From: Witherspoon, Lauren
Sent: Monday, January 30, 2012 12:35 PM
To: Strickland, Bev
Subject: FW: UNC -CH Landfill Gas Project, DWQ Project # 11 -0594 v.2
Attachments: 20120112091948898.pdf; gasline - soils.pdf; Vicinity_Exhibit 2_revised_opt_l 0191 1.pdf;
20120112092009987. pdf
For laserfiche
Thanks,
lauren
- - - -- Original Message---- -
From: Mvers, Sharon (Environment Health & Safety) fmailto:samvers ciehs.una.edul
Sent: Thursdav, January- 12, 2012 10:03 AM
To: Witherspoon, Lauren
Subject: UNC -CH Landfill Gas Project, DWQ Project 4 11 -0594 w.2
Hi Lauren,
I sent the paper version of UNC's response to DWQ's request for additional information to Karen Higgins yesterday. I've
attached pdfs of the submittal for your review, in case it takes a -while for the paper copy to reach you.
Please let me kno-w if you have questions.
Thank vou.
Sharon
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a.
2b.
2c.
2d.
2e.
2f.
Wetland impact
Type of jurisdiction
number —
Type of impact
Type of wetland
Forested
(Corps - 404, 10
Area of impact
Permanent (P) or
(if known)
DWQ — non -404, other)
(acres)
Tem ora T
W1 ®P ❑ T
Permanent impacts
for installation of
Palustrine
Yes
®Corps
0.008
transmission line
Forested (PFO)
El No
El DWQ
W2 ❑ P ❑ T
trenching
PFO (Wetland F)
F1 Yes
❑ No
® Corps
❑ DWQ
0
W3 ❑ P ❑ T
trenching
PFO (Wetland C)
❑ Yes
❑ No
® Corps
❑ DWQ
0
W4 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W5 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W6 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
2g. Total wetland impacts
0.008
2h. Comments: Pre - construction grades will be re- established in the permanently impacted wetland following installation of the
gas transmission line. As the gas transmission line traverses the Carolina North property, it will be co- located with the Duct
Bank Utility Line Project in order to minimize environmental impacts. The Duct Bank Project will have already cleared a
construction corridor. Then, the Duct Bank will be installed first and the gas transmission line installation will immediately
follow. Following constrruction completion, pre - construction grade will be re- established at Wetlands C and F, and the areas
will be revegetated with native wetland plants.
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a.
3b.
3c.
3d.
3e.
3f.
3g.
Stream impact
Type of impact
Stream name
Perennial
Type of jurisdiction
Average
Impact
number -
(PE=R) or
(Corps - 404, 10
stream
length
Permanent (P) or
intermittent
DWQ — non -404,
width
(linear
Temporary (T)
(INT)?
other)
(feet)
feet)
S1 ®P EI T
culverted utility
unnamed (N. of
❑ PER
® Corps
4
69(P)
crossing
Eubanks Rd.)
® INT
❑ DWQ
28(T)
S2 ❑ P ❑ T
directional bore
Old Field Creek
® PER
® Corps
6
0
utility crossing
(E. of flare station)
❑ INT
0 DWQ
S3 ®P ®T
culverted utility
crossing within fill
Old Field Creek
(N, limit of Duke
® PER
Corps
4
41 (P)
section for road
Energy easement)
El INT
El DWQ
10(T)
crossing
Old Field Creek
S4 ® P ❑ T
directional bore
(forest south of
PER
® Corps
4
0
utility crossing
Duke Energy
❑ INT
❑ DWQ
easement)
S5 ❑ P ® T
trenching
Crow Branch
®PER
❑ INT
Corps
❑ DWQ
6
0
S6 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
3h. Total stream and tributary impacts
110 (P)
38 (T)
3i. Comments: Pump arounds will be used during the installation of the culverted crossings at S1 and S3, and directional
boring will be used at S2 and S4. S1 is a ermanent impact of 69 linear feet of stream due to installation of a culvert and this
Page 8 of 15
PCN Form — Version 1.3 December 10, 2008 Version
impact has already occurred under the existing Nationwide 12 Permit (SAW -2011- 01294). An additional 28 linear feet of
temporary impact was anticipated with construction at S1. The temporary impact at S1 includes the impacts from the pump
around. At S2 and S4 directional boring will be used to install the utility crossings, so there will be no impact to the stream
channels at these locations. S3 is a permanent impact of 41 linear feet of stream due to installation of a culvert. An additional
10 linear feet of temporary impact is anticipated with construction at S3, and this temporary impact includes the pump around
for the culverted stream crossing. S5 is a crossing of Crow Branch on the Carolina North property. As the gas transmission
line traverses the Carolina North property, it will be co- located with the Duct Bank Utility Dine Project in order to minimize
environmental impacts. The Duct Bank Project will have already cleared a construction corridor. The Duct Bank utility line will
be installed first and the gas transmission line installation will immediately follow, utilizing the same construction contractor.
Original grade will be re- established following construction.
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a.
4b.
4c.
4d.
4e.
Open water
Name of waterbody
impact number —
(if applicable)
Type of impact
Waterbody type
Area of impact (acres)
Permanent (P)
or Temporary
T
01 ❑P[IT
02 ❑P ❑T
03 ❑P ❑T
04 ❑P ❑T
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If pond or lake construction proposed, the complete the chart below.
5a.
5b.
5c.
5d.
5e.
Wetland Impacts (acres)
Stream Impacts (feet)
Upland
Pond ID
Proposed use or purpose of
(acres)
number
pond
Flooded
Filled
Excavated
Flooded
Filled
Excavated
Flooded
P1
P2
5f. Total
5g. Comments:
5h. Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit ED no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
Page 9 of 15
PCN Form — Version 1.3 December 10, 2008 Version
5�
1,,D if
� HrG
f �
•�. d \ AVS
fT -
ApC
,Ap Elba
A He C...E -.
+�v 4 {
Nu
41F
' T.c
s AnC Gb AAC Ea 0!C 1r8 En yrSa�
�+► C,e[ Ge8 Gay GaG r. `
FnC En$ E G++C 1 �fic . c*c f
-WMF G
'FP rt
-+W4 - i :�� CSC - .� = GeR 1 -
- S Iu8 LSItf!
� fa: A Eni r � FRi3 i - - l 1 •.:if
? 11
M!S +k f TS
ii+8 w•C r ,Li Pl F R
lib HFC 0 n 'i 44,c [
{
CnC H $ 1GaC ca
GeG
i
f:nC f
HNFf / .. ER8 Enii Ens G,e ;: '
616- L co FnG
►IrC Hfu Co a E-, V
4 r F,.0
i Lew EnC
Nos I fir$
Etli$ .
EnN iir$
I S'iDkAC$WSLI:SJI } sf9A1'LPG1Ri L `
0
knr; :11 fu8
f � �E• I'� F .
yt ESL w i a'r
lok
' i11rrr _ 1 1-srC CIE
5upty im 1) .5 6.v% OrA01r, C5 S6 'r 1 umAell
UNCi
January 11, 2012
The university of North Carolina at Chapel Hill
Department of Environment, Health & Safety
1120 Estes Drive Ext., CB# 1650
Chapel dill, North Carolina 27599.1650
Ms. Karen Higgins
North Carolina Division of Water Quality
Raleigh Regional Office
Surface Water Protection.
1628 Mail Service Center
Raleigh, NC 27699.1628
Subject: UNC -CH Landfill Gas Project
DWQ Project # 11 -0594 v.2
The University of North Carolina at Chapel Hill
Orange County, North Carolina
Dear Ms. Higgins:
1 am writing on behalf of The University of North Carolina at Chapel Hill (UNC -CH) in
response to your December 13, 2011 Request for More Information. The North Carolina
Division of Water Quality (DWQ) requests are shown in bold and UNC -CH's responses
follow. Five copies of this response are provided.
1. Section B. 3a indicates that the Duct Bank has been previously permitted. Please
provide the DWQ Project # information for the WQC and buffer authorization.
The DWQ Project # for the Duct Bank is 11 -0476.
2. Has DWQ conducted buffer determinations for all streams depicted on the Soil
Survey of Orange County (published version) and/or the USGS topographic
snap (1:24000) within your project limits? if so, please provide a copy of this
information. If not, please locate the project boundaries on the most recent
bound and published Soil Survey of Orange County and the USGS 1 :24000
topographic map for the project.
DWQ has not conducted field determinations for the portions of the project located
north of Homestead Road in Chapel Hill, North Carolina. A copy of the Soil Survey
of Orange County map with the location of the project boundaries is attached to this
response. A USGS topographic map showing the project boundaries was provided in
the 401 WQC application submitted on November 4, 2011 and is also provided with
this response.
3. Please include temporary stream impacts associated with S1 (28 LF) and S3 (10
LF) in the Stream Impact Table Section C.3.
The temporary stream impacts associated with S 1 and S3 have been included in the
Stream Impact Table Section C.3. The revised table is attached.
If you have any questions concerning response please contact me at (919) 962 -9752.
Sincerely,
Sharon A. Myers, L.G.
Environmental Compliance Officer
Enclosures
cc: Mr. John Carter
Dr. Daniel Elliott
Ms. Diane Gillis
Ms. Mary Beth Koza
Mr. Andy Williams
Page 2 of 2