MEMORANDUM TO R 2583 Merger Team
FROM Charles R Cox PE
Project Engineer
Project Development & Enviroinmimenta Analysis Branch
SUBJECT Widening of US 158 from the Murfreesboro Bypass to US 13 west
of Winton Hertford County, WBS Element 35489 T I P Project
R 2583
Merger Team Meeting Minutes- January 17, 2008
A concurrence meeting for the subject project was held in the Transportation Building on
January 17 2008 The following people were in attendance
Bill Biddlecome
David Wainwright
Travis Wilson
Gary Jordan
Chris Mihtscher
Kathy Matthews
Ron Lucas
Cathy Brittmgham
Ron Sechler
Chris Rountree
Glenn Mumford
Jeffrey Teague
Kanchana Noland
Jay Twisdale
Jerry Jennings
Thomas Stoddard
Rob Hanson
Charles Cox
Beth Smyre
MAILING ADDRESS
NC DEPARTMENT OF TRANSPORTATION
PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS
1548 MAIL SERVICE CENTER
RALEIGH NC 27699 1548
U S Army Corps of Engineers (USACE)
N C Division of Water Quality (DWQ)
N C Wildlife Resources Commission (WRC)
U S Fish & Wildlife Service (USFWS)
U S Environmental Protection Agency (EPA)
U S Environmental Protection Agency
Federal Highway Administration (FHWA)
N C Division of Coastal Management (DCM)
National Marine Fisheries Service (NMFS) — via telephone
Peanut Belt RPO
Roadway Design
Roadway Design
Roadway Design
Hydraulics
Division 1
TIP Unit
Project Development & Environmental Analysis (PD &EA)
PD &EA
PD &EA
TELEPHONE 919 733 3141 LOCATION
FAX 919 733 9794 TRANSPORTATION BUILDING
1 SOUTH WILMINGTON STREET
WEBSITE WWW DOH DOT STATE NC US RALEIGH NC
R 2583 January 17 2008 Concurrence Meeting Minutes
Kristine Graham PD &EA
Trace Howell
PD &EA
Steve Gurganus
PD &EA
— Human Environment Unit
Chris Manley
PD &EA
— Natural Enviromment Unit (NEU)
Brad Chilton
PD &EA
— NEU
Manssa Rodman
PD &EA
— NEU
Bill Biddlecome (USACE) opened the meeting and then Charles Cox gave a presentation
Referring to the merger packet Charles gave background information on the project Then the
team began to discuss the current merger points
Most of the members of the merger team had already met on the site either on December
6 or December 17 2007 to examine the wetland /stream sites The minutes from both the field
meetings and the January 17 2008 merger meeting are reflected in these minutes
Concurrence Point 2A Bridginjz Decisions and Alignment Review
Site 1 (UT to Potecasi Creek, Mapleton Vicinity)
The existing culvert is located dust east of the Mapleton community that is being avoided
with some alternatives (see attached Table 4) For widening alternatives (A/B /C) NCDOT
proposed to retain and extend the culvert For service road alternatives (A2 /B2 /C2), NCDOT
proposed the same size culvert to be constructed the old culvert and some roadway would then
be removed The merger team concurred with this recommendation
Sites 2, 2A (Potecasi Creek)
The existing bridge on US 158 is approximately 119 ft long (Site 2) For Alternatives A
& B NCDOT proposed to replace the existing bridge with dual bridges (approximately 200 ft
long) For Alternative C NCDOT proposed a new location segment (Site 2A) that requires the
construction of dual bridges (approximately 200 ft long) south of the existing bridge location
During the field meeting the group reviewed the wetland just east of Potecasi Creek (WV
300) and felt that the DWQ rating for this wetland site (75 out of 100) should probably be higher
since this was such a unique high quality system As a result the agencies asked NCDOT to
develop an option to completely bridge this wetland At the January 17th meeting NCDOT
proposed a bridge approximately 390 ft long this structure would completely bridge the wetland
but not the floodplam The longer bridge would cost approximately $2 million more than the
shorter bridge this cost is for structures only, and does not include the cost for roadway fill and
pavement There would be a savings of approximately 14 acres of wetlands
During the merger meeting Jeffrey Teague (Roadway) explained that they reduced the
elevation of the roadway at Alternative C s crossing of Potecasi Creek by about 4 ft at beginning
of the bridge and 2 ft at the end of the bridge However there would still be over 20 ft of fill to
2
by
R 2583 January 17 2008 Cpncurrence Meeting Minutes
construct the roadway fill near Potecasi Creek Gary Jordan ( USFWS) asked to get a ballpark
figure for bringing in that much fill Roadway believed it to be a $30 000 — $40 000 difference in
earthwork cost savings (updated costs since the merger meeting are approximately $160 000
savings for earthwork and $70 000 cost for mitigation) Currently the designs for both the 200 ft
and 390 ft bridges have the same grade However if the shorter bridge was chosen that grade
could be lowered by another 2 ft NCDOT noted that the grade change would not result in a
significant wetland savings
Travis Wilson (WRC) recommended the longer bridge in order to save wetlands and
habitat Both USACE and USFWS agreed that if the shorter bridge was chosen they would
probably not concur with this alternative as LEDPA Chris Manley (NEU) agreed that the
wetland system at this location warranted a longer bridge
Ron Sechler said that this is an important anadromous fish stream
The merger team finally concurred with constructing the dual 390 ft bridges at this
location
Sites 3, 41 5, 6 (Mill Branch)
Mill Branch passes under the existing US 158 roadway via four culverts NCDOT was
asked at the Concurrence Point 2 meeting to investigate building dual bridges at this location in
place of the existing culverts NCDOT evaluated this option Due to the current vertical
alignment at this location the construction of dual bridges would result in the raising of the
roadway grade by approximately 8 to 9 ft In turn this would increase the roadway footprint on
the approach to the bridges In addition replacing the culverts with bridges would require the
construction of an onsite detour (an additional cost of $5 million) further increasing wetland
impacts during construction
NCDOT proposed that the culverts be retained and lengthened The team concurred with
retaining and lengthening the existing culverts
Concurrence Point 3 Selection of the Least Environmentally Damaging
Practicable Alternative ( LEDPA) /Preferred Alternative
Charles briefly went through results from the public hearing held on July 19, 2007 Of
the comments received during and after the public hearing over forty responses were in favor of
Alternative C The residents were concerned with impacts to the church, cemetery, and
residences in the area Through verbal comments at the hearing a preference was expressed for
the Mapleton Service Road Option over widening through Mapleton
After briefly stating the pros and cons of each alternative Charles recommended for the
team to keep Alternatives A2 B2 and C2 (Mapleton Service Road Option) and eliminate
Alternatives A B and C He stated that the Mapleton service road would reduce the number of
3
R 2583 January 17 2008 Concurrence Meetmi, Minutes
relocations in this minority community by 15 but there would be a 0 8 acre increase in wetland
impacts and 35 ft increase in stream impacts There would also be an 8 acre increase in farmland
impact The team concurred with this recommendation
Charles then asked if the agencies could all agree to eliminate Alternative B2 Chris
Militscher (EPA) had some questions Was the determination of effects on the Mt Tabor Church
adverse ? The answer was yes It was mentioned that Renee Gledhill Earley (NC State Historic
Preservation Office) would concur with NCDOT s recommendation of Alternative C2 The EPA
agreed to drop Alternative A2 based on avoidance of the historic resource and relocations The
other team members were in agreement EPA also asked if there would be access issues for
farms with Alternatives A2 and C2 Charles Cox informed the team that Alternative A2
wouldn t limit the faun access and that with Alternative C2 the farms had access off of Mt
Tabor Church Road
The team concurred with Alternative C2 as the LEDPA/ preferred alternative
Concurrence Point 4A Avoidance and Minimization
Referring to the merger packet Charles went through the list of known avoidance and
minimization measures that had been utilized thus far on this project
Chris Militscher (EPA) asked about the roadway 3 1 side slopes in wetland areas
Roadway confirmed that the side slopes at wetlands are 3 1 and the median width is 46 ft
Travis Wilson (WRC) mentioned that there will be an in water work moratorium to avoid
anadromous fish impacts in Potecasi Creek This moratorium would also apply to adjacent
wetlands if there is overbank flooding of Potecasi Creek This moratorium wasn t added to the
avoidance/ minimization list because it is already noted on the project commitments sheet (green
sheet) in the Environmental Assessment however, the commitment will be revised to reflect
inclusion of the floodplam
There was discussion of whether the existing US 158 roadbed could be removed for
mitigation credit The NEU group was holding off on an official trip to check mitigation options
until LEDPA was determined Chris Militscher (EPA) reminded the group that other agencies
had requested to do another field visit to assess on site mitigation potential
The team concurred with the following avoidance /minimization measures
Mill Branch — shift roadway south to reduce impacts to wetlands WD WC and WB This is
already part of the current design
Eastern terminus — shift roadway north to minimize impacts to wetland WA This is already
part of the current design
Alternatives B and C — added to avoid impacts to the historic Mount Tabor Baptist Church
and its cemetery
0
Y
L�
R 2583 January 17 2008 Concurrence Meeting Minutes
• Alternatives A2 B2 and C2 — added to minimize impacts to the minority community of
Mapleton as well as the historic Britt Store
• Construct longer bridge across Potecasi Creek in order to minimize impacts to wetland WV
300 (approximately 390 ft)
• A portion of the existing US 158 roadbed may be removed east of the old Potecasi Creek
crossing as mitigation pending further investigation
• Include the removal of the existing culvert dust east of Mapleton (Site SD and WPP) A
portion of the existing US 158 roadbed may also be removed for mitigation purposes pending
further investigation
• 3 1 side slopes in wetland areas
CRC /cc
Attachments — signed concurrence forms
cc Meeting Participants
5
1t t 11 21111, 419 11-1 -52-72,1-b72" WFS HCD DEAUFOPT PAGE 04/04
rSnQ 15 35 ',Ir DOT PDFA y 9127)27289729 inn 475 Dr?
Section 4441NEPA Interagency Agreement
Concurrence Point No 2A Bridging and Alignment Review
Project Tale Widcning of US 158 from the Murfreesboro Bypass to US 13 We ',l
of Winton Hertford County, W73S No 35489, TIP Project R -2583
The project team leas cottein-red with the tollowmg bridging recommendations
Site I Location
1 I Between fist 1305 &
SR 1167
i 7 1
TuSt east of
5R 1334
Sotab o" Sits- 2 oll
New Locition
DATE
Between SR 1174
3
and SR l 175
(SD)
Be wccn SR 1174
4
and SR 117c
Poi east Creek (SB)
Between SR 1174
Potecasr Creek (53)
and SR 1175
Mill Branch (overtlo A)
Between SR 1174
Mill Branch (SA ,than
and SR 1 l 75
Stream
$rndgxng Recommendation
DATE
* Art A D C Retain & Extend Existing 2 @ 12
Trib to Potccasi Creel,
ft x V RCBC
(SD)
• AIL A2, B2 C2 Construct the came on nO'tA
location
Poi east Creek (SB)
a Alt A B Replace with dual 200 ft bndges
Potecasr Creek (53)
• Alt C New du-tl bmdges @ Lp ft
Mill Branch (overtlo A)
• Retain & Extent l L 8 �, R x 3 ft RCDC
Mill Branch (SA ,than
„ Rctain & Extent 1 @ 10 -ft x 4 ft RCBC
crossing)
rvr,
Mill Branch (overflow)
• Rerain & Extent 1 @ 9 ft x 5 P RCBC
Mill Branch (overflow)
+ Retlrn & Extent l (,?� b ft x 3 ft RCBc.
N kXE
NGENCY
DATE
NCDOT
U9ACC
USEPA
r r
USFWS
! )-7 008
NMFS
a r
a
N'CDWQ
17 bg
rvr,
NCD04
7
NCWRC
—-
NCOMl~
NCSHPO
01/17/2008 15 39 NC DOT PDER -) 912522643723 HO 476 PA2
Section 404/NEPA interagency Agreement
Concurrence Point No 2A Bridging and Alignment Review
Protect Title Widening of US 158 from the Murfreesboro Bypass to US 13 West
of Winton, Hertford County, W 3S No 35459, TIP Project R -2583
17he project team has concurred with the following bridging reccanvaendation5
Site
Location
Stream
Hndg)ng recommendation
NCDOT
l� D
• Alt A, B C Retain & Extend aisting 2 @ 12
1
Between SR 1345 &
Tnb to PQtecasi Creel.
ft x 6tt Rcac
SR 1167
(SD)
+ Alt A2 B2 C2 Construct the same on new
NMFS
Al� �AA �--
location
2
Just east of
SR 1334
Potmasa Creek (SB)
• Alt A,13 Replace with dual 200 ft budges
2a
South of Site 2 on
Potecasi Creek (S B)
. Ali C New dual bridges @ ft
NCDMF
New Location
_ t
3
Between SR 1174
and SR 1175
Mill branch (overflow)
• Retain & Extent 1 L 8 5 ft 3 ft RCBC
4
Between Sit 1174
Mill Branbh (SA main
* Retain & Extent 1 @ 10 ft x 4 fl RCBC
and SR 1175
crosRin )
S
Between SR 1174
and SR 1175
Mill Branch (overflow)
• Retain & Extent 1 @ 9 ft x 5 ft RCSC
6
Between SR 1174
and SR 1175
Mill Brinch (overflow)
a Retain & Extent 1 CO 6 ft x 3 ft RCBC
NAME
AGENCY
DATE
NCDOT
l� D
USAGE
USEP,F1
/ f ?
USFWS
j j� among
NMFS
Al� �AA �--
NCDWQ
/ 716
NCDCM
~7
}
NCWRC
'
NCDMF
NCSHPO
01" 17.12me 15 40 NC DOT PDEA 4 9807GS99 NO 477 1;02
Section 4441NEPA Interagency Agreement
Concurrence Point No 2A Bridging and Alignment Review
Pralect Tr le Widening of US 158 from the Murfreesboto Bypass to US 13 West
of Winton Hertford County, WBS No 35489, TIP Protect R -2583
The
pro mA team has concurred
with the following bridgLng
reeams'nendOttonS
site
Location
Stream
Bridging Recommendatson
• Alt A, B C Retain & rxtelid Existing 2 @ 12-
Between SR 1305 &
Trib to Potecaei Creek
ft x Eft RCBC
1
SR 1167
(Sl7)
• Alt Az, B2 C2 Construct the sane on new
lonalibn
2
Just cast of
Potecasi Crcck (0)
Alt A, B Replace with ft bridges
SR 1334
Edl
South o£ 2 on
Potecesi Creek (SB)
• Alt C Now dual budgd fl � '�
cat
A1ear Lpcauan
3
Between SR 1174
Mill Branch (overflow)
• Retain &, Extent 1 S S ft x 3 ft RCI3C
and SR 1175
Betw= SR 1174
Mill Branch (SA main
a Retain & Extent 1 @ 10 fl x 4 fl RCBC
4
and SR 1175
clossvi
Between SR 1174
Mill Branch (ovcrflovu)
• Retain & lrxtont 1 9 R x 5 ft RCBC
and Sit 1175
Between SR 1174
Mill Branch (overflow)
• Retain & Extent 1 (c 6 R x 3 ft RCBC
and SR 1175
11 -f-M E1-+ E1-� -� 2- 7�r -21 r HHFS HOD EE -UFOFT
D1 /1 - / -nnc 1,, :5 PIC DnT PDER Q12527 -)99728
Section 444/NEPA Interagency Agreement
Concurrence Point No 3 Least Environmentally Damaging Practical
Alternative (LEDPA)/ Preferred Alternative
P - (-E A- HO
t10 4 r 1 POD 3
Pro,ject Title Widening of US 158 from the Murfreesboro Bypass to U5 13 West
of Winton Hertford COUnty "S No 3 5489, TIP P'r'oject R -2583
The project team has concurred that the A lternadve U g the LEDPA. for Project R -2583
01/17/2008 15 38 NC DOT PDEA 4 912522643723 110 476 P03
Section 404/NEPA Interagency Agreement
Concurrence Point No 3 Least Environmentally Damaging Practical
Alternative (LEDPA)/ Preferred Alternative
Project Title Widenolg of US 158 fTom the Murfreesboro Bypass to US 13 West
of Winton, Hertford County, WBS No 35489, TIP Project R -2583
The project team has concurred that the Alternative e2- is the LEDPA for Project R -2583
NAME
AGENCY
DATE
NCDDT
USAGE
US EPA
r(
vY
USF S
I
NMFS
'
NCDWQ
d
071n,
NCDC`WI
r
i 17 a C�
NCWRC
1NCDMF
NCSHPO
81/17X2008 15 40 NC DOT PDEA 4 9e076599 NJ Orr
Section 404/NEPA. Interagency Agreement
Coticurrence Point No 3 Least Environmentally Damaging Practical
Alternative (LEDPA )! Preferred Alternative
rn.iect I Widening of US 15S from thy, Murfreesboro Bypass to US 13 West
of Winton, Hertford County, WBS No 35489 TIP Project R -2583
The project team has concurred that the Atteruati've el is the LEDPA for Probed x 2583
-C-..l , =c -u i
64;13
"- 11 -""16 O9 H3 252-72b-8-26
91 1- ?90:—: j5 -5 t iC DIDT PLEA � 5125272eeMe
[AMFS HCD BE -UFOFT
Section 4041NEPA Interagency Agreement
tConeurrence Point No 4A Avoidance and Mimmuzattan
PAGIE 0,21 04
NU 475 PO4
Project Title Widening of US 158 ftom the Mi.ir cesboro Bypass to US 3 West
of Winton Hertford County,'WVBS No 35489 TIP Project R -2583
The project team has concurred with the following avoidance/ minirnuation tCC11DJpU1£S
« Mill Branch �,luft roadwav south to reduce Impacts to wetlands WD, WC, axad WB
e mist tennrnt's — shift roadway north to rninil -We Impacts to wetland WA.
8 Alterrintivet B and C — added to void itnpactq to the Historic Mount Tabor Baptist Church
anti its cemetery
4 Alte-natives A2,132 and C2 �- added to mmimwe impacts to tic minority comrrrW ty Of
Mapleton as well as the liistonc Britt Store
9 Construct longer bridge icro�s Potecfisi Creek in ordcr to �I�1i11tYi1LE. impacts to wellsind WV
300 (approximatc,ly 390 feet)
4 A portion of the existing US 15S rondbcd may be removed east of the old Potecasr Creek
cro4sing aj!, mitigation pending further inve%tigation
« Inrlude the reiroval of the existing culvert ilist east of Mapleton (Site SD and Wp?) A
portion c, the existing US 158 roadbed may also be removcA as mitigation pending further
Investigation
« 3 1 side slope, to wetland areas
NAME
AGENCY
DATE
NCDOT
USAGE
USEPA
n
US1~WS
j UDC
NMrS
// Q
,
NCD WQ
NCDCM
(�
.--�
NCWRC
f%-, AGO
NCDMi r
NCSI4PO
h
01 17/2008 15 38 NC DOT PDEA 4 912522643723 HO 476 D04
Section 4041NEPA Interagency Agreement
Concurrence Point No 4A Avoidance and Minimicabon
Project Title Widening of US 158 from the Murfreesboro Bypass to US 13 West
of Winton, Hertford County, WBS No 35489, TIP Project R -2583
The projeci team has concurred with the following avoidance/ minimization techniques
•
Mill Branch — shift roadway south to reduce impacts to wetlands WD, WC, and WB
• East terminus — shift roadway north to minimize impacts to wetland WA
Alteratives B and C -- added to avoid impacts to the Historic Mount Tabor Baptist Church
and its cemetery
• Alternatives A2, B2, and C2 — added to =111atze impacts to the mmonty community of
Mapleton, as well as the historic Britt Store
• Construct longer bridge across Potecasi Creek an order to minimize impacts to wetland NW
300 (approximately 390 feet)
• A portion of the existing US 158 roadbed may be removed east of the old Potecast Creek
crossing as mitigation pending further investigation
• Include the removal of the existing culvert jusl east of Mapleton (Site SD and WPP) A
portion of the existing US 158 roadbed may also be removed as mitigation pending further
investigation
• 3 1 side slopes to wetland areas
NAME
AGENCY
BATE
NCDOT
USACE
USEPA
USFWS
NMFS
f`
NCD'WQ
NCDCM
17 LO g
NCWRC
moo..
NCDMF
NCSHP4
01/17/2008 15 40 NC DOT PDER 4 99070599 NU Orr VU4
Section 404/.NEPA Interagcney Agreement
Concurrence Point No 4A Avoidance and Mimmization
Project Title Widening of US 158 from the Murfreesboro Bypass to US 13 West
of Wuiton, Hertford County, "S No 35459, Tip project R-2583
The project team has concimed with the following avoidance/ miramtzation techniques
o Tkll Br=cb — shift roadway south to reduce impacts to wetlands WIC, WC, and WB
® Fast teruttnus — shaft roadway north to mini nl ?e impacts to wetland WA
9 Alternatives B and C — added to avoid unpActs to the Htstonc Mowt Tabor Baptist Church
and its cemetery
s Altcrnativa A2 B2, and C2 — added to inumTDze impacts to the nunonty colnmumty of
Mapleton as well as the historic Bntt store
Construct longer bridge across Potecas, Creek in order to inintnvze impacts tc wetland WV
300 (approximately 390 feet)
A portion of the exisnug US 158 roadbed may he removed east or the old potccast Creek
crosstng as mttagatioa, pending ftirtlier invewhgetion
$ Include the removal of the extstrng culvert just east of Mapleton (Site SD and "P) A
portion of the existing US 158 roadbed tray also be removed as mitigation pending further
Ynvestigation
* 3 1 side slopes in wetland areas
ti
r- 7Vt —q nN
r
i y
J
OW N-$ 1
AGENCY
NCDCT
USACE
IUS>rPA
USFWS
NMFS
NcnwQ
NCDCM
NCWRC
NCDMF
NCS14po
t7F,)FW )F, F Nn 1HO1 -I q :qNA -1 TNn ISTH HIHIq 'lN
DATE
/ %/-;%4
1117 ( 0%
, 1.gq -68
F,r qT �7,PP7 /77 /TA