DIMENSION SHOWN IN THE PLAN CD w KEEP A MAXIMUM HEIGHT OF 2 FEET AT THE CENTER OF ON A FILTER FABRIC FOUNDATION. 11-4 z THE DAM. 2. KEEP THE CENTER STONE SECTION AT LEAST 9 INCHES BELOW J p z KEEP THE CENTER OF THE CHECK DAM AT LEAST 9 INCHES NATURAL GROUND LEVEL WHERE THE DAM ABUTS THE CHANNEL H w - g LOWER THAN THE OUTER EDGES AT NATURAL GROUND BANKS. w ELEVATION. 3. EXTEND STONE AT LEAST 1.5 FEET BEYOND THE DITCH BANK TO U Q U KEEP THE SIDE SLOPES OF THE DAM AT 2:1 OR FLATTER KEEP WATER FROM CUTTING AROUND THE ENDS OF THE CHECK w = Z N z ENSURE THAT THE MAXIMUM SPACING BETWEEN DAMS DAM. LL Q� 'n w PLACES THE TOE OF THE UPSTREAM DAM AT THE SAME 4. SET SPACING BETWEEN DAMS TO ASSURE THAT THE ELEVATION O 06 W tD ^o Lu ELEVATION AS THE TOP OF THE DOWNSTREAM DAM. AT THE TOP OF THE LOWER DAM IS THE SAME AS THE TOE Y w w 00 STABILIZE OUTFLOW AREAS ALONG THE CHANNEL TO ELEVATION OF THE UPPER DAM. c N � J o� RESIST EROSION. 5. PROTECT THE CHANNEL AFTER THE LOWEST CHECK DAM FROM a N V m USE NCDOT CLASS B RIP RAP AND LINE THE UPSTREAM HEAVY FLOW THAT COULD CAUSE EROSION. 11-4 w SIDE OF THE DAM WITH NCDOT SEDIMENT CONTROL STONE. 6. MAKE SURE THAT THE CHANNEL REACH ABOVE THE MOST U V) KEY THE STONE INTO THE DITCH BANKS AND EXTEND IT UPSTREAM IS STABLE. Y BEYOND THE ABUTMENTS A MINIMUM OF 1.5 FEET TO 7. ENSURE THAT OTHER AREAS OF THE CHANNEL, SUCH AS CULVERT U AVOID WASHOUT FROM OVERFLOW AROUND THE DAM. ENTRANCES BELOW THE CHECK DAMS, ARE NOT SUBJECT TO ® ®�� d�o� v O DAMAGE OR BLOCKAGE FROM DISPLACED STONES. - 99 I °� u w 12" OF NCDOT SEDIMENT ® II O U 9 MIN. 1.5' MIN CONTROL STONE 1.5 `�'� U > 4 ,: *1 CLASS B RIP -RAP 2' MAX AT CENTER FILTER CLOTH FILTER CLOTH " PURPOSE: TO REDUCE EROSION IN A CHANNEL BY REDUCING THE FENCE, VELOCITY OF FLOW. 3RIC, .WARE DO NOT USE CHECK DAM IN INTERMITTENT OR PERENNIAL STREAMS. CLOTH IN TRENCH SEE DENR STANDARDS & SPECS. FOR COMPLETE DESIGN CRITERIA & MAINTENANCE 6" DEEP COARSE AGGREGATE i? CHECK DAM EARTH FILL COVERED BY LARGE ANGULAR ROCK FLOW EARTH FILL COVERED BY LARGE ANGULAR ROCK COARSE AGGREGATE N 25' MINIMUM 25' MINIMUM STREAM CHANNEL TOP OF BANK TOP OF BANK 5 1 STANDARD TEMPORARY STREAM CROSSING 40" M TREE PROTECTION AREA 18" ih DO NOT ENTER WARNING SIGN DETAIL 8' MAX. VARIABLE AS DIRECTED BY THE ENGINEER PLAN NOTES: WARNING SIGNS TO BE MADE OF DURABLE, WEATHERPROOF MATERIAL. LETTERS TO BE 3" HIGH MINIMUM, CLEARLY LEGIBLE AND SPACED AS DETAILED. SIGNS SHALL BE PLACED AT 50' MAXIMUM INTERVALS. PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. FOR TREE PROTECTION AREAS LESS THAN 200' IN PERIMETER, PROVIDE NO LESS THAN ONE SIGN PER PROTECTION AREA. ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC. MAINTAIN TREE PROTECTION FENCE THROUGHOUT DURATION OF PROJECT. ADDITIONAL SIGNS MAY BE REQUIRED BY CITY OF RALEIGH INSPECTIONS DEPARTMENT BASED ON ACTUAL FIELD CONDITIONS. PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. TM WARNING SIGN TM F U LJ� J po N C O � w � � co � U z �-4Ur MM Lu TREE PROTECTION AREA DO NOT ENTER m t co I— LL 2sZy � 5 LL w 0 w F_ a w (n d a V J �1 Ln z a III III �I IIIIIIIIII VIII VIII (IIII (IIII VIII VIII VIII (IIII —VIII VIII — (IIII —VIII (IIII — (IIII ORANGE, UV RESISTANT HIGH - TENSILE STRENGTH POLY BARRICADE FABRIC (TYPICAL) — (IIII — (IIII —VIII VIII VIII IIII FRONT VIEW 7 MIN. 12 -1/2 GA. INTERMEDIATE Er WIRES GRADE VIII III - c N TREE PROTECTION FENCE C.O.R. STD # 40.04 "I POST )VEN WIRE FABRIC ARNING SIGN )RANGE, UV RESISTANT JIGH - TENSILE STRENGTH 3OLY BARRICADE FABRIC (TYPICAL) SIDE VIEW NOTE: FOR TREE PROTECTION ONLY w J w �1 z W 0 W � DC U Q Z a J O a = � w z PRELIMINARY PLANS I D® NOT USE FOR CONSTRUCTI ®N r ATE: NOVEMBER 23, 2011 VISIONS: NO. DATE PROJECT NO.: H9001.00 SCALE: NTS 2A N F U LJ� J po N C O � w � � co � U z �-4Ur MM Lu d0 z m t co I— LL 2sZy � 5 LL w 0 w F_ a w (n d a V J �1 Ln z a PRELIMINARY PLANS I D® NOT USE FOR CONSTRUCTI ®N r ATE: NOVEMBER 23, 2011 VISIONS: NO. DATE PROJECT NO.: H9001.00 SCALE: NTS 2A A B 61_LNI GENERALNOTES 1. ALL CONCRETE TO BE 3600 PSI COMPRESSIVE STRENGTH 2. TYPE OF PIPE TO BE USED IS 1 -5/8" MAX. O.D. BLACK IRON, LOW CARBON PIPE 3. ALL JOINTS TO HAVE Al /" FILLET WELD. 4. ALL METAL SHALL BE GALVANIZED PER SPECIFICATIONS. (_ —ol �42" OR 48" SAFETY RA�IL Mnl 11 nCO /T /n x 'X' DIMENSION 42" SAFTEY RAIL: A = 1' -2" 48" SAFETY RAIL: A = 1' -4" STOP SIGN GREENWAY TRAIL HINGED BOLLARD BOULDER (TYP. ) SEE DETAIL BOULDERS TO BE SUPPLIED BY CITY OF RALEIGH TRANSPORT AND PLACEMENT BY CONTRACTOR C) 6" YELLOW PAVEMENT MARKING 1/2" EXPANSION JOINT (SEE DETAIL 6, THIS SHEET) WHEN TIEING TO TIE TO EXISTING CONCRETE SURFACE N CONCRETE /ASHPALT 5FT RADIUS UNLESS OTHERWISE NOTED r-------------L----------------------------------------------------------1--------- PLAN VIEW 2' -6" SQUARE FOOTING HINGED BOLLARD & BOULDERS NOTE: BOULDERS PROVIDED BY THE CITY OF RALEIGH 51 CONSTRUCTION ENTRANCE POST! 5" SQ PO: POST CAP OPTIONS NOTES: U Lu E U 1. PUT SILT FENCE OR TREE PROTECTION FENCE UP TO EXISTING z= �o Q ENSURE CONSTRUCTION ENTRANCE IS USED. ROADWAY } 3 � ��Ur MM U- d0 N z 2. IF CONSTRUCTION ON THE SITES ARE SUCH THAT THE MUD 11/2" X 51/2" RAIL 0° c 1 IS NOT REMOVED BY THE VEHICLE TRAVELING OVER THE cn STONE, THEN THE TIRES OF THE VEHICLE MUST BE D �' -n WASHED BEFORE ENTERING THE PUBLIC ROAD. 0 c Rm 14@11 30" W � � , m n o � w ce 2 m D -1 m K 3. IF A PROJECT CONTINUES TO PULL MUD AND DEBRIS ON U) z ? r' TO THE PUBLIC ROAD, THE GOVERNING AUTHORITY WILL cn p CLEAN THE AREA AND INVOICE THE FINANCIALLY °_ `O zi m m o RESPONSIBLE PERSON AS INDICATED ON THE FINANCIAL m w RESPONSIBILITY FORM. PLAN D! d N 25' OR FULL WIDTH J C11 OF PROPOSED STREET NEW CONSTRUCTION OR ENTRANCE, EXISTING ROADWAY WHICHEVER IS 35' MIN. 15' MIN. GREATER. U 12" MIN. 6" MIN. FABRIC UNDER STONE 51 CONSTRUCTION ENTRANCE POST! 5" SQ PO: POST CAP OPTIONS = U U Lu E U LJ� rn V J m z= �o Q � C(j 10%" } 3 � ��Ur MM U- d0 N z � J- C r6- At 2 GREENWAY ENTRANCE 6 "x 6" POST, S.Y.P. PRESSURE TREATED FOR GROUND CONTACT (SEE SPECS) TOP OF CONCRETE FOOTING TO DRAIN AWAY FROM BOLLARD L "' CONCRETE FOOTING 1" BEVEL @ 45° (TYP) STEEL PLATE HOLE FOR LOCK 1/2 " DIA. 4" GRAVEL BASE COMPACTED SUBGRADE PERMANENT BARRIER WOOD BOLLARD BOLLARDS R' -n,, (TR Tf) (TR 4 11 10 FT. UCTION TRAIL OBSTRUCTION WITHIN PAVEMENT MARKING 3 NOTE: SEE 2009 MUTCD HOLE FOR LOCK 1/2 " DIA. FINISH GRADE 611 311 1/4" 6 11X3" X %" STEEL BOLLARD 00 3 "X13"XY2' 7Y4" STEELPLAI TACK WELD TYP. 1 "X10 "Sl LOCK P c'') 1" X 10" STE HINGE PIP BOLLARD B STEEL PLATE << HINGE PIN' N CONCRETE A FOOTING 0) 2 -6 "X2- 6"X2' B LOCK PIN PLANc I SECTION A -A HINGED BOLLLARD 7' -7" FACE TO FACE ;AP 211 H U Lu E U LJ� rn V ;T w w � Lc'4, H U � C(j 10%" H 3 � ��Ur MM U- d0 N z � J- C 11/2" X 51/2" RAIL cn 1 w a ° NOTES: 1. FENCE TO BE MASTER HALCO THREE -RAIL RANCH STYLE ♦^ 14@11 30" FENCE WITH NOMINAL 8' SECTION LENGTH FOOTING WIDTH TO BE (2X) POST WIDTH. MINIMUM DEPTH 30 ". DETAIL FOR WHITE VINYL FENCE 54" C cC c 1/14 N \TYI Y4 3 "X6 Y4 "X STEEL PLA- 1114 TyI 2 "X1 1/2"X CHAIN LINK FENCE SECTION B -B O.D. TOP RAZE BALE CAP 3" O.D. GALVANIZED STEEL END POST 2 4' MESH GALVANIZED STEEL CHAIN LINK FABRIC WITH BLACK VINYL COATING 2" O.D. GALVANIZED STEEL _INE /INTERMEDIATE POST 5 4 X 4 TENSION BANDS WITH TENSION BAR AT ENDS AND CORNERS 156" O.D. TRUSS ROD WITH TURNBUCKLE (@ EQUAL START/STOP SECTION) TIES 24" O.C. ALONG TOP AND BOTTOM RAIL TENSION WIRE GROUND WIRE fli�o I� ne w J w �1 z W 0 W � DC U Q Z a J O a = � w z a w z z g a Z w w a C� O z w V) Y U O Ln Q w z J U O > H U Lu E U LJ� rn V CO w w � Lc'4, H U � C(j H 3 � ��Ur MM U- d0 N z � J- C Z cn 0 w a ° a 0G a ♦^ V) z � w ce 2 N U 00 00 LL � � r' ,T O L w °_ `O (D o � w '-1 ° D! d N J C11 N (n ON U fli�o I� ne w J w �1 z W 0 W � DC U Q Z a J O a = � w z a w z z g a Z w w a C� O z w V) Y U O Ln Q w z J U O > PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION f ATE: NOVEMBER 23, 2011 EVISIONS: NO. DATE PROJECT NO.: H9001.00 SCALE: NTS t U Lu E U LJ� J co N CLf:)) CO � Lc'4, H U � C(j Za�oO�o w °o =0°00°0 3 ��Ur MM U- d0 N z � J- C 2 0 w a a 0G a ♦^ V) z a PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION f ATE: NOVEMBER 23, 2011 EVISIONS: NO. DATE PROJECT NO.: H9001.00 SCALE: NTS t I I I I I I� PERVIOUS DIKE - EXISTING TERRAIN a TEMPORARY SEDIMENTATION BAG i 15 X 10 TEMPORARY SEDIMENTATION BAG`. L PUMP TO SEDIMENTATION BAG SLOPE DRAIN INLET G­TMCA \A InAAII/ NOTE: PROVIDE STABILIZED OUTLET TO STREAMBANK )RAIN DRAW DETAIL FOR CULVERT CONSTRUCTION AT WET STREAMS AND DITCHES TEMPORARY SEDIMENTATION BAG(S): Z) IMPERVIOUS DIKE: (j H W O THE TEMPORARY SEDIMENTATION BAG(S) SHALL BE USED TO FILTER PUMPED WATER w DURING THE DRILLED PIER OPERATION, FOOTING EXCAVATION, AND /OR CULVERT OR ol� PIPE CONSTRUCTION. W zU) U Q THE FILTER FABRIC SHALL MEET THE REQUIREMENTS OF SECTION 1056 FOR TYPE 2 Z z FABRIC. pe THE WORK COVERED BY THIS SECTION CONSISTS OF FURNISHING, INSTALLING, J ° SEDIMENT CONTROL STONE SHALL MEET THE REQUIREMENTS OF SECTION 1005 AND W z a SHALL BE CLEAN OF DIRT AND DEBRIS. INSTALL STONE ACCORDING TO THE DETAIL g SHOWN ON THE PLANS. j _ MAINTAINING, AND REMOVING AN IMPERVIOUS DIKE FOR THE PURPOSE OF DIVERTING w Lu U N IT. THIS DEVICE SHALL BE CONSTRUCTED SUCH THAT IT IS PORTABLE AND CAN BE z USED ADJACENT TO THE DRILLED PIER OPERATION, FOOTING EXCAVATION, AND /OR NORMAL STREAM FLOW AROUND THE CONSTRUCTION SITE. THE CONTRACTOR SHALL w = N Z IN. (MAXIMUM) SPOUT FOR RECEIVING PUMP DISCHARGE. THE BAG SEAMS SHALL BE � J ° o N �� N CD ,,o-C O CONSTRUCT AN IMPERVIOUS DIKE IN SUCH A MANNER APPROVED BY THE ENGINEER. L SHALL HAVE A MINIMUM WIDE WIDTH STRENGTH AS FOLLOWS. z Lu TEST METHOD MINIMUM SPECIFICATIONS J 01 m T c � U A E W THE IMPERVIOUS DIKE SHALL NOT PERMIT SEEPAGE OF WATER INTO THE CONSTRUCTION Y � w 0 c9 SPECIFICATIONS FOR FLOW RATES, STRENGTH, AND PERMEABILITY: SITE OR CONTRIBUTE TO SILTATION OF THE STREAM. THE IMPERVIOUS DIKE SHALL Q N J o GRAB TENSILE ASTM D -4632 LB 200.0 BE CONSTRUCTED OF AN ACCEPTABLE MATERIAL IN THE LOCATIONS NOTED ON THE PUNCTURE ASTM D -4833 LB 130.0 a N Ln °' z � PLANS OR AS DIRECTED BY THE ENGINEER. (> WITH THE DETAILS IN THE PLANS AND AT LOCATIONS AS DIRECTED BY THE ENGINEER. PRELIMINARY PLANS Lu IOUS ' G D® NOT USE FOR CONSTRUCTI ®N ACCEPTABLE MATERIALS SHALL INCLUDE BUT NOT BE LIMITED TO SHEET PILES ® ®�� ��� Y L ° N ' THE BAG WITHOUT GOING THROUGH THE WALLS. SANDBAGS, AND /OR THE PLACEMENT OF AN ACCEPTABLE SIZE STONE LINED WITH gag DATE: NOVEMBER 23, 2011 °� REVISIONS: Z w SAND BAGS / ; � DATE POLYPROPYLENE OR OTHER IMPERVIOUS FABRIC. �, II �� o QUANTITY OF BAGS TO CONTAIN SILT FROM PUMPED EFFLUENT DURING PROJECT NO.: THE DRILLED PIER OPERATION, FOOTING EXCAVATION, AND /OR CULVERT OR PIPE EARTH MATERIAL SHALL NOT BE USED TO CONSTRUCT AN IMPERVIOUS DIKE WHEN IT IS H9001.00 STILLING BASINS WILL BE MEASURED AND PAID FOR PER EACH. THIS PAYMENT WILL SCALE: NTS BE FULL COMPENSATION FOR ALL WORK COVERED BY THIS PROVISION, INCLUDING BUT STREAM NOT LIMITED TO, FURNISHING ALL MATERIALS, PLACING AND MAINTAINING THE IN DIRECT CONTA CT WITH THE STREAM. THE TEMPORARY SEDIMENTATION BAG(S), AND REMOVAL AND DISPOSAL OF SILT 2C ACCUMULATIONS AND BAG. 1 NO DIRECT PAYMENT SHALL BE MADE FOR THE WORK OF INSTALLATION MAINTENANCE 3 AND REMOVAL OF IMPERVIOUS DIKES AND RELATED WORK AS DESCRIBED IN THIS PROVISION. PAYMENT FOR SUCH WORK SHALL BEDISTRIBUTED AMONG THE VARIOUS PAY J � ITEMS. H � SLOPE DRAIN �. - W -- �� J 15 X 10 TEMPORARY SEDIMENTATION BAG`. L PUMP TO SEDIMENTATION BAG SLOPE DRAIN INLET G­TMCA \A InAAII/ NOTE: PROVIDE STABILIZED OUTLET TO STREAMBANK )RAIN DRAW DETAIL FOR CULVERT CONSTRUCTION AT WET STREAMS AND DITCHES TEMPORARY SEDIMENTATION BAG(S): Z) THE WORK COVERED BY THIS SECTION CONSISTS OF FURNISHING, PLACING, AND W z REMOVING A TEMPORARY SEDIMENTATION BAG(S) AS DIRECTED BY THE ENGINEER. W O THE TEMPORARY SEDIMENTATION BAG(S) SHALL BE USED TO FILTER PUMPED WATER W DURING THE DRILLED PIER OPERATION, FOOTING EXCAVATION, AND /OR CULVERT OR ol� PIPE CONSTRUCTION. Q U Q THE FILTER FABRIC SHALL MEET THE REQUIREMENTS OF SECTION 1056 FOR TYPE 2 FABRIC. pe SEDIMENT CONTROL STONE SHALL MEET THE REQUIREMENTS OF SECTION 1005 AND W z a SHALL BE CLEAN OF DIRT AND DEBRIS. INSTALL STONE ACCORDING TO THE DETAIL J SHOWN ON THE PLANS. j _ THE TEMPORARY SEDIMENTATION BAG(S) SHALL BE A WATER PERMEABLE FABRIC BAG 3 THAT TRAPS SAND, SILT, AND FINES AS SEDIMENT LADEN WATER IS PUMPED INTO W IT. THIS DEVICE SHALL BE CONSTRUCTED SUCH THAT IT IS PORTABLE AND CAN BE z USED ADJACENT TO THE DRILLED PIER OPERATION, FOOTING EXCAVATION, AND /OR CULVERT OR PIPE CONSTRUCTION. THE TEMPORARY SEDIMENTATION BAG(S) SHALL BE A BAG CONSTRUCTED TO A MINIMUM SIZE OF 10'X 15' MADE FROM A NONWOVEN FABRIC. IT SHALL HAVE A SEWN -IN 8 w o J � U IN. (MAXIMUM) SPOUT FOR RECEIVING PUMP DISCHARGE. THE BAG SEAMS SHALL BE � J ° o N �� N CD ,,o-C O SEWN WITH A DOUBLE NEEDLE MACHINE USING A HIGH STRENGTH THREAD. THE SEAMS Z Q SHALL HAVE A MINIMUM WIDE WIDTH STRENGTH AS FOLLOWS. Lu � = M M o c� N Z � TEST METHOD MINIMUM SPECIFICATIONS J 01 m T c � U A E W ASTM D -4884 60 LB/IN W c � THE FABRIC USED TO CONSTRUCT THE BAG SHALL BE STABILIZED TO PROVIDE a RESISTANCE TO ULTRA- VIOLET DEGRADATION AND MEET THE FOLLOWING z SPECIFICATIONS FOR FLOW RATES, STRENGTH, AND PERMEABILITY: PROPERTY TEST METHOD UNITS MIN. SPECIFICATIONS SPECIFICATIONS WEIGHT ASTM D -3776 OZ/YD 8.0 GRAB TENSILE ASTM D -4632 LB 200.0 PUNCTURE ASTM D -4833 LB 130.0 FLOW RATE ASTM D -4491 GAL /MIN /SF 80.0 PERMITTIVITY ASTM D -4991 1 /SEC 1.2 UV RESISTANCE ASTM D -4355 % 70.0 THE CONTRACTOR SHALL INSTALL THE TEMPORARY SEDIMENTATION BAG IN ACCORDANCE WITH THE DETAILS IN THE PLANS AND AT LOCATIONS AS DIRECTED BY THE ENGINEER. PRELIMINARY PLANS D® NOT USE FOR CONSTRUCTI ®N THE TEMPORARY SEDIMENTATION BAG(S) SHALL BE PLACED SO THE INCOMING WATER FLOWS INTO AND THROUGH THE BAG WITHOUT CAUSING EROSION. THE NECK OR SPOUT OF THE BAG SHALL BE TIED OFF TIGHTLY TO STOP THE WATER FROM FLOWING OUT OF THE BAG WITHOUT GOING THROUGH THE WALLS. THE TEMPORARY SEDIMENTATION BAG(S) SHALL BE REPLACED AND DISPOSED OF WHEN DATE: NOVEMBER 23, 2011 IT IS 3/4 FULL OF SEDIMENT OR WHEN IT IS IMPRACTICAL FOR THE BAG TO FILTER REVISIONS: THE SEDIMENT OUT AT A REASONABLE FLOW RATE. PRIOR APPROVAL FROM THE NO. DATE ENGINEER MUST BE RECEIVED BEFORE REMOVAL AND REPLACEMENT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING A SUFFICIENT QUANTITY OF BAGS TO CONTAIN SILT FROM PUMPED EFFLUENT DURING PROJECT NO.: THE DRILLED PIER OPERATION, FOOTING EXCAVATION, AND /OR CULVERT OR PIPE CONSTRUCTION. H9001.00 STILLING BASINS WILL BE MEASURED AND PAID FOR PER EACH. THIS PAYMENT WILL SCALE: NTS BE FULL COMPENSATION FOR ALL WORK COVERED BY THIS PROVISION, INCLUDING BUT NOT LIMITED TO, FURNISHING ALL MATERIALS, PLACING AND MAINTAINING THE TEMPORARY SEDIMENTATION BAG(S), AND REMOVAL AND DISPOSAL OF SILT 2C ACCUMULATIONS AND BAG. OEM, Seeding mixture Species Rate (Iblacre) Rye (grain) 120 Annual lespedeza (Kobe in Piedmont and Coastal Plain, Korean in Mountains) 50 Omit annual lespedeza when duration of temporary cover is not to extend beyond June. Seeding dates Mountains—Above 2500 feet: Feb. 15 - May 15 Below 2500 feet: Feb. 1- May 1 Piedmont—Jan. 1 - May 1 Coastal Plain—Dec. I -Apr. 15 Soil amendments Follow recommendations of soil tests or apply 2,000 lb/acre ground agricultural limestone and 750 lb/acre 10-10-10 fertilizer. Mulch Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Refertilize if growth is not fully adequate. Reseed, refertilize, and mulch immediately following erosion or other damage. Seeding mixture Species' Rate (Iblacre) Tall fescue 80 Sericea lespedeza 20 Kobelespedeza 10 Seeding notes 1. After Aug. 15, use unscarified sericea seed. 2. Where periodic mowing is planned or a neat appearance is desired, omit sericea and increase Kobe lespedeza to 40 lb/acre. 3. To extend spring seeding dates into June, add 15 lb/acre hulled Bermudagrass. However, after mid-Apr. it is preferable to seed temporary cover. Nurse plants Between May 1 and Aug. 15, add 10 lb/acre German millet or 15 lb/ acre Sudangrass. Prior to May 1 or after Aug. 15, add 40 Iblacre rye (grain). Best Possible Fall: Aug. 25 - Sept. 15 Aug. 20 - Oct. 25 Late Winter: Feb. 15 - Mar. 21 Feb. 1 -Apr. 15 Fall is best for tall fescue and late winter for lespedezas. Overseeding of Kobe lespedeza over fall-seeded tall fescue is very effective. Soil amendments Apply lime and fertilizer according to soil tests, or apply 4,000 lb/acre ground agricultural limestone and 1,000 Iblacre 10-10-10 fertilizer. Mulch Apply 4,000 Iblacre grain straw or equivalent cover of another suitable mulch. Anchor straw by tacking with asphalt, netting, or roving or by crimping with a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Refertilize in the second year unless growth is fully adequate. May be mowed once or twice a year, but mowing is not necessary. Reseed, fertilize, and mulch damaged areas immediately. 'Refer to Appendix 8.02 for botanical names. Practice Standards and SpeCifiMdOnN Seeding mixture Species Rate (lb /acre) German millet 40 In the Piedmont and Mountains, a small-stemmed Sudangrass may be substituted at a rate of 50 lb/acre. Seeding dates Mountains—May 15 -Aug. 15 Piedmont —May's -Aug. 15 Coastal Plain—Apr. 15 -Aug. 15 Soil amendments Follow recommendations of soil tests or apply 2,000 Iblacre ground agricultural limestone and 750 lb/acre 10-10-10 fertilizer. Mulch Apply 4,000 Iblacre straw. Anchor straw bytacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. F M11 Practice Standards and SpecificationN Seeding mixture Species, Rate (lb/acre) Blend of two turf-type tall fescues (90%) and two or more improved Kentucky bluegrass varieties (10%) 200-250 Best Possible Fall: Aug. 25 - Sept. 15 Aug. 20 - Oct. 25 Winter: — Feb. I - Mar. 31 For quality turf, avoid spring seeding. Where grading is completed during late winter or spring, an alternative is to seed 30 lb/acre Kobe lespedeza, keep mowed, prepare seedbed, and seed a permanent mixture in early fall. Soil amendments Apply lime and fertilizer according to soil tests, or apply 4,000 lb/acre ground agricultural limestone and 1,000 lb/acre 10-10-10 fertilizer. Mulch Apply 4,000 lb/acre small grain straw or equivalent cover of another suitable mulch. Anchor straw by tacking with asphalt, netting, roving, or by crimping with a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Fertilize according to soil tests or apply 40 lb/acre nitrogen in Jan. or Feb., 40 lb in Sept., and 40 lb in Nov., from a 12-4-8, 16-4-8, or similar turf fertilizer. Avoid fertilizer applications during warm weather, as this increases stand losses to disease. Mow to a height of 2.5-3.5 inches as needed. Reseed, fertilize, and mulch damaged areas immediately. 'Refer to Appendix 8.02 for botanical names. 151st 0 6.11.22 Seeding mixture Species Rate (lb/acre) Rye (grain) 120 Seeding dates Mountains—Aug. 15 - Dec. 15 Coastal Plain and Piedmont—Aug. 15 - Dec. 30 Soil amendments Follow soil tests or apply 2,000 lb/acre ground agricultural limestone and 1,000 Ib/acr8 10-10-10 fertilizer. Mulch Apply 4,000 lb/acre straw. Anchorstraw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Repair and refertilize damaged areas immediately. Topdress with 50 lb/acre of nitrogen in March. If it is necessary to extent temporary cover beyond June 15, overseed with 50 lb/acre Kobe (Piedmont and Coastal Plain) or Korean (Mountains) lespedeza in late February or early March. I Best Possible Fall: Aug. 25 - Sept. 15 Aug. 20 - Oct. 25 Winter: — Feb. I - Mar. 31 For quality turf, avoid spring seeding. Where grading is completed during late winter or spring, an alternative is to seed 30 lb/acre Kobe lespedeza, keep mowed, prepare seedbed, and seed permanent mixture between Aug. 25 and Sept. 15. Soil amendments Apply lime and fertilizer according to soil tests or apply 4,000 lb/acre ground agricultural limestone and 1,000 lb/acre 10-10-10 fertilizer. Mulch Apply 4,000 lb/acre grain straw or equivalent cover of another suitable mulch. Anchor straw by tacking with asphalt, roving, netting, or by crimping with a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Fertilize according to soil tests or apply 40 lb/acre nitrogen in Jan. or Feb., 40 lb in Sept., and 40 lb in Nov., from a 12-4-8, 16-4-8, or similar turf fertilizer. Avoid fertilizer applications during warm weather, as this increases stand losses to disease. Reseed, fertilize, and mulch damaged areas immediately. Mow to a height of 2.5-3.5 inches as needed. 'Refer to Appendix 8.02 for botanical names. MIM.71ZZ 1,1 it TEMPORARY AND PERMANENT SEEDING CHARTS CHARTS FROM NCDENR PRACTICE STANDARDS AND SPECIFICATIONS (REV 6/06) Seeding mixture Species' Rate (lb/acre) Tall fescue 100 Sericea lespedeza 30 Kobelespedeza 10 Seeding notes 1. In Eastern Piedmont, add 25 lb/acre Pensacola Bahiagrass or 10 lb/ acre common Bermudagrass. Use common Bermudagrass only where it is unlikely to become a pest. 2. After Aug. 15, use unscarified sericea seed. 3. Where a neat appearance is desired, omit sericea and substitute 40 lb/acre Bahiagrass or 15 lb/acre Bermudagrass. 4. To extend spring seeding dates into June, add 15 lb/acre hulled Bermudagrass. However, it is preferable to seed temporary cover and seed fescue in Sept. Nurse plants Between May I and Aug. 15, add 10 lb/acre German millet or 15 lb/ acre Sudangrass. Prior to May 1 or after Aug. 15, add 40 lb/acre rye (grain). 2= � Best Possible Fall: Aug. 25 - Sept. 15 Aug. 20 - Oct. 25 Late Winter: Feb. 15 - Mar. 21 Feb. 1 -Apr. 15 Fall is best for tall fescue, and lespedezas in late winter. Overseeding of Kobe lespedeza over fall-seeded tall fescue is very effective. Use unhulled Bermudagrass seed in fall. Soil amendments Apply lime and fertilizer according to soil tests or apply 4,000 lb/acre ground agricultural limestone and 1,000 lb/acre 10-10-10 fertilizer. Mulch Apply 4,000-5,000 Iblacre grain straw or equivalent cover of another suitable mulching material. Anchor mulch by tacking with asphalt, roving, or netting. Netting is the preferred anchoring method on steep slopes. Maintenance Refertilize in the second year unless growth is fully adequate. May be mowed once or twice a year, but mowing is not necessary. Reseed, fertilize, and mulch damaged areas immediately. Refer to Appendix 8.02 for botanical names. N,• , I'm, Seeding mixture Species' Rate (Iblacre) Tall fescue 200 (4-5 lb/1,000 ft2) Nurse plants Between May 1 and Aug. 15, add 15 lb/acre Sudangrass or 15 lb/acre German millet. Prior to May 1 or after Aug. 15, add 40 lb/acre rye (grain). Seeding dates Best: Aug. 25 - Oct. Possible: Feb. -Apr. 15 Avoid seeding from Nov. to Jan. If seeding must be done at this time, add 40 lb/acre rye grain and use a channel lining that offers maximum protection. Soil amendments Apply lime and fertilizer according to soil tests, or apply 4,000 lb/acre ground agricultural limestone and 1,000 Iblacre 10-10-10 fertilizer. Operate tillage equipment across the waterway. Mulch Use a rolled erosion control product to cover the bottom of channels and ditches, and staple securely. The lining should extend above the highest calculated depth of flow. On channel side slopes above this height, and in drainages not requiring temporary linings, apply 4,000 lb/acre grain straw, and anchor straw by stapling netting over the top. Mulch and anchoring materials must not be allowed to wash down slopes where they can clog drainage devices. Maintenance Inspect and repair mulch frequently. Refertilize in late winter of the following year; use soil tests or apply 150 Iblacre 10-10-10. Mow regularly to a height of 2-4 inches. 'Refer to Appendix 8.02 for botanical names. 10� Uj > 11-4 Uj V) z W Uj DC 0 U 0 D a Z 0 a = w LU E 0 C) CID N Q 04 0 CM LO (D C14 LO LO LU C-) I— r— 00 00 LU LU Z C1 C) 6 LU C) af 00 00 cc 0 13� Z 3: _j M 6 ca .T 53) 9 1.- LL .0 2� LL w Lu LU 0� < 0- w d 0 a- Z U) Z to Z Z 0 < LU LU N N U Lu < = U Z 00 r-j Z LL Q� r-1 in Lu 0 06 in Lu 0 1 6 Lu U) 3: LIU L'w w op L9 13� < rj _j 0'j 0 1­4 a- N in ON Z 11-4 U LU U) U F- 0 in co Lu Z C) U U > 10� Uj > 11-4 Uj V) z W Uj DC 0 U 0 D a Z 0 a = w PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION JDATE: NOVEMBER 23, 2011 REVISIONS: NO. DATE (PROJECT NO.: H9001.00 2D LU E 0 C) CID N Q 04 0 CM LO C14 LO LO LU C-) I— r— 00 00 C C1 (D -tt, Z C1 C) 6 LU C) af 00 00 cc 0 > 'T 0 M M < LL LU --- Z 3: _j M 6 ca .T 53) 9 1.- LL .0 2� LL w LU 0� < 0- w d 0 a- U) V) Z PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION JDATE: NOVEMBER 23, 2011 REVISIONS: NO. DATE (PROJECT NO.: H9001.00 2D LIST OF PIPES, ENDWALLS, ETC. (FOR PIPES 54" & UNDER) (D � w z p U) z ABBREVIATIONS Lu PRECAST ENDWALLS m w a - m ^ w o J o c^ z V Q= z O HDPE PER EACH H Z v a Q X C.B. CATCH BASIN U a O i= CLASS III R.C. PIPE BITUMINOUS COATED C.S. PIPE TYPE B FRAME, GRATES w x z 00 z STATION DOUBLE WALL u- c) J j (UNLESS NOTED OTHERWISE) (UNLESS NOTED OTHERWISE) z U AND HOOD V N.D.I. NARROW DROP INLET LL H T' '1' w U w SMOOTH INTERIOR a p �� N STANDARD 840.03 N L0 m v °� U-) 0_ Lu O O z w w J PIPE a a + o ti Lo D.I. DROP INLET � w �? J a Ocn PzQ o 0 0 0 c Y w, w w U w O j � co co G.D.I. GRATED DROP INLET Q N w p co co D > w > w O OV p Of o _°; o G.D.I. (N.S.) GRATED DROP INLET a N w J > z U -^ __ -^ H g P U) m H (NARROW SLOT) w z U w z - w N m Z� o LIN. FT. U) J w � H SIZE O D- w a0 12" 15" 18" 24" 30" 36" 42" 48" 12" 15" 18" 24" 30" 36" 42" 48" 12" 15" 18" 24" 30" 36" 42" 48" 54" J N J W J A B ly OV w m O J.B. JUNCTION BOX U U a c~n w ly cn C7 a D 0 C9 a 0 w _ 0 M.H. MANHOLE ®�� d�o� Ln 0 z p o - >O o w w w °a T.B.D.I. TRAFFIC BEARING DROP INLET I �� w THICKNESS a r r p �- p O m 00 co H "' ros �' Z T.B.J.B. TRAFFIC BEARING JUNCTION BOX U OR GAUGE O co CD (D (D rn rn rn rn o co co 0 o Z D a TYPE OF GRATE w p W ® II �� O p m CD cfl cD r- r- o o ao co co ao U p p 6 `�d � U > 0 0 0 0 0 0 � co o M CO a z H U � L � p ao w = a U) z Z - - O x p cn p o w ° o U E F G L) p p V Ov REMARKS M a ui r 95 +08 -WB- 1 161.90 1 161.10 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 44 1 1 1 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 DUAL HDPE 106 +35 -WB- 2 165.00 1 162.50 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 641 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 DUAL HDPE 1 TOTAL I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 1441641 1 1 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 LIST OF PARCELS IMPACTED Panel No. Owned Name Plansheet No. 1 BROWN, WILLIAM J JR 4 DB 2966, PG 0313 1722874774 Pending 15.670 2 BROWN, WILLIAM J JR 4,5 DB 13856, PG 2383 1722779064 NIA 32.666 4 BROWN, WILLIAM J JR 4,5 DB 2966, PG 0313 1722970983 Pending 3.553 3 BROWN, ROBERT H 4, 5, 6 DB 2966, PG 0315 1722985086 Pending 25.847 5 BROWN, WILLIAM J BROWN, ROBERT HOWARD 6 DB 167, PG E 1732071808 Pending 10.061 6 BROWN, WILLIAM J BROWN, ROBERT H 6,7 BM 1998, PG 1599 1732085040 NIA 9.659 7 BROWN, WILLIAM J BROWN, ROBERT HOWARD 7 DB 2966, PG 0313 1732184069 Pending 14.807 8 WALNUT RIDGE HOMEOWNERS ASSOC INC 8 DB 7488, PG 617 1732280344 Pending 3.349 9 BROWN, WILLIAM J JR BROWN, ROBERT H 8,9 DB 6742, PG 31 1732289450 Pending 18.958 10 WALNUT RIDGE HOMEOWNERS ASSOC INC 8 DB 7279, PG 745 1732284890 Pending 1.973 11 FIELDCROSS AT EAGLECHASE HOMEOWNERS ASSOCIATION INC 8 DB 4265, PG 677 1732299043 Pending 6.141 12 BENSON, C ALFRED BENSON, GLORIA J 9 DB 4651, PG 242 1732382859 Pending 0.449 13 TOWNES, ERIC L 9 DB 12325, PG 386 1732383881 Pending 0.990 14 RALEIGH CITY OF 9 DB 1988, PG 207 1732385548 NIA 3.170 15 VINEYARDS HOMEOWNERS ASSOCIATION 9 DB 7650, PG 881 1732395138 Pending 1.449 16 RALEIGH CITY OF 9,10 DB 4602, PG 273 1732480863 NIA 24.824 17 RIVERKNOLL HOMEOWNERS ASSOCIATION 10 DB 4602, PG 279 1732491328 Pending 3.696 18 RIVERKNOLL ASSOCIATES 10 DB 03492, PG 757 1732493368 Pending 3.040 19 H J MORRIS CONST INC 10 DB 6846, PG 1030 1732488459 NIA 11.340 20 MARTIN, CHARLES EUGENE & BARBARA P 10,11 DB 7200, PG 610 1732592042 Pending 15.561 21 JEFFREYS, A J III & CHRISTY D 11 DB 6178, PG 405 1732584766 Pending 17.401 22 ALMUS J JEFFREYS JR 11 DB 325, PG E 1732587444 Pending 15.866 23 AJ JEFFREYS JR 11 DB 1137, PG 0531 1732680665 Pending 30.042 24 WOODARD, LEAMON HEIRS 11,12 DB 13436, PG 820 1732780525 Pending 88.923 25 RB & ELAINE K HOPKINS 12,13 DB 2038, PG 311 1732787516 Pending 14.247 26 CITY OF RALEIGH 13 DB 2297, PG 255 1732779522 NIA 12.442 27 KAGAWA LLC 13,14 DB 11131, PG 752 1732877886 DB 14393, PG 1241 18.328 28 HAMM, CAROLYN W 6 DB 12060, PG 0877 1732088070 Pending 0.182 29 HUNTER, NICOLE 6 DB 10541, PG 2446 1732089042 Pending 0.199 30 GREEN, LORRAINE & EMILY 6 DB 12426, PG 1705 1732089088 Pending 0.197 31 BAZEMORE, JUNE 1 6 DB 07486, PG 0548 1732180097 Pending 0.212 32 JOHNSON, ELIZABETH ANN 6 DB 8356, PG 1512 1732182117 Pending 0.172 33 ANZORA, HECTOR & ELENA CLAUDIA 6 DB 11423, PG 201 1732182243 Pending 0.182 34 ELLEBY, CHRISTOPHER & ANNTIONETTE 6 DB 10593, PG 1053 1732182350 Pending 0.169 w J w �1 z W 0 W � DC U Q Z a J O a = � w z PRELIMINARY PLA S I D® NOT USE FOR CONSTRUCTI ON DATE: NOVEMBER 23, 2011 REVISIONS: NO. DATE PROJECT NO.: H9001.00 SCALE: NTS N Lu 0 N� LJ� N CO > F- F- H U CR CR � U Z �� U MM d0 Z , �J 01 m q U) LL 2 L u p w �c F- a a w a � ♦^ V J V) z a PRELIMINARY PLA S I D® NOT USE FOR CONSTRUCTI ON DATE: NOVEMBER 23, 2011 REVISIONS: NO. DATE PROJECT NO.: H9001.00 SCALE: NTS (= H UJI UJI v w i--i z Z U) z O J Q� kD g I..L U Q N N Q w = LL ��,�zm w LIST OF SIGNAGE ALONG TRAIL U) 3: 00 LU �e tY N � J p1 tY d N Ln m O Z H w U `) SUMMARY OF EARTHWORK Y U c� ®�� d� U O Ln IN CUBIC YARDS �� J co UNCLASSIFIED o �d `�$ O LOCATION EXCAVATION UNDERCUT EMBT+ /o BORROW WASTE w J > H Uj Z) w z W O �W 1..1� Q U Q O Z w J O �..0 z H 1 U 0 LJ� LU J Cfl U LO N CO U m H Zao,aso7t0 LLI °o =a°oa°o 3 MM d0 J 01 N Z mv � I— I - U-- w p w cG a oG V J a z a NEUSE ..�, NEUSE RIVER TRAIL TRAIL z3x,45A PRELIMINARY ARY ]�] ANS 'nse9 t DO NOT USE FOR CONSTRUCTION RESERVED Eff:ffftli- PARKING - bl-td G1PIl'ALAeEAG¢YHiWAY STOP ,,. NEUSE RIVER TRAIL NEUSE RIVER TRAIL "l- P-1 #### p C Gre en 'A oy n R1 -1 v 18"X 18" R7 -1 30" X 30" (VEHICULAR) 12" X 18" SIGN A SIGN B SIGN C SIGN D SIGN F SIGN I DATE: NOVEMBER 23, 2011 REVISIONS: xxxx SPEED NO. DATE Neuse River Trail LIMIT Hours of Operation: Dawn to Dusk W7 -5 R2 -1 is" x le" Hn -2L �'`'1 -5R 1 12" X 18" WI -2R WI -5L 18" X 18" 18" X 18" SIGN J SIGN K SIGN L SIGN M SIGN P PROJECT NO.: H9001.00 SCALE: NTS 3A TYPE OF SIGNS SIGNAGE SYMBOL A B C D E F G H I J K L M N P Q R S T U V W X H Q � p w Y G7 p Y g � z � w w � Q > Y C7 � w U ~ COMMENTS � STATION w � a o Q � U � z0 J J � Q z p d g � � H Q w Q p � _U Q w � w w � = w � > w w w � � � z � a U � U � 2 Q G7 z � � U 2 � O z w � a W B 11 +00 LT 8.5 1 WB 11 +00 RT 8.5 1 W7 -5 WB 12 +50 RT 8.5 1 WB 14 +20 LT 8.5 1 W7 -5 Wg 20 +25 RT 8.5 1 S NEW HOPE ROAD WB 22 +10 LT 8.5 1 S NEW HOPE ROAD WB 56 +60 RT /LT 8.5 2 W1 -2L WB 59 +80 RT /LT 8.5 2 W1 -2R WB 118 +80 RT 8.5 1 W7 -5 WB 125 +35 LT 8.5 1 W1 -2R WB 125 +35 RT 8.5 1 W1 -2R WB 127 +65 RT 8.5 1 BARWELL ROAD WB 128 +40 LT 8.5 1 BARWELL ROAD WB RT 8.5 1 W1 -2L WB LT 8.5 1 1 W1 -2L, W7 -5 (SAME POST) WB RT 8.5 1 WB 8.5 1 WB WB RT 8.5 Y1 Y1 RT Y1 8.5 MILE MARKERS TYPE E MILE LOCATIONS TO BE DIET. IN FIELD (/4 MILE INTERVALS) SPEED LIMIT TYPE P LOCATIONS TO BE DIET. IN FIELD /MILE INTERVALS TYPE H 2 TYPE H LOCATIONS TO BE DIET. IN FIELD SUBTOTAL SIGNAGE SYMBOL A B C D E F G H I J K L M N P Q R S T U V W X Note- This Drawing Correlates With 440 12 Of 44 Raleigh 44e444y5 Caster Sign Program. 414445 to match 444ig4 44e4440 4D444r4 Cap 4° x 4" x 1/4) Aluminum Sheet 4144 To Top Of FP�4 C I U U11 ���C1 II 4 Cite ❑❑ na4so 4D 4D 4ILCIIL Cap 4" x 4' x 1/4) 44minum Sheet Welded TO Top Of Tube Ground Clean Tube 499 x 499 x 4° x 1 Aluminum Tube 6063 D S Cite ❑D n.t.s. C44r Etevati44 r CAA 4' x 4' x �� ° 4�III II L Sheet 4144 To Top Of Tube Ground Clean Tube 499 x 499 x 2399 x 1/899 Square Atuminum Tube 6 ❑4 52 Compacted Fitt 499 x 499 x 1/899 4uminum Sheet 4144 TO Bottom Of Tube Ground Clean 1/4 x 4" Rebar Welded To Bottom 6 Mlle ❑❑ n.t.s. Concrete Carter 44Di44 SIGN TYPE E Miteage Markers 18// 1 399 4lvo SOxx Boardwalk Rail 2 x 4" PT Board 1/49 4a4 Bolts 5 x 3/4' Carriage Gall. Bolas Mile Marker Boardwalks 4 �5 0 N E U S E C 00 00 ° °0 0 0 O° 0 ° O ° J'4 44° 4444 a O �77 o o 00 00 0 0 0 O° 0 ° O ° 18 00 ° O °° ° 0 O° 4 O ° O o 00 00 ° 0° 0 0 ° 0 00 0 00 00 0 00 a ° O° 00 - 0 00 0 0° 0 0 0 0 - 0 0 00 a i ° 0 0 0 0 o ° 000 0 ° 00 � 12 NOTE, 44444 TYPICAL 44 4444 4444 �Ch4 Marker Section 12 n.t.s. w J w �1 z W 0 W � DC U Q Z a J O a = � w z a w z z g a Z w w O z w V) Y U O Ln Q w Z J O U > H C/' 0 U DC rn V C O w w � H ") U � � � U '—' >< � Ur MM d0 Z ' � L J - O m vLL z c~n 0 w �c a 0 w � a V J V) z � U � 2 N U 00 a ri Z Ln O � LU w�C7o w LU OP C)e d N J 01 N (n ON U w J w �1 z W 0 W � DC U Q Z a J O a = � w z a w z z g a Z w w O z w V) Y U O Ln Q w Z J O U > PRELIMINARY PLANS I D® NOT USE FOR CONSTRUCTI ®N DATE: NOVEMBE R 23, 2011 REVISIONS: 1 NO. I DATE 1 (PROJECT NO.: H9001.00 t NTS C/' 0 U DC J Cfl N C O � H ") U � � � U Z w Cs MM1 >< � Ur MM d0 Z ' � L J - O m vLL m w 0 w �c a w � a V J V) z a PRELIMINARY PLANS I D® NOT USE FOR CONSTRUCTI ®N DATE: NOVEMBE R 23, 2011 REVISIONS: 1 NO. I DATE 1 (PROJECT NO.: H9001.00 t NTS NOTE: SIGN SHALL BE 18" X 18" FOR TRAIL APPLICATIONS. MOUNT SIGN TO POST TO NCDOT SPECS. ALL HARDWARE TO BE GALVANIZED AND FILED TO PREVENT THEFT /REMOVAL ST MOUNT SIGN TO POST TO NCDOT SPECS. ALL HARDWARE TO BE GALVANIZED AND FILED TO PREVENT THEFT /REMOVAL 4 "x 4" POST 4 "x 4" POST - ASPHALT TRAIL/ GREENWAY ASPHALT TRAIL/ GREENWAY 3' -6" 2„ 2500 PSI CONC. FOOTING, (TYP.) #57 WASHED STONE, (TYP.) COMPACTED SUBGRADE DESIGNATED AS© ON PLANS 2500 PSI CONC. FOOTING, (TYP.) T -6" 0 in 2" 2" s` \ \ #57 WASHED STONE, (TYP.) COMPACTED SUBGRADE 1' -0" m r 1 GREENWAY STOP SIGN INSTALLATION 3 GREENWAY TYPICAL SIGN INSTALLATION 3 3 NOTE: SEE PLANS FOR SIGN TYPE AND SIZE. PROVIDE WIDENING TO THE INSIDE OF THE FOLLOWING CURVES 2" SOLID YELLOW LANE LINE ALIGNMENT CURVE BEGIN STA END STA LENGTH C O r= v Lu H co C Lu Lu z Z W o =c)m w d0 Z LL J O) m q U) H LL 2sZy 2 5 LL w 1--i CURVE WIDENING DETAIL NOTE: SEE SIGNAGE PLAN SHEETS FOR PLACEMENT WHEN CONDITION EXISTS AT INTERSECTIONS AND BOARDWALK NOTE: TRAIL HEAD SIGNS ASSOCIATED WITH VEHICULAR TRAFFIC AND SIGNS ALONG ROADWAYS SHALL MEET NCDOT AND MUTCD SIGN REQUIREMENTS, AND BE INSTALLED PER NCDOT STANDARD DRAWING 940.50 w J w �1 z W 0 W � DC U Q Z a J O a = � w z H N 0 U LJ� J co N C O r= v Lu H co C Lu Lu z Z W o =c)m w d0 Z LL J O) m q U) H LL 2sZy 2 5 LL w 1--i a Lu w a z III Z U) z z J O a g Q� kD cj� N a U w Q = zLn ^ LL a ,1 w O Y 3 w D w op C� a < d N J O N (n ON Z H U W `) Y U U O Ln w ® I Z O U > w J w �1 z W 0 W � DC U Q Z a J O a = � w z PRELIMINARY PLANS I D® NOT USE FOR CONSTRUCTI ®N DATE: NOVEMBER 23, 2011 REVISIONS: 1 NO. I DATE 1 IPROJECT NO.: H9001.00 3C NTS N 0 U LJ� J co N C O Lu H co C U z Z W o =c)m MM d0 Z LL J O) m q U) H LL 2sZy 2 5 LL w W a Lu w a ♦^ V) z a PRELIMINARY PLANS I D® NOT USE FOR CONSTRUCTI ®N DATE: NOVEMBER 23, 2011 REVISIONS: 1 NO. I DATE 1 IPROJECT NO.: H9001.00 3C NTS Note- This Drawing Correlates With Page N Of The Raleigh CNenways Masan Nigh Program, Finishes to match Raleigh Greenway Standards 1 CCU 3 noNs. �e Thfough—Bott Perit r 44 4 Graphic Panel 0 as Panel are 1R 0 0 12 if 0 0 Graphic Vaal 17 1;' 1 (0- C to C 11 1; 10 i t o to C NNar Plate I 9 Steel, Noway 6ouated Standard Coax 4 apaa Panel, Backer Plate 4 n,t.s. SIGN TYPE H INTERPEaTaN CC 1E) cl I 2 a 3 n.t.<o 1/4-20 Securi Through Bolt Graphic Panel 1/2 Backer 17 1/2" x 11 SNet Ntaa9 Powder Standard Cotor Weld Continuous Post V" x 2" SNE Powder Coated Standard Color SNexe No 5 aapaa 4 naNs. as Panel Elevation 2" e Peet `olor itt Note: City Of Raleigh To Supply Design Only. Contractor For Production, Mounting, Tub e Graphic Nosh, (4)) Steel 4t Powder Standar Con( aaffa Responsible and Erection. 3 CCU �IG naNs. Natal Details as Panel action )Nova Grade m W a a LU a V) z a LU J LU �1 z W 0 W � DC U Q Z a J O a = � w z LU z z g a Z W W O z LU V) Y U O Ln Q w Z J O U > F- C/' 0 DC i N") C'4 C O H U .0 � � Z U >< ---t Ur MM d0 Z LU [ LL J 01 ' M f/1 H LL 5 LL w n t/)U) PJ >OE LIMINA Y PLANS I ® NOT USE FOR CONSTRUCTI ®N DATE: NOVEMBER 23, 2011 REVISIONS: 1 NO. I DATE 1 (PROJECT NO.: H9001.00 3D NTS H C7 w LU '—' w z o Q < LU oC � U 2 N U 00 LL � ,--i Z T O 0-6 U') LU 2 3:wLU C)e d N J 01 N (n ON U m W a a LU a V) z a LU J LU �1 z W 0 W � DC U Q Z a J O a = � w z LU z z g a Z W W O z LU V) Y U O Ln Q w Z J O U > F- C/' 0 DC i N") C'4 C O H U .0 � � Z U >< ---t Ur MM d0 Z LU [ LL J 01 ' M f/1 H LL 5 LL w n t/)U) PJ >OE LIMINA Y PLANS I ® NOT USE FOR CONSTRUCTI ®N DATE: NOVEMBER 23, 2011 REVISIONS: 1 NO. I DATE 1 (PROJECT NO.: H9001.00 3D NTS Note- Finishes to match Raleigh Green\y Standards. WHERE SIGN IS INSTALLED AT BOARDWALK, BOTTOM E]L]EVATION OF SI GN SHALL EQUAL TOP RAIL ]ELEVATION 2 1/2 )9 Aluminum Pipe 606 T529 Capped & Ground Clean 1/49, Aluminum Sheet 3033 149 Welded To ]pipe See 3K rl--,Regutatory Sign Plan 1/4" Aluminum Sheet 3033 H 149 AtCe4 T o ��P� 2 1/2" Ali Capped a] Regulatory Sign Elevation 0,25 1'3 49 SIGN TYPE K 2.5" x 93" Aluminum Tube, Capped Ground SPECIAL SIGNS pI":' --) in ---- - - - 1/4" Aluminum Sheet 3 Welded To x Tube/ i i I , p Regulatory Sign Sectiq / 1/499 Aluminum Sheet 3033 H 14, At4e4 CC CIpC \ 2 1/2 DAturninum Pipe, 606 `0029 Capped Ground & Clean r3--,Regulatory Sign Elevation 49 I i 1/4)" Aluminum Sheet 3033 H 149 At4eC To Pipe -\ xxxx 4 ., •■ 2 1/p99 Aluminum Pipe96063 T52, Capped & Ground Clean Painted standard Color 49 Concrete Compacted Fitt 28 24 r-4-,Regutatory Sign Section 10\0 O o� 00 O O 0 O C 0 C 00 00 O0 O O °O 0 0 O O � D 00 00 00 00 O � D O 00 00 pro ODp O O O O O O oo\ oo 4 O V 12" m 0 w a a w a V) z a w J w �1 z W 0 W � DC U Q Z a J O a = � w z w z z g a Z w w O z w V) Y U O Ln Q w Z J O U > C/' 0 DC i N") C'4 C O H U .0 � � Z U >< -- -t =a M M d 0 3 �Ur MM Z LL !z: -j 01 N 2 2sZ f/1 H LL 5 LL w tnU) PRELIMINARY PLAN I D® NOT USE FOR C®NSTRUCPI ®N DATE: NOVEMBER 23, 2011 REVISIONS: 1 NO. I DATE 1 (PROJECT NO.: H9001.00 3E NTS H C7 w w '—' J z 0 En r- o < LU kD oC � U 2 N U 00 LL ri Z Ln 0 06 Uw ID O 2 C7 0 Y w o0 < d N D J 1 r N (n ON U m 0 w a a w a V) z a w J w �1 z W 0 W � DC U Q Z a J O a = � w z w z z g a Z w w O z w V) Y U O Ln Q w Z J O U > C/' 0 DC i N") C'4 C O H U .0 � � Z U >< -- -t =a M M d 0 3 �Ur MM Z LL !z: -j 01 N 2 2sZ f/1 H LL 5 LL w tnU) PRELIMINARY PLAN I D® NOT USE FOR C®NSTRUCPI ®N DATE: NOVEMBER 23, 2011 REVISIONS: 1 NO. I DATE 1 (PROJECT NO.: H9001.00 3E NTS t 3'tW R �NtTq y TYPE K SIGN TYPICAL ��J /V 'jj "5�� �U "- ?Gt �� j As N� BROWNALLIAM J JR l Q5.2�I E s BEGIN BOARDW K 2 FOR SEEOSBRDHEET SERIES I DETAILS, ���N PIN g 227 9064 3 BOTH LOCATIONS _W� STOAA20+V65 00 1 r ~END CON,CRET TRAIL BEGIN CONCRETE T IL t 1 BEGI 190 BEGIIS STA. 1 .1 170 160 150 ne w J w �1 z W 0 W � DC U Q Z a J O a = � w z a w z z g a Z W W i� _O Z W U) Y U O Ln Q w Z J U O > H c/' 0 U DC rn V C O w w Lu H U � � � U H Cc � MM d0 Z LL J O) DD q U) H LL Z cn W a o Q < LU V) kD oC � w 2 N U 00 00 LL �HT'z'n O Ln w L 2 C7 o �j W � L Op Q! d N J 0-i N (n ON H U ne w J w �1 z W 0 W � DC U Q Z a J O a = � w z a w z z g a Z W W i� _O Z W U) Y U O Ln Q w Z J U O > /-1 ! _ lQ T / J.VV NEW HOPE ROAD BRIDGE 190 PRELIMINARY PLANS GRADE EL — 175.2 — D® NOT USE FOR CONSTRUCTI ®N 9 Pl - 2/ 90.00 + 20.00 = EL 172.24 .176.82 _ , VC - 45 180 10.9 _ _ /.00 ooi o r �o.oaoo� r + �o ooDOi r �r.o 000� ( _ r 5 D 0 0 r + �o.0000 o r + )oe0000 0 DATE. NOVEMBER 23 2011 f )2 0 D 0 r e e )0.40000 / . .00 r REVISIONS: 170 NO. DATE Pr 20 f 85.00 = — Pl 23+75.00 - + Pl 23 /0.00 Pl l9 OO.oD = _ , f Pl l9 65.D0 _ = EL 172.66 _ EL ........175.29 /7 - EL 174.64......... EL .5.29 _ _ EL 174.64 VC 30 .....16.0 PROJECT NO.: END BOARDWALK 1 BEGIN BOARDWALK 2 - W B- STA. 2 0 + 65.00 _ WB- STA. 21 +15.00 H9001 .00 SCALE: 150 15 +00 16 +00 17 +00 18 +00 19 +00 20 +00 21 +00 22 +00 23 +00 24 +00 25 +00 26 +00 27 +00 4 c/' 0 U DC J co N C O Lu H U � � � U Z W o =0°00M0 Cc MM d0 Z LL J O) DD q U) H LL 2sZy 2 5 LL w W a Lu w 0G a ♦^ V) z a /-1 ! _ lQ T / J.VV NEW HOPE ROAD BRIDGE 190 PRELIMINARY PLANS GRADE EL — 175.2 — D® NOT USE FOR CONSTRUCTI ®N 9 Pl - 2/ 90.00 + 20.00 = EL 172.24 .176.82 _ , VC - 45 180 10.9 _ _ /.00 ooi o r �o.oaoo� r + �o ooDOi r �r.o 000� ( _ r 5 D 0 0 r + �o.0000 o r + )oe0000 0 DATE. NOVEMBER 23 2011 f )2 0 D 0 r e e )0.40000 / . .00 r REVISIONS: 170 NO. DATE Pr 20 f 85.00 = — Pl 23+75.00 - + Pl 23 /0.00 Pl l9 OO.oD = _ , f Pl l9 65.D0 _ = EL 172.66 _ EL ........175.29 /7 - EL 174.64......... EL .5.29 _ _ EL 174.64 VC 30 .....16.0 PROJECT NO.: END BOARDWALK 1 BEGIN BOARDWALK 2 - W B- STA. 2 0 + 65.00 _ WB- STA. 21 +15.00 H9001 .00 SCALE: 150 15 +00 16 +00 17 +00 18 +00 19 +00 20 +00 21 +00 22 +00 23 +00 24 +00 25 +00 26 +00 27 +00 4 FOR BOARDWALK DETAILS, SEE SB SHEET SERIES WILLIAM J. BROWN DESIGNATED AS CITY OF Ila .._. ROBERT H. BROWN RALEIGH GREENWAY PER �� - -- DB 00167, PG 000E BY 1998, PG 1599 PIN 1732071808 PIN 1732085040 e ze = f .00 190 P1 38 80 190 EL 175.49 Pl 38 60.00 EL = 175.29 180 180 o 1 T T r 1 )o.a000 (1 )o.0000i o r 170 _ _ -_- � 170 150 Mulff WWI( a '"IIell] CcfiaiIll 01=1I11 o ►. ilol 0XIM8111 olmilll 016=I1111 of'�illl 01=il11 ollmilll [c�ailel 160 150 140 QiaiIll ne w J w �1 z W 0 W � DC U Q Z a J O a = � w z o! W z z g a Z W W i� _O Z W U) Y U O Ln Q w Z J U O > H c/' 0 DC C7 CO W W i P- H U CR CR � U Z �� U MM Lu d0 Z LL 5 J O) m q U) H LL Z cn W a o Q < LU V) kD oC � w 2 N U 00 a O L w 2 1 0 �j W Lu Lu op Q! d N J 01 N (n ON H U ne w J w �1 z W 0 W � DC U Q Z a J O a = � w z o! W z z g a Z W W i� _O Z W U) Y U O Ln Q w Z J U O > PRELIMINARY PLANS D® NOT USE FOR CONSTRUCTI ®N I DATE: NOVEMBER 23, 2011 REVISIONS: NO. I DATE PROJECT NO.: H9001.00 5 c/' 0 DC N C'4 CO i P- H U CR CR � U Z �� U MM Lu d0 Z LL 5 J O) m q U) H LL 2sZy 5 LL w W a Lu w a ♦^ V) z a PRELIMINARY PLANS D® NOT USE FOR CONSTRUCTI ®N I DATE: NOVEMBER 23, 2011 REVISIONS: NO. I DATE PROJECT NO.: H9001.00 5 FOR BOARDWALK DETAILS, SEE SB SHEET SERIES c co V Q L A s �\ y PUE -c— PUE � 'N DETAIL 1 CUT DITCH O (Not to Scale) � Front a Ditch Natural 3'� e< Slope Ground `?') D d $ Min. D= 1 Ft. Type of Liner= PSRM Max. d= 1 Ft. FROM STA. 52 +50 TO STA. 53 +45 -WBRI- Ind s� = FN— w C U 1..1. J to N > L,:)) � H U a �o,a,-C(j (D Za� LU6af0°oa0o 3 MM Q w — 0) rn LL d0 N Z w !z: J 0) O) C14 Z) g m q U) H LL i--i w w z Z0 cn V � �) V) z z C,12 D! N Q U = U 00 0 06 Y w � w C7 0 oo � U < as N N D L w QJ a m 0 O z I--I U w `) Y U U Ln Ln J co O U > LU b 4 t 500' ff k � 0 � I WETLAND � •� WF14 , 2.... .w .... f _ C� ' CO " iFETE � 2 1 }4 LU y r 3 /R� \ r © _.._..._.._W /BOLLARDS LAB ` A N�4 4� 7� — B 9IN /BOAR WA�, Z _.._ L G' 111 "41 = �NBR1�" STA. 3 + 72:00 10 t, - "`� :X END BOARDWALK 2 ``` 1 \ O f 1`ti, O �/ w -° X fO O –WBRI– STA. 46 +47.50., 1 \ WTLAND 1 W 30 2 w,. / O � r � a 1 r 1 � � W L.L i -,� 4 y STREAM SF8 f C� I 28 ,r , , � � a W 2 4 0 4 � ', r a 1 a U Q r 1 �` 4 La r -. -. } : _ xa r ss L � \ " J r n e � 1 ', � r ,, t t O � � � � ,� ' a E a r ., 1 ♦ i t a' s ss r �,: 6 `l t r F Of Uj � PUE �, 6 ti,. �, �, - EST 1 �Tt�N CLASS -;B ItIP `RAP 4 r: t W w 08 f r , � EST 2 SY FILTE �ABR,IC a ' . " ,. . _. Pti 6 L X 3 W X .- `VELOCITY DISSIPA�OR PAD P 4 t E 1 1 7 I 3 O Q _ 8 I J .m I t,r• ... 1 + Q P — , -- E u ..... ". G fiGE .... ..... 10 CONCRETE _. P M r- ARC7Ai........SL,4B gip,} , ....... __ ....~�- r ,, _- ,- ', l , W /BOLLARDS �.. Ln Fw s r t. W 4 I J' 6^ 7 STREAM SF10A _.._. NIF WILLIAM J. BROWN, f r °` WLLLIAM J. BROWN, JR. & ROBERT H. P ; r` ttr , JR. & ROBERT H. BROWN BROWN DESIGNATED AS CITY OF DB 2966, PG 3/3 RALEIGH GREENWAY PER f , r - BY 1996, PG 803 BY 1998, PG 1599 r r' - ' ' ~ -- PIN 1732184069 PIN 1732085040 � •1 :1 170 ' EL = 17 � •1 150 0 / 140 40 +00 41 +00 42 +00 43 +00 44 +00 45 +00 Q: asill � '. \ ', t' ,r APPRO CH SLAB IM f– ti, 1 W /,,$..... S i , 1 WE�LAN D', WF13' t t t y. t^Y" 7 / ` N/F —W BRI — CURVE DATA l l WILLIAM J BROWN, �a , `` ,, JR. & ROBERT H. _ —.... PI STA. 48 +19.70 P1 STA. 49+93.14 PI STA. 52 +94.69 — BROWN 0 = 61° 54' 3/.5" (RT) 0 = 58° 4I' 34.9" (RT) A = 39° 32' 01.8" (LT) DB 2966, PG v31 . " ' BM 1996,PG 803 STREAM SF9 D = 57° lT 44.8" D = 57° lT 44.8" D 28 38 52.4 L = 108.05' L = 102.44' L — 138.00 PIN 1732184069 T = 59.98' T = 56.22' T = 71.87' R = 100.00' R = 100.00' R = 200.00' 48 +00 49 +00 50 +00 51 +00 52 +00 EmmiIf] "" °"" PI = 48 +50.00 2.29' EL = 178.29' '5' VC = 60' ( +)4 I-- ---- EL VC = Malff Pl = 49+90.00 P1 = 51+70.00 190 Pl = 52 +50.00 EL = 180.74' EL = 174.62' EL = 17438' i in —WBRI— STA. 53 + 72. EL = 173.34' 54 +00 O 180 PRELIMINARY ARY P] ANS D® NOT USE FOR CONSTRUCTI ®N °�`Uv0 — )0.3000% 170 END 52 +00 .QO DATE: NOVEMBER 23, 2011 REVISIONS: 170 NO. DATE 160 PROJECT NO.: H9001.00 150 SCALE: 53 +00 6 FN— N C U 1..1. J to N > L,:)) � H U a �o,a,-C(j .1 m Za� LU6af0°oa0o 3 MM Q w — 0) rn LL d0 N Z !z: J 0) O) C14 Z) g m q U) H LL 2sZ 5 LL w w F- LU � oG a V � �) V) z 180 PRELIMINARY ARY P] ANS D® NOT USE FOR CONSTRUCTI ®N °�`Uv0 — )0.3000% 170 END 52 +00 .QO DATE: NOVEMBER 23, 2011 REVISIONS: 170 NO. DATE 160 PROJECT NO.: H9001.00 150 SCALE: 53 +00 6 •1 .1 170 •1 150 I�1 -f- 0�9 h - k, F...m `...... r`6 BY 1996..PG '1541 PIN 1732284890 WALNUT RIDGE P HOMEOWNERS ASSOCIATION, INC. �~ DB 7488, PG 6/7 $ ..x _..w BM 1997, PG 449 1 _..w ...x._...x._...x._.P /N 1732280344 Fw..._..._ h� j, 19 IAJ _ N/F r , WILLIAM J. BROWN, JR. & ROBERT H• BROWN f< DB 6742, PG 31 BY 1987, PG 960 PIN 1732289450 " "wwe H 0 U LJ� J Cfl N C O rn i H 1 � OZ � w LU -WB - CURVE DATA C5 co cc I--I d0 N z �J 01 2 0 LU z cn P1 STA. 53 +6/.27 P1 STA. 58 +34.68 P1 STA. 60 +0738 P1 STA. 62 +46.25 P1 STA. 64 +09.79 Cn 0 = 14° 16' 37.1" (LT) 0 = 84° 02' 55.3" (LT) A = 63° 51' 07.3° (RT) 0 = 28° 26' 38.1" (RT) A = 17° 53' 29.8" (RT ) oC D = 38° 11'49.9" D = 67° 24' 24.5" D = 28° 38' 52.4" D = 28° 38' 52.4" D = 38° //" 49.9" -- - . L = 37.38' L = 124.69' L = 222.89' L = 99.29' L = 46.84' T = 18.79' T = 76.60' T = 124.62' T = 50.69' T = 23.61' R = 150.00' R = 85.00' R = 200.00' R = 200.00' R = 150.00' " "wwe 190 s : Hill 0 ne w J w �1 z W 0 W � DC U Q Z a J O a = � w z a w z z g a Z w w i� _O Z w V) Y U O Q w Z J U O > H 0 U LJ� J Cfl N C O rn i H 1 � OZ � w LU C5 co cc I--I d0 N z �J 01 2 0 LU z cn a w � a Cn o Q oC � w ce 2 N U 00 O U-) w w 2 C7 o Lu 00 d N ~ J N (n m I� U 190 s : Hill 0 ne w J w �1 z W 0 W � DC U Q Z a J O a = � w z a w z z g a Z w w i� _O Z w V) Y U O Q w Z J U O > Pl 53 13.00 _ + /7 Pl 60 20.00 EL 2.26 - P/ _ + EL 17/.23 EL = !70.47 63 50.00 VC 100 EL 168.73" VC 50 . 00 _ 0 o + ..........6000/ (+)0.6 r� VC 120 18 0 t JO 4 .7 e o 0 s _ 0 NARY PLANS 4 0 � 5 VC 00 D® N ®'P" USQ•, FOR CONSTRUCTION o 0 100- o 9�. ) - o 2. 4 0 +)2 0/ )0.854 - ( 0 (+)200007- 5/ 0 . o f . I a Pl 58 ©o.00 +) _ r _ _� 170 P/ 56 50.00......... 1 _ � _. 0 -_ + 00 .7 0 l 10 .7 f . 60 4 0 _ /q� fA30 EL 180.95 0 t _ EL 180.05......... r . �2. 00/ X100 + 2.00 53 +00 54 +00 55 +00 56 +00 57 +00 58 +00 i i - Ui ',, -rv.0 EL = 173.35 VC = 60' C•smil1 :iIll] DATE: NOVEMBER 23, 2011 160 REVISIONS: NO. DATE 150 PROJECT NO.: H9001.00 140 66 +00 1 7 N 0 U LJ� J Cfl N C O i H 1 � OZ � 7 U C5 co cc MM Fu M IM d0 N z �J 01 2 0 w �G a w � a Cn V) z Pl 53 13.00 _ + /7 Pl 60 20.00 EL 2.26 - P/ _ + EL 17/.23 EL = !70.47 63 50.00 VC 100 EL 168.73" VC 50 . 00 _ 0 o + ..........6000/ (+)0.6 r� VC 120 18 0 t JO 4 .7 e o 0 s _ 0 NARY PLANS 4 0 � 5 VC 00 D® N ®'P" USQ•, FOR CONSTRUCTION o 0 100- o 9�. ) - o 2. 4 0 +)2 0/ )0.854 - ( 0 (+)200007- 5/ 0 . o f . I a Pl 58 ©o.00 +) _ r _ _� 170 P/ 56 50.00......... 1 _ � _. 0 -_ + 00 .7 0 l 10 .7 f . 60 4 0 _ /q� fA30 EL 180.95 0 t _ EL 180.05......... r . �2. 00/ X100 + 2.00 53 +00 54 +00 55 +00 56 +00 57 +00 58 +00 i i - Ui ',, -rv.0 EL = 173.35 VC = 60' C•smil1 :iIll] DATE: NOVEMBER 23, 2011 160 REVISIONS: NO. DATE 150 PROJECT NO.: H9001.00 140 66 +00 1 7 -WBR2- 0 = CURVE DATA D = 38° 11' 49.9" P1 STA. 70+55.2,3 P1 STA. 72 +28.21 P1 STA. 73 +63.03 A = 67° 19' 58.0" (LT) 0 = 29° 40' 08.4" (LT) 0 = 9° 36' 42.5" (RT ) D = 57° 17'44.8" D = 14° 19' 26.2" D = 14° 19-26.2" L = 117.52' L = 207.13' L = 67.10' T = 66.61' T = 105.94' T = 33.63' R = 100.00' R = 400.00' R = 400.00' V) g J QLU k -WBRI - CURVE DATA a P1 STA. 77 +02.01 0 = 59° 49' 25.7" (RT) D = 38° 11' 49.9" L = 156.62' T = 86.30' R = 150.00' DETAIL 1 ( Not to Scale) Front o Ditch Natural 5' ,del Slope Ground `.7 d Min. D = 1 Ft. Type of Liner= PSRM Max. d= 1 Ft. -WB- CURVE DATA P1 STA. 67 +18.11 0 = 42° 35' 43.1" (RT ) D = 38° I1' 49.9" L = ///.5/' T = 58.48' R = 150.00' x N r ; .S� F r f Sr SF7 f r r rj r r r r `/ r r � _ r l ....... -.f "I r• J. I'll I I •1 :1 170 •1 150 vI 9,,E Uj O ti O 1 �( 1 ti l • Q) BY 1988, Pc 207 FOR BOARDWALK DETAILS, EXISTING CP &L TRANSIVISSICN PIN 1732385548 SEE SB SHEET SERIES t /Ate �RCFkdFAIT N • / / — EL = VC .44' ( +)0 / — / T 1 . L = 167, = 7n �( +)/ 3% v ;/.,4 +)0.3300z. / = 76 L = /7 140 66 +00 67 +00 68 +00 69 +00 70 +00 71 +00 72 +00 73 +00 74 +00 75 +00 76 +00 190 BEGIN BOARDWALK 3 WBR2- STA. 77+90.00 (+)0.3300;/, w J w �1 z W 0 W � DC U Q Z a J O a = � w z = w C/' 0 0 D DC N a C� i N U Z - w T0 m c d0 Z LLJ O) , 2 w '—' W z z U) ♦^ V) g J QLU k a Q U Q N ^ w LL ���z� = w 06 O SD Y� w � w 0 L9 < as N N L QJ m I m Z i--i U w `) Y U o CO z o U > r r rj r r r r `/ r r � _ r l ....... -.f "I r• J. I'll I I •1 :1 170 •1 150 vI 9,,E Uj O ti O 1 �( 1 ti l • Q) BY 1988, Pc 207 FOR BOARDWALK DETAILS, EXISTING CP &L TRANSIVISSICN PIN 1732385548 SEE SB SHEET SERIES t /Ate �RCFkdFAIT N • / / — EL = VC .44' ( +)0 / — / T 1 . L = 167, = 7n �( +)/ 3% v ;/.,4 +)0.3300z. / = 76 L = /7 140 66 +00 67 +00 68 +00 69 +00 70 +00 71 +00 72 +00 73 +00 74 +00 75 +00 76 +00 190 BEGIN BOARDWALK 3 WBR2- STA. 77+90.00 (+)0.3300;/, w J w �1 z W 0 W � DC U Q Z a J O a = � w z - - - - - - • - • - - - - 180 PRELIMINARY PLANS D® NOT USE FOR CONSTRUCTI ®N 170 DATE: NOVEMBER 23, 2011 REVISIONS: P1 = 77+40.00 160 NO. DATE EL = 170.67' VC = 80' 150 PROJECT NO.: H9001.00 140 SCALE: 77 +00 78 +00 79 +00 1 8 C/' 0 0 D DC N CO i N U Z - T0 m c d0 Z LLJ O) , 2 w W a LU ♦ ♦^ V) z a 180 PRELIMINARY PLANS D® NOT USE FOR CONSTRUCTI ®N 170 DATE: NOVEMBER 23, 2011 REVISIONS: P1 = 77+40.00 160 NO. DATE EL = 170.67' VC = 80' 150 PROJECT NO.: H9001.00 140 SCALE: 77 +00 78 +00 79 +00 1 8 iC U) kD c 10' CONCRETE APPROACH SLAB W/BOLLARDS 17 NIF RiVERKNOLL HOMEOWNERS ASSOCIATION R8 4602, FG 279 6FIN 1732491328 00 ky• rc)\ Q_ 1�1 -me E _F_ -F- r 5?". '7- M )k b FOR BOARDWALK DETAILS, SEE SB SHEET SERIES FW..................................................................................... —11--" F, 90 StO. 0 . . .... . . . ..... . . .... P M. .... . . .... . . .... M.... . . ..... . ..... . . .... e END BOARDWALK 4 1-WBR1- STA. 84+96.32 LB 4.4- -WBR2- STA. 81 + 80.00 M -WB- STA. 83 + 50.00 LA M 00 —elm— WETLAND RW9B C %Jo 90+1610 Li PC A un 16 x PGE PGE elm — -F- NIF OF RALEIGH D8\ 4602, PG 273 Ln '1989, PG /J/J BM,5 X=F_ NIF FIC-4732480863 PG PG PGE H.J. MORRIS CONSTRUCTION, rn INC. rn 19 DEDICATED FOR elm— GREENWAY 4, ^. 20 DB 6846, FG 814 WETLAND RW9A . ..... < BY 1996, FG 1030 A//F 170 150 130 79+00 �00118=81( —WBR2 — CURVE DATA —WB— CURVE DATA P/ STA. 82+30.36 P1 STA. 83 +72.87 P1 STA. 87+08.16 P1 STA. 89 +36.55 P1 STA. 9/ +66.00 A = 19* 41" 45.6" (RT) A = 32° 36' 16.1" (LT) A = 30* 28" /0.1" (RT) A = 54* 35" 03.7" (RT) A = 83* 3/" 34.9" (LT) N z D = 38* 11`49.9" D = 14* 19'26.2" D = 14* 19'26.2" D = 57* 17" 44.8" D = 57* 17" 44.8" STREAM SF5 L = 51.56" L = 227.62" L = 212.72' L = 95.27" L = 145.78 ....... . .... T = 26.04' T = 116.99' T = 108.94" T = 51.60' T = 89.29 ti .... ... ..... R = 150.00" R = 400.00" R = 400.00" R = 100.00' R = 100.00 N" 7 82+00 83+00 84+00 85+00 [:]moft 166�11111 F5 I 1:610IM11111 103=8111 101010IM11111 P1 = 89+15.0 EL = 164.48' i/t, = can., FOORGIM11111 16J 011=1111 P/ 91+10.00 EL 164.45" i1r = qn,, 4, 0j"M11% .)uuu/. (—)l.l96j7 M F- N Lu C) C E 0 (D CO W W > C-4 Lc"" H .0 F- F- ca Z Lu c)) af So w, cb Cb ><-Tomm2oz LL [u- 0) CD u' ' — 5 .. J! 0) cy) co C14 LL Z 0 U) 0 00 F_ Lu < Lu LU V) kD N C) vl < ky• rc)\ Q_ 1�1 -me E _F_ -F- r 5?". '7- M )k b FOR BOARDWALK DETAILS, SEE SB SHEET SERIES FW..................................................................................... —11--" F, 90 StO. 0 . . .... . . . ..... . . .... P M. .... . . .... . . .... M.... . . ..... . ..... . . .... e END BOARDWALK 4 1-WBR1- STA. 84+96.32 LB 4.4- -WBR2- STA. 81 + 80.00 M -WB- STA. 83 + 50.00 LA M 00 —elm— WETLAND RW9B C %Jo 90+1610 Li PC A un 16 x PGE PGE elm — -F- NIF OF RALEIGH D8\ 4602, PG 273 Ln '1989, PG /J/J BM,5 X=F_ NIF FIC-4732480863 PG PG PGE H.J. MORRIS CONSTRUCTION, rn INC. rn 19 DEDICATED FOR elm— GREENWAY 4, ^. 20 DB 6846, FG 814 WETLAND RW9A . ..... < BY 1996, FG 1030 A//F 170 150 130 79+00 �00118=81( —WBR2 — CURVE DATA —WB— CURVE DATA P/ STA. 82+30.36 P1 STA. 83 +72.87 P1 STA. 87+08.16 P1 STA. 89 +36.55 P1 STA. 9/ +66.00 A = 19* 41" 45.6" (RT) A = 32° 36' 16.1" (LT) A = 30* 28" /0.1" (RT) A = 54* 35" 03.7" (RT) A = 83* 3/" 34.9" (LT) N z D = 38* 11`49.9" D = 14* 19'26.2" D = 14* 19'26.2" D = 57* 17" 44.8" D = 57* 17" 44.8" STREAM SF5 L = 51.56" L = 227.62" L = 212.72' L = 95.27" L = 145.78 ....... . .... T = 26.04' T = 116.99' T = 108.94" T = 51.60' T = 89.29 ti .... ... ..... R = 150.00" R = 400.00" R = 400.00" R = 100.00' R = 100.00 N" 7 82+00 83+00 84+00 85+00 [:]moft 166�11111 F5 I 1:610IM11111 103=8111 101010IM11111 P1 = 89+15.0 EL = 164.48' i/t, = can., FOORGIM11111 16J 011=1111 P/ 91+10.00 EL 164.45" i1r = qn,, 4, 0j"M11% .)uuu/. (—)l.l96j7 M F- N Lu C) C E 0 (D CO W W > C-4 Lc"" H .0 F- F- ca Z Lu c)) af So w, '5 ><-Tomm2oz LL [u- 0) CD u' ' — 5 .. J! 0) cy) co C14 LL Z 0 U) 0 Lu F_ Lu < Lu LU V) kD N z cj� u < r1i u N 00 LL Lu Q Z , r-i T o 0-6 u') W U) 3: Lu P_ LU 00 < D J C11 a- N Ln M U 0� Lu > Lu V) z Lu 0 LU 0C U < 0 0 D a 0 a = w z 13� Lu z z z Lu Lu 0 Lu V) Y U 0 Ln 9 U co Lu z _j u 0 . u > 170 PRELIMINARY PLANS 1� DO NOT USE FOR CONSTRUCTION I 160 DATE: NOVEMBER 23, 2011 150 REVISIONS: 1 NO. DATE 140 1 PROJECT NO.: H9001.00 130 92+00 93+00 1 9 N Lu C) C E 0 co CC,:)) CO > C-4 Lc"" H .0 F- F- ca Z Lu c)) af So w, '5 ><-Tomm2oz LL [u- 0) CD u' ' — 5 .. J! 0) cy) co C14 LL 2 rc 5 LL Lu 0 Lu F_ Lu U) V) z 170 PRELIMINARY PLANS 1� DO NOT USE FOR CONSTRUCTION I 160 DATE: NOVEMBER 23, 2011 150 REVISIONS: 1 NO. DATE 140 1 PROJECT NO.: H9001.00 130 92+00 93+00 1 9 X11,....._ . obe . ... OOL -WB-CURVE DATA LU LU Ce (D LU \__j P1 STA. 95 +97.56 P1 STA. /0/ +39.88 P-111 z . . . ........ . III Z U) z A = 22* 27" 44.6" (RT) A = 7* 33" 40.4" (LT) 0 ............ r- oot D = 9* 32" 57.5" D = 9° 32' 57.5" < LU kD LU N L = 2,35.23" L = 79.18" cj� N N 22 U< U 00 . ......... Uj X: T = 119.14" T = 39.65 Z N z LL 8 , T Uj R= 600.00" R= 600.00' 06 En m r, LU LU ko ce NIF 0 U) (D 0 LU L9 21 s P- L'U Op ALMUS J JEFFREYS JR loo Ce rj _j ori 13� 23 < N � r_1 0 DB 00325, PG O—E— o- N En ON 00 LU PIN 1732587444 NIF loo Ln A.J. /// & NIF CHRISTY D. A J JEFFREYS JR U JEFFREYS DB 0/137, PG 053/ 0 U-) DB 6178, PG 405 CD 0 PIN 1732680665 DETAIL 1 BM 1986, PG 1496 Uj PIN 1732584766 CUT DITCH z (Not to Scale) 5 U 0 Front 0 01, Natural el Ditch 24 Slope Ground :1 \ . ..... . . . ..... 00 L D Ln Q) .4 . ..... 00L .. . ... . ......... NIF .................... . 'ZI., .... . .... . Min. D = 1 Ft. LEAMON B.& MARY . . ... . ...... . .. . ..... . . .... - — ----------- - - tmp, of Liner= PSRM Max. d = 1 Ft. L. WOODARD D8 1436, PG 820 001" FROM S .102+80 -WB- TO STA. 104 + 55 -WB- PIN 1732780525 Uj Ln ty) > rn Q:) W) LU LU Q) 6 V) WETLAND RW8 Q) .::T -Q) C:) Q0 Ar 11q_ v___ Uj LU Q_ Uj PGE 00 �e z PGE v 5, PGE PGE Ln lun, F Q_ Q_ I P ?Ge PGE PGE 0 ;.A PGE_ 0 -e P P DUAL 22'-36- HDPE Ln Uj W/DUAL HEADWALLS -r- -S 71* 571 -F- + S 0 X_ F 0 Q0 Q_ F X t.0 ----------------- _ uJ GIE PGE ------------- ='X -� —7r GE 0 U .......... -=5z-- (I — A PGE ------- PROP DUAL 32'-42" HDPE T-4 O 7—F PGE PGE E F Pm A_ PGE IF P E -F= ?GE PGE PGE F PGE 0 Ln _� —7- f Liner= Sb --!ROM S A 1027 81 C') _PG ----------- . .. . ...... Fw. .. . ......... . .. . ......... FW . ... . .... .. f... . ... . ........ Fw . ... . ............ . ... . .......... FW F Fw . ........ . .. . ........ . .. . ........ . .. . ....... . .. . ...... .... . . ................. . ...................... FW ...................... . ........ . ......................... W Uj VIA- 0 PGE FW ---- — -------------------------------------- ............. Fw EST 23 TONS CLASS 'B' RIP RAP X F PG PGE RAP EST 56 SY FILTER FABRIC 0 GE EST I TON CLASS 'B' RIP 141 X 14'W VELOCITY DISSIPATOR PAD ca EST 2 SY FILTER FABRIC 61 X 3'W X 17 VELOCITY DISSIPATOR PAD %, EST 9 TONS CLASS 'RIP RAP Uj EST 20 SY FILTER FA IC z i?,i Y ow winriTy MMPAMR PAn 17ulorl F/ = EL = VC = 170 16 0 - )1.-1963% 150 140 130 94+00 081IM1111 019-CE1181 0IM0111 0160IM1111 016=11111 P1 102+10.00 EL = 161.66" VC /00/ in ._1 • 12.5000,o �, PRELIMINARY PLANS 170 DO NOT USE FOR CONSTRUCTION /_/ = lulf-r1fu EL = 175.16'* VC = 801 PROP DUAL 32 160 DATE: NOVEMBER 23, 2011 REVISIONS: 150 NO. DATE 140 PROJECT NO.: 130 H9001.00 100+00 101+00 102+00 103+00 104+00 105+00 106+00 1 10 C/) LU C) E 0 CC,:)) C"4) 83 > C-4 LU C-) F- F- .0 ca .1 T Z c) c) LU C:) 6 af 0m 0 05 cc m LL U) 'z — 5 _j m 0) C14 LL 2 5 LL Uj LU LU V) z • 12.5000,o �, PRELIMINARY PLANS 170 DO NOT USE FOR CONSTRUCTION /_/ = lulf-r1fu EL = 175.16'* VC = 801 PROP DUAL 32 160 DATE: NOVEMBER 23, 2011 REVISIONS: 150 NO. DATE 140 PROJECT NO.: 130 H9001.00 100+00 101+00 102+00 103+00 104+00 105+00 106+00 1 10 FOR BOARDWALK DETAILS, SEE SB SHEET SERIES -WB - CURVE DATA P! STA. 108 +83.01 P! STA. 116 +71.07 = 33° 39' 45.6" (LT) 0 = 12° 27",32.2" (RT ) D = 14° 19'26.2" D = //* 27",33.0" L = 235.01' L = 108.72' T = 121.01' T = 54.58' R = 400.00' R = 500.00' STREAM RS1 l is TEMPORARY STREAM CROSSING SEE DETAIL ON SHEET 2A f fli o h J 4 rn t N ff f M �/ f ff 10' CONCRETE fj' r w\ APPROACH SLAB W J / p W /BOLLARDS uj t 'jJ Lu W Cn P PGE W Z) t' — -F— x U-1 z F —x�= F F F F '3 .411E + O PGE F PG PGE PG Q: ��/ ti U s O1 BEGI BOARDWALK 6 V) -WB- STA. 118 + 33.42 ' w 00 z a- 0 }$s w z 1 w z z g a Z w w _O Z W U) Y U O Ln Q w Z J U O > H c/' 0 U DC C7 C O w w Lu H U � � � U ~ Cc MM d0 Z LL J O) DD q U) H LL z c~n W a 0 Lu w 0G a ♦^ V) z � w 2 N U 00 00 LL Q � , T O�' �w�C7o °_ ; U) 3:w �; 00 D! d N J (1 N (n m H U fli o h J 4 rn t N ff f M �/ f ff 10' CONCRETE fj' r w\ APPROACH SLAB W J / p W /BOLLARDS uj t 'jJ Lu W Cn P PGE W Z) t' — -F— x U-1 z F —x�= F F F F '3 .411E + O PGE F PG PGE PG Q: ��/ ti U s O1 BEGI BOARDWALK 6 V) -WB- STA. 118 + 33.42 ' w 00 z a- 0 }$s w z 1 w z z g a Z w w _O Z W U) Y U O Ln Q w Z J U O > / / /VU 1 '7J.VV - rl llO T oV.VU , = 4 , 18 O EL 168. o EL 159.76 180 VC = 80 - _ + Pl 118 +80.00 Pl ll4 90.00 r _ = EL - 159.76 .:BEGIN BOARDWALK 5 ( 4 / Pl 1/2 5Q.OQ ......)....0000 0 E - l 0.30 L 6 —WB— STA. 10 + .........7.01 — 9 9 — e EL 158.27 ._ VC 80 17O ()3.00n0% BEGIN BOARDWALK b 170 o N W � DO% 0 .Q 40 0 ( )Q ! — — D® N ®'P" USQ•, Q•' ®IIt CONSTRUCTION V C 2Q'' J B TA 11 + 42 5 W S 8 33. O O O e / J1.5 478/ 0.9 ( 0 00 + 1. 00/ X2.0 0Q D/ ( ) 00 + 30 160 � _ _ 160 .� � _.. _ Pl 108 9o.DQ T e —�/.�)�J- EL 169.02....... 000......... +)3 ,. _ 0/ _ Pf !/ 7 DATE. NOVEMBER 23 2011 + 0....37.0.... VC 80 Pf 109 97.07 ................. + o , Pl fl3 75.00 P1 1/ REVISIONS. 6 20.00 = EL _ !62.53 + EL 163.93......... ()O.00QO/ 150 150 END BOARDWALK 5 , NO. DATE - B- STA. 1 Tl + 4 .Ol EL .62.02 EL !61..92.. W 7 _ + + r )1.o00oi Pr rfo f7.o7 , VC =loo = , VC 65 EL = 163.13 140 140 PROJECT NO.. H9001.00 130 130 SCALE: 107 +00 108 +00 109 +00 110 +00 111 +00 112 +00 113 +00 114 +00 115 +00 116 +00 117 +00 118 +00 119 +00 c/' 0 U DC J co N C O Lu H U � � � U Z W o =0°00M0 Cc MM d0 Z LL J O) DD q U) H LL 2sZy 2 5 LL w W a Lu w 0G a ♦^ V) z a / / /VU 1 '7J.VV - rl llO T oV.VU , = 4 , 18 O EL 168. o EL 159.76 180 VC = 80 - _ + Pl 118 +80.00 Pl ll4 90.00 r _ = EL - 159.76 .:BEGIN BOARDWALK 5 ( 4 / Pl 1/2 5Q.OQ ......)....0000 0 E - l 0.30 L 6 —WB— STA. 10 + .........7.01 — 9 9 — e EL 158.27 ._ VC 80 17O ()3.00n0% BEGIN BOARDWALK b 170 o N W � DO% 0 .Q 40 0 ( )Q ! — — D® N ®'P" USQ•, Q•' ®IIt CONSTRUCTION V C 2Q'' J B TA 11 + 42 5 W S 8 33. O O O e / J1.5 478/ 0.9 ( 0 00 + 1. 00/ X2.0 0Q D/ ( ) 00 + 30 160 � _ _ 160 .� � _.. _ Pl 108 9o.DQ T e —�/.�)�J- EL 169.02....... 000......... +)3 ,. _ 0/ _ Pf !/ 7 DATE. NOVEMBER 23 2011 + 0....37.0.... VC 80 Pf 109 97.07 ................. + o , Pl fl3 75.00 P1 1/ REVISIONS. 6 20.00 = EL _ !62.53 + EL 163.93......... ()O.00QO/ 150 150 END BOARDWALK 5 , NO. DATE - B- STA. 1 Tl + 4 .Ol EL .62.02 EL !61..92.. W 7 _ + + r )1.o00oi Pr rfo f7.o7 , VC =loo = , VC 65 EL = 163.13 140 140 PROJECT NO.. H9001.00 130 130 SCALE: 107 +00 108 +00 109 +00 110 +00 111 +00 112 +00 113 +00 114 +00 115 +00 116 +00 117 +00 118 +00 119 +00 ne w J w �1 z W 0 W � DC U Q No Z a J O a = � w z a w z z g a Z W W i� _O Z W V) Y U O Ln Q w z J U O > B- TA. 122 + W S 8b85 190 190 EL 1 .00 - 77 BAR ELL ROAD BRIDGE EL 63.66 t J4 / (+)4.00007. W O G - I .000 a EL 59.96........ 180 180 + PRELIMINARY PLANS P/ 120+30.00 (+)5.0000;/. t J5.OQ0 20 3o.oa D® N ®'P" USQ•, Q•' ®IIt CONSTRUCTION Pl 1I9 20.00 (+)0.00007. EL 163.86 ' ``� r - a EL .60.36.... ( 4 .0000... a o 1 170 170 + )5.Q000/ 0 0 0 0 6• e L +) 0 14.1 7 0 0 S 3. O O o O J2.OQ00% END BOARDWALK s � 7 f DATE. NOVEMBER 23 2011 a .00 0 REVISIONS: 0 WB STA.125......... +17.85 0 � 0 O + 3. O 160 ,. 160 NO. DATE Pl 122 46.85 .8 - S 0 a Pl I34 50.04....... � 0 � 0 _ 3 a o - + - + Pl 124.....57.85 , - Pl .....124 77.85....... EL 6.3 _ + PI l 4 7 EL 169.20 2 3 .85 22 26.85 - EL 6.6 _ _ Pl 122.......56.85 EL ..175.97 127+50.00 .: VC l00 _ EL .........176.97 + Pl I 0 0.0 2 5 � EL 175.47 P1 124 67.85 - - Pl l24 87.85 EL 160.20 EL /76.67 _ - Pl 124...47.85......... 1 - 150 50 EL .........164.86 EL 176.37 , PROJECT NO.. Pl l 6. _ Pl I 76. r 22.3 85 122+66.85 22 85 EL 175.47 VC 90 Pl EL 176.87 ,.......... EL 175.97 _ EL 176.97 - I76. 7 EL 8 H9001.00 140 140 SCALE: 119 +00 120 +00 121 +00 122 +00 123 +00 124 +00 125 +00 126 +00 127 +00 128 +00 129 +00 130 +00 131 +00 12 H rn V w w H � Z cn o Q < LU kD oC � w 2 N U 00 LL �HT'z'n O � w L 2 C7 o �j W �--� 00 Q� d N J 01 N (n ON H U ne w J w �1 z W 0 W � DC U Q No Z a J O a = � w z a w z z g a Z W W i� _O Z W V) Y U O Ln Q w z J U O > B- TA. 122 + W S 8b85 190 190 EL 1 .00 - 77 BAR ELL ROAD BRIDGE EL 63.66 t J4 / (+)4.00007. W O G - I .000 a EL 59.96........ 180 180 + PRELIMINARY PLANS P/ 120+30.00 (+)5.0000;/. t J5.OQ0 20 3o.oa D® N ®'P" USQ•, Q•' ®IIt CONSTRUCTION Pl 1I9 20.00 (+)0.00007. EL 163.86 ' ``� r - a EL .60.36.... ( 4 .0000... a o 1 170 170 + )5.Q000/ 0 0 0 0 6• e L +) 0 14.1 7 0 0 S 3. O O o O J2.OQ00% END BOARDWALK s � 7 f DATE. NOVEMBER 23 2011 a .00 0 REVISIONS: 0 WB STA.125......... +17.85 0 � 0 O + 3. O 160 ,. 160 NO. DATE Pl 122 46.85 .8 - S 0 a Pl I34 50.04....... � 0 � 0 _ 3 a o - + - + Pl 124.....57.85 , - Pl .....124 77.85....... EL 6.3 _ + PI l 4 7 EL 169.20 2 3 .85 22 26.85 - EL 6.6 _ _ Pl 122.......56.85 EL ..175.97 127+50.00 .: VC l00 _ EL .........176.97 + Pl I 0 0.0 2 5 � EL 175.47 P1 124 67.85 - - Pl l24 87.85 EL 160.20 EL /76.67 _ - Pl 124...47.85......... 1 - 150 50 EL .........164.86 EL 176.37 , PROJECT NO.. Pl l 6. _ Pl I 76. r 22.3 85 122+66.85 22 85 EL 175.47 VC 90 Pl EL 176.87 ,.......... EL 175.97 _ EL 176.97 - I76. 7 EL 8 H9001.00 140 140 SCALE: 119 +00 120 +00 121 +00 122 +00 123 +00 124 +00 125 +00 126 +00 127 +00 128 +00 129 +00 130 +00 131 +00 12 BY 1966, PG 125 PIN 1732877886 r fr r , FROM STA.135 +65 TO STA.137 +75 WB- f 1�w 0 = 19° 49' 42.0" (LT ) H 28° 38' 52.4" -WB- CURVE DATA rn V 34.96' w w Pl STA. /30 +61.52 P1 STA. l3/ +55.52 0 = H D = � 65° 39",39.4" (LT) 0 = 24° 46' 10.2" (RT ) 65.19' Z cn D = 57° 17-44.8" D = 28° 38' 52.4" Q LU 150.61' N 114.60' QC w 2 U 00 T = LL Q� 43.92' ,--i Z T O 100.00' u') w 200.00' 2 C7 0 U) �j w --� 00 Lu A = Q� d N 560 08' 16.6° (LT ) J 01 D = N Ln ON H L = 171.65' L = 97.98' U T = 104.24, BY 1966, PG 125 PIN 1732877886 r fr r , FROM STA.135 +65 TO STA.137 +75 WB- f 1�w 0 = 19° 49' 42.0" (LT ) D = 28° 38' 52.4" -WB- CURVE DATA T = 34.96' R = Pl STA. /30 +61.52 P1 STA. l3/ +55.52 0 = 66° 11" 58.1" (RT ) D = 0 = 65° 39",39.4" (LT) 0 = 24° 46' 10.2" (RT ) 65.19' R = 100.00' D = 57° 17-44.8" D = 28° 38' 52.4" °37'11.0" L = 150.61' L = 114.60' L = 86.46' T = 64.52' T = 43.92' R = 100.00' R = 200.00' P1 STA. 133 +7/.51 P1 STA. 134 +92.26 A = 81 057',30.5° (RT) A 560 08' 16.6° (LT ) D = 47 44 47.3 D = 57 17 44.8 L = 171.65' L = 97.98' T = 104.24, � as R 120.00 R = 0 0.00' FF�r�i P1 STA. 138 +37.13 P1 STA. 139 +90.92 A = 104 34 45.0 // (RT) D = 58 09 59.4 (LT ) D = 71° 37' 11.0" D = 28° 38' 52.4" L = 146.02' L = 203.04' T = 103.47' T = 111.24' R = 80.00' R = 200.00' 180 WB- STA. 135 + 02.85 P/ = 139 +3 P/ = 131+60.00 P1 = 133 +25.00 EL 165.6: EL = 163.70' f l = 135 +85.00 EL = 163.20' VC = 100' /� _ Qti• _ _ EL = 161.88' 170 160 (- )0.3000/ (- )0.3000/ ( +)2.5534;° ( +)3.0000!° P1 = 138 +15.00 P1 -- 134 +60.00' EL = 168.78' EL 166.38` END BOARDWALK -WB- STA. 135 + 52.$5 VC - 80' 150 uc 72' = 140 130 132 +00 133 +00 134 +00 135 +00 136 +00 137 +00 138 +00 139 +00 140 +00 (+)Q.7690;/- (, P1 STA. 132 +33.02 0 = 19° 49' 42.0" (LT ) D = 28° 38' 52.4" L = 69.2/' T = 34.96' R = 200.00' P1 STA. 136 +02.10 0 = 66° 11" 58.1" (RT ) D = 57° l7' 44.8" L = 115.54' T = 65.19' R = 100.00' Pl STA. 14/ +92.56 A = 107° 52' 00.2" (RT ) D =71 °37'11.0" L = 150.61' T = 109.84' R = 80.00' '/ = 14/ +' I = 167, C = 80' .00 141 +00 142 +00 • 170 160 150 140 130 m 0 w �c a w �c a V) z AS- �e W W DC U Z J a w a w w z O H D Q O w a O 2 w Z a w z z g a Z w w i� _O Z W V) Y U O Ln Q w z J U O > N 0 LJ� Lu i N C O Lu U � w .4 m m 3 ��Ur MM d0 u- Lu Fu N z M CD J 0) O) 2sZ !2 Lu ntn PRELIMINARY PLANS I D® NOT USE FOR CONSTRUCTI ®N DATE: NOVEMBER 23, 2011 REVISIONS: NO. DATE PROJECT NO.: H9001.00 13