Loading...
HomeMy WebLinkAbout20111075 Ver 1_Email_20071201R 2583 Fie :d Meeting on 12/17 Subject R -2583 Field Meeting on 12/17 From "Bradley D Smythe" <bsmythe @dot state nc us> Date Wed, 12 Dec 2007 08 56 51 0500 To USACE Bill Biddlecome <william J biddlecome @usace army mil> NCDCM Cathy Brittmgham < Cathy Brittmgham @ncmail net> NCDCM Jim Hoadley <Jim Hoadley@ncmail net> NCWRC Travis Wilson < Travis Wilson @ncwildlife org> NCDWQ David Wainwright < David Wamwnght @ncmail net> USFWS Gary Jordan <garyjordan @fws gov> Renee Gledhill Earley <renee gedhill earley@ncmail net> NMF Ron Sechler <Ron Sechler @noaa gov> NCDMF Sara Winslow <Sara Wmslow@ncmail net> Ann Whitley <awhitley @ucpcog org> Bob Capehart <bcapehart@dot state nc us> Clay Willis <tcwillis @dot state nc us> Glenn W Mumford PE' <gmumford @dot state nc us> 'Jeffrey L Teague PE <JLTeague @dot state nc us> 'John (Jay) W Twisdale Jr PE" <jtwisdale @dot state nc us> Chris D Manley <cdmanley @dot state nc us> Charles Cox <ccox @dot state nc us> Rob Hanson <rhanson @dot state nc us> "Scott L Emory <semory@dot state nc us> Anthony W Roper <aroper @dot state nc us> Jerry D Jennings <jjemmngs @dot state nc us >, Chris Rivenbark <cnvenbark @dot state nc us> CC USEPA Chris Militscher <militscher chns @epamail epa gov> USEPA Kathy Matthews <matthews kathy @epa gov> Greetings Attached is the draft concurrence meeting packet for TIP Project R 2583 US 158 widening in Hertford County from the Murfreesboro Bypass to US 13 You will receive the usual concurrence packet two to three weeks before the January 17th scheduled Concurrence meeting but the attached information is being provided prior to our field meeting to allow you time to review NCDOT s information I will provide paper copies of this document with maps at the field meeting for your use For the field meeting we will meet at the Mount Tabor Baptist Church located in the middle of the project on US 158 The meeting will begin at 9 30 with an introduction and project overview From the Church we will go to the existing US 158 bridge over Potecasi Creek then to Mill Branch We will then travel to the Alternative C crossing location of Potecasi Creek and finally to the Mapleton Community to look at the crossing of the Tributary to Potecasi Creek If you have any questions after reviewing the attached document please let me know otherwise we are prepared to answer questions at the field meeting My cell phone number in case you need to contact me Monday morning is 919 208 -8616 Thanks and have a great weekend, Brad Smythe P E Project Planning Engineer N C Dept of Transportation Project Development & Environmental Analysis 1548 Mail Service Center Raleigh NC 26799 -1548 Phone (919) 733 7844 ext 252 Fax (919) 733 -9794 Concurrence- pt -2a -3 doc Content -Type application/msword Content - Encoding base64 1 of 2 12/12/2007 8 58 AM Wainwright, David From Biddlecome William J SAW [William J Biddlecome @usace army mil] Sent Wednesday December 14 2011 9 44 AM To Wainwright David Subject RE R 2583 Application (UNCLASSIFIED) Classification UNCLASSIFIED Caveats NONE David, Good fob[ I m all over this as well Same problems you have I have as well I had a submittal form with mine that had some contacts and phone numbers with it Call Khaled Al Akhdar (he s first contact listed) at 919 707 -6612 He s already got an earful from me They are in process of getting me signatures along with some other stuff (EEP letter) as well As I got deeper into it as I m preparing my public notice, I also picked up that the impact numbers in the cover letter do not match the impact summary sheet numbers So they are getting me a corrected cover letter as well as they have told me the numbers in the summary sheet are the correct numbers Apparently NEU never got this application to review before it was sent out It came directly from consultant and design build side of the house Chris Manley is frustrated because I m going to him about the problems with the application and he had nothing to do with it Sounds like DOT had a little internal miss communication of how the process is suppose to work' Bill Original Message - -- From Wainwright, David fmailto david wainwright(@ncdenr govl Sent Wednesday, December 14, 2011 9 31 AM To Rivenbark, Chris Cc Biddlecome, William 7 SAW, Brittingham, Cathy, Lusk, Elizabeth L Subject R 2583 Application Chris I have done a brief review of the application for R 2583, US 158 in Hertford County, and have a few things that need to be addressed I am addressing this to you because there is no contact listed in the application (dust says contact Eme0) Four concerns 1 The ENG Form 4345 is not signed 2 The CAMA permit is not signed 3 You list an agent (Arcades) but have not signed the ENG 4345 form giving them permission to act on DOTOs behalf 4 There is no EEP acceptance letter attached r Since DWQ does not have its own form for IPs, we essentially piggyback on the others What we require is a signature from the applicant accepting responsibility for the project Where an agent is involved, we need acknowledgement that they have been given permission to act on behalf of the applicant In this case both could be taken from the Corps form Please address these deficiencies by the end of next Thursday (December 22) or we may return your application as incomplete Should you have any questions, please let me know Thank you David Wainwright NCDENR, Division of Water Quality Transportation Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699 -1650 Phone (919)807 -6405 Fax (919) 807 -6494 David Wainwright@ncdenr gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation P Please consider the environment before printing this email Classification UNCLASSIFIED Caveats NONE PJ