Loading...
HomeMy WebLinkAboutNC0020401_Regional Office Historical File Pre 2018NORTH CAROLINA DIVISION OF WATER RESOURCES - PRETREATMENT COMPLIANCE INSPECTION (PCI)'REPORT BACKGROUND INFORMATION [Complete Prior To PCI; Review Program Info Database Sheet(s)l 1. Control Authority (POTTW)-Name: City of hickory 2. Control Authority Representative(s): Susan McNeely 3. Title(s): Pretreatment Coordinator - 4. Last Inspection Date: 3/4/15 Inspection Type: LJ PCI LI Audit 5. Has Program Completed All Requirements from the Previous Inspection and Program Info Sheet(s)? ® YES ❑ NO 6. Is POTW under an Order That Includes Pretreatment Conditions? ❑ YES ® NO _ Order Type, Number, Parameters: Are Milestone Dates Being Met? ❑ YES ❑ NO ®NA PCS CODING Trans.Code Main Program Permit Number MM/DD/YY Inspec.Type Inspector Fac. Type `N NCO020401 12/16/16 P S 1 (DTTA) (TYPTI (TNSP) (FACC) 7. Current Number Of Significant Industrial Users SIUs ? 15 SILTS S. Current Number Of Categorical Industrial Users ClUs)? 0 CIUS .9. -:Number of SlUs Not Inspected By POTW in the Last Calendar Year? -0 10.. Number of SIUs Not Sampled By POTW "in the Last Calendar Year? 0 .11. Enter'the.Hi er Number of 9 or 10 0 NOIN .12. Number of SIUs With No IUP, or With an Expired IUP 0 NOCM U. Number of Sibs in SNC for Either Reporting or Limits Violations During Either of the Last 2 0 Semi -Annual Periods (Total Number of S1Us in SNC) pSNC 14. Number of SIUs in SNC For Reporting 22EiRg Either of the Last 2 Semi-Annual'Pedods 0 MSNC 15. Number of SIUs In SNC For Limits Violations DuriAg Either of the Last 2 Semi -Annual Periods 0 SNPS 46. Number of SIUs In SNC For Both Reporting and Limits Violations During Either of the Last 2 0 Semi-annual Periods POTW_ INTERVIEW 17. Since the Last PCI, has the POTW had any NPDES Limits. Violations? If Yes, What are the Parameters and How are these Problems Being Addressed? 18. ; Since the Last PCI, has the POTW-had any Problems Related to, an Industrial Discharge (Interference, Pass -Through, Blockage, Citizens' Complaints, Increased Sludge Production, Etc.)? If Yes, How are these Problems Being Addressed? 19. Which Industries have been in SNC for Limits or: Reporting during • SNGfo either of the Last 2Semrr t-Annual Periods? Not Been Published for SNC fo `Public Notice?(May refeo PAR if Excessive SIUs in SNC) Not Pu 20. Which. Industries are on Compliance Schedules or Orders? For all SIUs, on an Order; Has a Signed Copy of the Order been sent to the Division?' Are Any Permits Or Civil Penalties Currently Under Adjudication?'IfYes, Which ❑ YES ®NO ❑ YES ®NO r Limits: None , r Reporting: None blished: NA None ❑`YES ® NO' y 28. 'PRETREATMENT PROGRAM ELEMENTS REVIEW Please review POTW files, verify POTW has'copy of PrograaiElement in • their files, complete.with-supporting documents and copy of PERCS Ap royal Letter, and dates consistent with Pro Info: Program Element Northeast WWTP (NC0020401) Last Submittal Received Date ..In file? Last Approval Date In Me Date Next Due, If Applicable Headworks Analysis A 7/29/14 N Yes ❑ No 12/1/14 0 Yes ❑ No 8/1/19 Industrial Waste Surve _ S 10/1/13 N Yes ❑ No 12/16/13 ® Yes ❑ No 10/1/18 Sewer Use Ordinance SUO . 9/20/12 M Yes ❑ No ' 10/22/12 ® Yes ❑ No Enforcement Response Plan RP 12/10/92 N Yes ❑ No 3/9/93 N Yes ❑ No Long Term Monitoring Plan (LTMP) 3/13/13 N Yes ❑ No 3/22/13 N Yes ❑ No Program Element Henry Fork WWTP (NC0040797) Last Submittal Received ' Date In file? Last Approval Date In file Date Next Due, If Applicable Headworks Analysis A 4/2/13 N Yes ❑ No 7/8/13 M Yes ❑ No 4/1/18 Industrial Waste Survey S 10/1/13 N Yes ❑ No 12/16/13 M Yes ❑ No 10/1/18 Sewer Use Ordinance SUO 9120/12 M Yes ❑ No 10/22/12 M Yes ❑ No Enforcement Response. Plan RP 12/10/92 M Yes ❑ No 3/9/93 N Yes ❑ No Long Term Monitoring Plan (LTMP) 7/10/02 M Yes ❑ No 7/11/02 M Yes ❑ No INDUSTRIALUSER PERMIT (IUP) FILE REVIEW 3 IUP FILE REVIEWS OR.1 FILE REVIEW AND 1 IU INSPECTION) 29. User Name 1. Catawba Valley Medical Center FTCorning Optical 11 3.Century Furniture 30. 1UP Number 6003 0024 0034 31. Does File -Contain Current Permit? M Yes ❑ No M Yes ❑ No 11 M Yes ❑ No 32. Permit Expiration Date 7/7/21 7/7/21 . 7/7/19 33. Categorical Standard Applied .E. 40 CFR, Etc. Or N/A 460 NA . ' NA 34. Does File Contain Permit Application Completed Within One Year Prior M Yes ❑ No M Yes ❑ No M Yes ❑ No to Permit Issue Date? 35. Does File Contain an Insection Completed Within Last Calendar Year? I N Yes ❑ No 11 N Yes ❑ No 11 N.Yes- ❑ No 36. a. Does the File Contain a Slug/Spill Control Plan? ' a. ®Yes ❑No a. ®Yes ❑No a. ®Yes' ❑No -b. If No, is One Needed? See Inspection Form from POTW) b. []Yes ❑No b. ❑Yes ❑No b. ❑Yes ❑No 37. For 40 CFR 413 and 433 TTO Certification, Does File Contain a Toxic ❑Yes❑NoON/A ❑Yes❑NoON/A ❑Yes❑No®N/A Organic Manaement Plan (TOMB)? 38. a: Does File Contain Original Permit Review Letter from the Division? a. ®Yes []No Ia. ®Yes ❑No a. ®Yes [No b. All Issues Resolved? b.❑Yes❑No®N/A b.❑Yes❑No®N/A b.❑Yes❑No®N/A 39. During the Most Recent Semi -Annual Period, Did the POTW Complete N Yes ❑ No M Yes ❑ No N Yes ❑ No its Sampling as Required by IUP, including flow? 40.. Does File Contain POTW Sampling Chain -Of -Custody Forms? M Yes ❑ . No 11 N Yes ❑ No 11 N Yes ❑ No 41a. During the Most Recent Semi -Annual Period, Did the SIU'Complete its ®Yes❑No❑N/A ®Yes❑No❑N/A1'0Yes0No0N1A Sampling as Required by IUP, including flow? 41b. During the Most Recent Semi -Annual Period, Did SIU submit all reports ®Yes❑No❑N/A ®Yes❑No❑N/A ®Yes❑No❑N/A on time? 42a. For categorical lUs with Combined Wastestream Formula (CWF), does ❑Yes❑No®N/A ❑Yes❑No®N/A ❑YespNoIIN/A filI e include process/dilution flows as Required by IUP?11 42b.'`.For categorical IUs with Production based limits, does file .'include 43,a.' During the Most Recent Semi -Annual Period, Did. the' All Limits Non -Compliance from Both POTW and SIU 43b. ' During the Most Recent Semi Annual Period, Did the All Reporting Non -Compliance from SIU'Sampling?' . 44.­a. Was the POTWNotified by-SIU (Within 24 Hours) ofAll Self- 1Vlomtoruig yiolahons7 � ti . b Did Industry Resample and submit results to POTW Within 30 Days? :. ,. c: Did POTW resample tvithm 30 days :of ]rnowledge of SIU limit:' 17W. Identify npling? rW Identify ❑Yes❑NoON/A ❑Yes❑No®N/A.- ❑Yes❑NoON/A ®Yes❑No❑NA_]I ❑Yes❑No®N/A ®Yes❑No❑N/A ❑Yes❑No®N/A. OaYes❑No❑N/A . } -0Y613No❑N/A 'a.❑Yes❑No®N/A,­', a.OYes®No❑N/A 'b ❑y6E3No®N/A b ®YespNo❑N/A � 4c �YesONo®N/A c OYes❑Nyo®N/A SIU m SIC? II ❑,Yes,: ® No > IL;;. ❑Yes M''No II ❑Yes ®No II 46. During &146st Recent Semi- Period, Was Enforcement Taken as Specified in the-POTW s-ERP (NOV9, Penalties; timing, etc.)? 47:... Does :the File Contain Penalty Assessment Notices? 48. -Does The File Contain Proof Of Penalty Collection? 49. a. Does the File Contaui Any Current Enforcement Orders? . b. Is SIU in Compliance with Order? 50. Did the POTW Representative Have Difficulty. in Obtaining Any of This Requested Information For You?_. FILE REVIEW COMMENTS: 28. SUO adopted on 1.2/21/12. a.❑YespNo®N/A Yes U No U Yes Q9 No ❑Yes❑NOON/A ❑Yes❑No,®N/A l anYesoNo®N/A J b.OYes[3No®N/A 1 . Yes .No J 35. POTW inspections: Catawba. Valley Medical Center (8/11/16); Corning Optical (9/29/16); and Century Furniture (9/8/16). . 36..Slug/Spill Control Plans (date received by POTW): Catawba Valley Medical Center (5/7/15); Corning Optical (4/4/16); and Century Furniture (1/5/16). 39. POTW's laboratory performs conventional parameters and contracts Pace Analytical Services, Inc. (low level mercury, TKN, total nitrogen, toluene, metals, oil & grease) and Blue Ridge Labs (cyanide). 41a. SIU contracted laboratories: Catawba Valley Medical Center (Statesville Analytical); Corning.Optical (Water Tech Labs); and Century Furniture (Blue Ridge Labs). 46, The POTW issued Notices of Noncompliance to Catawba Valley Medical Center for zinc and pH limit violations (January 2016) and an oil & grease limit violation (March 2016). The POTW issued Notices of Noncompliance to Century Furniture -Pipe 001 for BOD and TSS- limit violations (January 2016); ammonia limit violations (March —June 2016); and at the Century Furniture --:Pipe 002 for a chromium limit violation (February 2016) and the failure to report the chromium limit violation within 24-hrs. of first knowledge. Note: Century Furniture's IUP was modified (effective -September 2016) to raise the ammonia permit limit. SUMMARY AND COMMENTS: Comments: Thevopper detection level (5.0 ug/L).being used for the Northeast WW.TP was above the detection level (2.0 ug/L) noted in the Division approved LTMP.. The POTW will use the lower copper detection level (via contracted laboratory) for all future LTMP sampling events at the Northeast W WTP. Note: The POTW was using the lower.copper detection level for the LTMP sampling events at the Henry Fork WWTP. . The'POTW's records were organized and well. maintained. The POTW'sIndustrial Pretreatment Program was being properly . implemented. � i . i ` � _ �, .:. • } � �.. :.. _ . ,:. ,.. _,