Loading...
HomeMy WebLinkAbout20210211 Ver 1_NC 45 Oyster Creek Road Shoulder Repair and Stabilization_20210129Proposed Start of Riprap35.40 5088°-76 .3279 93° Proposed End of RiprapTotal L inear Feet of Riprap - 470'35.40 3899°-76 .3272 16° NCDOT GIS Unit, N orth Carolina Center for GeographicInformation and Analysis , NCDOT GIS Unit, North CarolinaCenter for Geographic Information and Analysis , NC OneMap,NC Center for Geographic Information and Analysis, NC 911Board 0 50 100 150 200 250 300 350 400 450 50025 Feet ³ Road Shoulder Repair and Stabilization on HWY 45 Swan QuarterOyster Creek RoadHyde County Quad Name Swan Quarter Date: 29 January 2021 Sheet 1 of 2