HomeMy WebLinkAboutNC0020401_Regional Office Historical File Pre 2018NORTH CAROLINA DIVISION OF WATER RESOURCES
- PRETREATMENT COMPLIANCE INSPECTION (PCI)'REPORT
BACKGROUND INFORMATION [Complete Prior To PCI; Review Program Info Database Sheet(s)l
1. Control Authority (POTTW)-Name: City of hickory
2. Control Authority Representative(s): Susan McNeely
3. Title(s): Pretreatment Coordinator -
4. Last Inspection Date: 3/4/15 Inspection Type: LJ PCI LI Audit
5. Has Program Completed All Requirements from the Previous Inspection and Program Info Sheet(s)? ® YES ❑ NO
6. Is POTW under an Order That Includes Pretreatment Conditions? ❑ YES ® NO _
Order Type, Number, Parameters: Are Milestone Dates Being Met? ❑ YES ❑ NO ®NA
PCS CODING
Trans.Code Main Program Permit Number MM/DD/YY Inspec.Type Inspector Fac. Type
`N NCO020401 12/16/16 P S 1
(DTTA) (TYPTI (TNSP) (FACC)
7. Current Number Of Significant Industrial Users SIUs ?
15
SILTS
S. Current Number Of Categorical Industrial Users ClUs)?
0
CIUS
.9. -:Number of SlUs Not Inspected By POTW in the Last Calendar Year?
-0
10.. Number of SIUs Not Sampled By POTW "in the Last Calendar Year?
0
.11. Enter'the.Hi er Number of 9 or 10
0
NOIN
.12. Number of SIUs With No IUP, or With an Expired IUP
0
NOCM
U. Number of Sibs in SNC for Either Reporting or Limits Violations During Either of the Last 2
0
Semi -Annual Periods (Total Number of S1Us in SNC)
pSNC
14. Number of SIUs in SNC For Reporting 22EiRg Either of the Last 2 Semi-Annual'Pedods
0
MSNC
15. Number of SIUs In SNC For Limits Violations DuriAg Either of the Last 2 Semi -Annual Periods
0
SNPS
46. Number of SIUs In SNC For Both Reporting and Limits Violations During Either of the Last 2
0
Semi-annual Periods
POTW_ INTERVIEW
17. Since the Last PCI, has the POTW had any NPDES Limits. Violations?
If Yes, What are the Parameters and How are these Problems Being Addressed?
18. ; Since the Last PCI, has the POTW-had any Problems Related to, an Industrial
Discharge (Interference, Pass -Through, Blockage, Citizens' Complaints, Increased
Sludge Production, Etc.)?
If Yes, How are these Problems Being Addressed?
19. Which Industries have been in SNC for Limits or: Reporting during • SNGfo
either of the Last 2Semrr t-Annual Periods? Not Been Published for SNC fo
`Public Notice?(May refeo PAR if Excessive SIUs in SNC) Not Pu
20. Which. Industries are on Compliance Schedules or Orders? For all SIUs, on an
Order; Has a Signed Copy of the Order been sent to the Division?'
Are Any Permits Or Civil Penalties Currently Under Adjudication?'IfYes, Which
❑ YES ®NO
❑ YES ®NO
r Limits: None ,
r Reporting: None
blished: NA
None
❑`YES ® NO'
y 28. 'PRETREATMENT PROGRAM ELEMENTS REVIEW Please review POTW files, verify POTW has'copy of PrograaiElement in
• their files, complete.with-supporting documents and copy of PERCS Ap royal Letter, and dates consistent with Pro Info:
Program Element
Northeast WWTP (NC0020401)
Last Submittal Received
Date ..In file?
Last Approval
Date In Me
Date Next Due,
If Applicable
Headworks Analysis A
7/29/14
N Yes ❑ No
12/1/14
0 Yes ❑ No
8/1/19
Industrial Waste Surve _ S
10/1/13
N Yes ❑ No
12/16/13
® Yes ❑ No
10/1/18
Sewer Use Ordinance SUO .
9/20/12
M Yes ❑ No
' 10/22/12
® Yes ❑ No
Enforcement Response Plan RP
12/10/92
N Yes ❑ No
3/9/93
N Yes ❑ No
Long Term Monitoring Plan (LTMP)
3/13/13
N Yes ❑ No
3/22/13
N Yes ❑ No
Program Element
Henry Fork WWTP (NC0040797)
Last Submittal Received '
Date In file?
Last Approval
Date In file
Date Next Due,
If Applicable
Headworks Analysis A
4/2/13
N Yes ❑ No
7/8/13
M Yes ❑ No
4/1/18
Industrial Waste Survey S
10/1/13
N Yes ❑ No
12/16/13
M Yes ❑ No
10/1/18
Sewer Use Ordinance SUO
9120/12
M Yes ❑ No
10/22/12
M Yes ❑ No
Enforcement Response. Plan RP
12/10/92
M Yes ❑ No
3/9/93
N Yes ❑ No
Long Term Monitoring Plan (LTMP)
7/10/02
M Yes ❑ No
7/11/02
M Yes ❑ No
INDUSTRIALUSER PERMIT (IUP) FILE REVIEW 3 IUP FILE REVIEWS OR.1 FILE REVIEW AND 1 IU INSPECTION)
29. User Name 1. Catawba Valley Medical Center FTCorning Optical 11 3.Century Furniture
30. 1UP Number 6003 0024 0034
31. Does File -Contain Current Permit? M Yes ❑ No M Yes ❑ No 11 M Yes ❑ No
32. Permit Expiration Date 7/7/21 7/7/21 . 7/7/19
33. Categorical Standard Applied .E. 40 CFR, Etc. Or N/A 460 NA . ' NA
34. Does File Contain Permit Application Completed Within One Year Prior M Yes ❑ No M Yes ❑ No M Yes ❑ No
to Permit Issue Date?
35. Does File Contain an Insection Completed Within Last Calendar Year? I N Yes ❑ No 11 N Yes ❑ No 11 N.Yes- ❑ No
36. a. Does the File Contain a Slug/Spill Control Plan? '
a. ®Yes ❑No
a. ®Yes ❑No
a. ®Yes' ❑No
-b. If No, is One Needed? See Inspection Form from POTW)
b. []Yes ❑No
b. ❑Yes ❑No
b. ❑Yes ❑No
37. For 40 CFR 413 and 433 TTO Certification, Does File Contain a Toxic
❑Yes❑NoON/A
❑Yes❑NoON/A
❑Yes❑No®N/A
Organic Manaement Plan (TOMB)?
38. a: Does File Contain Original Permit Review Letter from the Division?
a. ®Yes []No Ia.
®Yes ❑No
a. ®Yes [No
b. All Issues Resolved?
b.❑Yes❑No®N/A
b.❑Yes❑No®N/A
b.❑Yes❑No®N/A
39. During the Most Recent Semi -Annual Period, Did the POTW Complete
N Yes ❑ No
M Yes ❑ No
N Yes ❑ No
its Sampling as Required by IUP, including flow?
40.. Does File Contain POTW Sampling Chain -Of -Custody Forms?
M Yes ❑ . No
11 N Yes ❑ No 11
N Yes ❑ No
41a. During the Most Recent Semi -Annual Period, Did the SIU'Complete its
®Yes❑No❑N/A
®Yes❑No❑N/A1'0Yes0No0N1A
Sampling as Required by IUP, including flow?
41b. During the Most Recent Semi -Annual Period, Did SIU submit all reports
®Yes❑No❑N/A
®Yes❑No❑N/A
®Yes❑No❑N/A
on time?
42a. For categorical lUs with Combined Wastestream Formula (CWF), does ❑Yes❑No®N/A ❑Yes❑No®N/A ❑YespNoIIN/A
filI
e include process/dilution flows as Required by IUP?11
42b.'`.For categorical IUs with Production based limits, does file .'include
43,a.' During the Most Recent Semi -Annual Period, Did. the'
All Limits Non -Compliance from Both POTW and SIU
43b. ' During the Most Recent Semi Annual Period, Did the
All Reporting Non -Compliance from SIU'Sampling?' .
44.a. Was the POTWNotified by-SIU (Within 24 Hours) ofAll Self-
1Vlomtoruig yiolahons7 � ti .
b Did Industry Resample and submit results to POTW Within 30 Days?
:. ,.
c: Did POTW resample tvithm 30 days :of ]rnowledge of SIU limit:'
17W. Identify
npling?
rW Identify
❑Yes❑NoON/A ❑Yes❑No®N/A.- ❑Yes❑NoON/A
®Yes❑No❑NA_]I ❑Yes❑No®N/A ®Yes❑No❑N/A
❑Yes❑No®N/A.
OaYes❑No❑N/A .
} -0Y613No❑N/A
'a.❑Yes❑No®N/A,', a.OYes®No❑N/A
'b ❑y6E3No®N/A b ®YespNo❑N/A
�
4c �YesONo®N/A c OYes❑Nyo®N/A
SIU m SIC? II ❑,Yes,: ® No > IL;;. ❑Yes M''No II ❑Yes ®No II
46. During &146st Recent Semi- Period, Was Enforcement Taken
as Specified in the-POTW s-ERP (NOV9, Penalties; timing, etc.)?
47:... Does :the File Contain Penalty Assessment Notices?
48. -Does The File Contain Proof Of Penalty Collection?
49. a. Does the File Contaui Any Current Enforcement Orders? .
b. Is SIU in Compliance with Order?
50. Did the POTW Representative Have Difficulty. in Obtaining Any of This
Requested Information For You?_.
FILE REVIEW COMMENTS:
28. SUO adopted on 1.2/21/12.
a.❑YespNo®N/A
Yes U No U Yes Q9 No
❑Yes❑NOON/A
❑Yes❑No,®N/A
l anYesoNo®N/A
J b.OYes[3No®N/A
1 . Yes .No
J
35. POTW inspections: Catawba. Valley Medical Center (8/11/16); Corning Optical (9/29/16); and Century Furniture (9/8/16).
. 36..Slug/Spill Control Plans (date received by POTW): Catawba Valley Medical Center (5/7/15); Corning Optical (4/4/16); and
Century Furniture (1/5/16).
39. POTW's laboratory performs conventional parameters and contracts Pace Analytical Services, Inc. (low level mercury, TKN, total
nitrogen, toluene, metals, oil & grease) and Blue Ridge Labs (cyanide).
41a. SIU contracted laboratories: Catawba Valley Medical Center (Statesville Analytical); Corning.Optical (Water Tech Labs); and
Century Furniture (Blue Ridge Labs).
46, The POTW issued Notices of Noncompliance to Catawba Valley Medical Center for zinc and pH limit violations (January 2016)
and an oil & grease limit violation (March 2016). The POTW issued Notices of Noncompliance to Century Furniture -Pipe 001 for
BOD and TSS- limit violations (January 2016); ammonia limit violations (March —June 2016); and at the Century Furniture --:Pipe 002
for a chromium limit violation (February 2016) and the failure to report the chromium limit violation within 24-hrs. of first knowledge.
Note: Century Furniture's IUP was modified (effective -September 2016) to raise the ammonia permit limit.
SUMMARY AND COMMENTS:
Comments: Thevopper detection level (5.0 ug/L).being used for the Northeast WW.TP was above the detection level (2.0 ug/L) noted in the Division approved LTMP.. The POTW will use the lower copper detection level (via contracted laboratory) for all future LTMP
sampling events at the Northeast W WTP. Note: The POTW was using the lower.copper detection level for the LTMP sampling events
at the Henry Fork WWTP. .
The'POTW's records were organized and well. maintained. The POTW'sIndustrial Pretreatment Program was being properly .
implemented.
�
i
.
i
`
� _
�, .:.
•
}
�
�..
:..
_ .
,:.
,.. _,