HomeMy WebLinkAbout20111075 Ver 1_Approval Letter_20120119K ja NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Edves Perdue Charles Wakild P E Governor Director January 19 2012 Dr Greg Thorpe PhD Manager Project Development and Lnvironmental Analysis North Carolina Department of Transportation 1598 Mail Service Center Raleigh North Carolina 27699 1598 Dee Freeman Secretary Subject 401 Water Quality Certification Pursuant to Section 401 of the Federal Clean Water Act with ADDITIONAL CONDITIONS for Proposed improvements to U S 158 from Murfreesboro Bypass to U S 13 west of Winton in Hertford County State Project No 6 079007T I IP R 2583 NCDWQ Project No 20111075 Dear Di fhorpe Attached hereto is a copy of Certification No WQC003875 issued to The North Carolina Department of Transportation (NCDOT) dated January 19 2012 If we can be of further assistance do not hesitate to contact us Sincerely t( h,irles Wak►ld P E i Dtrectot Attachments cc Bill Biddlecome US Army Corps of Engineers Washington Field Office Jerry Jennings PE Division I Engineer Clay Willis Division I Environmental Officer Chris M►litscher Environmental Protection Agency (electronic copy only) Travis Wilson NC Wildlife Resources Commission (electronic copy only) Cathy Brittmbham Division of Coastal Mana&ement Garcy Ward NCDWQ Washington Rc&ional Office File Copy Transportation Permitting Unit 1650 Mail Service Center Raleigh North Carolina 276991650 Location 512 N Salisbury Street Raleigh North Carolina 27604 Phone 91M07 63001 FAX 919-807 -6494 Internet http Uportal ncdenrorgtwebhvq An Equal Opportunity 1 Affirmative Action Employer NorthCai olina Naturally 401 Water Quality Certification Put suant to Section 401 of the Federal Clezn Water Act with ADDI1 ZONAL CONDITIONS THiS CERTIFICATION is issued in conformity with the redunements of Section 401 Public Laws 92 500 and 95 217 of the United Stites and subject to the North Carolina Division of Water Quality (NCDWQ) Regulations in 15 NCAC 2H 0500 This ceitification authorizes the NCDOT to impact 5 26 acres ofjurisdictional wetlands and 2 054 linear feet of jurisdictional streams in Hertford County The project shall be constructed pursuant to the application dated received December 9 2011 The authorized impacts aie as described below Stream Impacts in the Chowan Rivet Basin Site Station Permanent 1111! to Intel mittent Stream (linear ft) Temporary y Fill to Intermittent Stream (linear ft) Permanent Fill in Perennial Stream (linear ft) Temporary Fill in Perennial Stream (lineal ft) Total Stt cam Impact (linear ft) Permanent Stream impacts Requiring Mitigation (linear ft 1 L•23+00 i L- 23 +00 60 34 94 0 2 L 146 +94 TO 154 +23 oil O 1 1 230 20 250 230 3 Lr 172 +45 TO 176 +66 114 10 124 0 5 L- 185 +51 TO 1914 97 175 20 195 175 6 L-209+39 Riparian 001 97 10 107 0 7 Lr 2181.25 TO 221 F76 240 L- 185 +51 TO 191 +97 Riparian 012 240 0 7 G 218 +25 rO 221 +76 028 018 378 26 404 378 8 L- 230+30 190 4 041 041 194 0 9 L- 237+05 TO 241 +50 130 005 0 62 130 0 16 1.349+96 Riparian 0 05 18 10 28 0 16 Lr 351 +58 12 1, 278+27 72 18 90 0 16 L 352 +44 002 001 70 20 90 0 17 L 360.110 58 50 001 001 108 0 TOTAL 1 618 1;4 1 214 168 2054 783 Total Stream Impact for Project 2 054 linear feet Wetland Impacts in the Chowan River Basin Site Station Wetland T Type Permanent Fill (ac) ) Temporary F11 ac ( ) Excavation (ac) ) Mechanized Clearing (ac) Hand Clearing (ac) Total Wetland Impact (ac) Impacts Requiring Mitigation ( -Ic) i L- 23 +00 Ripai Ian 008 001 002 oil O 1 1 2 lr 146-194 10 154 +23 Ri ai ian 125 045 170 1 70 3 L- 172 +45 1 O 176+66 Riparian 038 Oil 005 054 049 4 L- 177 +35 10 179 +36 Riparian 001 009 0 15 002 027 025 5 L- 185 +51 TO 191 +97 Riparian 012 006 010 028 018 9 lr 237 +05 10 241 +50 Ripai ian 037 004 041 041 10 Lr 241 +66 TO 244 +75 Riparan 001 005 0 62 068 006 11 1- 255+75 Riparian 0 05 0 02 007 007 12 1, 278+27 Ri at ian O U 1 0 01 002 001 13 1, 283 +40 Riparian 001 001 001 14 1,291+25 Riparian 003 001 004 004 15 1- 337 +75 10 340100 Riparian 008 012 020 020 16 1-352+44 Riparian 067 067 067 16 Ir 354 +21 Riparian 022 022 022 17 1-360+10 Ri aiian 001 001 002 004 002 TOTAL 297 000 067 1 080 082 526 444 Total Wetland Impact for Project 5 26 acres The application pi ovides adequate assurance that the dischaigt, of fill m iterial into the waters of the Chowan River Basin in conjunction with the proposed development will not result in a violation of applicable Water Quality Standards and dischaige guidelines fhetefore the State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301 302 303 306 307 of PL 92 500 and PL 95 217 if conducted in accordance with the application and conditions hereinafter set forth Phis approval is only valid for (lie pu►pose and design that you submitted in you► application dated received December 9 2011 Should your project change you are required to notify the NCDWQ and submit a new application If the propei ty is sold the new owner must be given a copy of this Certification and approval letter and is thereby responsible fo► complymg with all the conditions If any additional wetland impacts or stream impacts foi this project (now or in the future) exceed one acre o► 150 linear feet iespectively additional compensatory mitigation may be required as described in 15A NCAC 2H 0506 (h) (6) and (7) for this approval to remain valid you are required to comply with all the conditions listed below In addition � ou should obtain all othei federal state or local permits before proceeding with your project including (but not limited to) Sediment and Erosion conti of Coastal Stormwater Non discharge and Water Supply watershed regul- itions This Certification shall expire on the same day as the expiration date of the corresponding Corps of EnLineers Permit Conditions of Certification I The NCDOT Division Environmental Officer or Environmental Assistant will conduct a pre construction meeting with all appropriate staff to ensure that the project supervisor and essential staff understand the potential issues with stream and pipe alignment at the permitted sites NCDWQ staff shall be invited to the pre construction meeting 2 Compensatory Mite ation Compensatory mitigation for 783 linear feet of impact to streams is required We understand that you have chosen to pet form compensatory mitigation for impacts to streams through the North Carolina Ecosystem Enhancement Program (EEP) and that the EEP has agreed to implement the mitigation for the pi oject EEP has indicated in a letter dated Febi uary 15 2011 that they will assume responsibility for satisfying the federal Clean Water Act compensatory mitigation requirements for the above referenced project in accordance with the North Carolina Department of Environment and Natural Resources Ecosystem Enhancement Program In Lieu Fee Instrument signed July 28 2010 b Compensatory mitigation for impacts to 4 44 acres of riparian wetlands is required We understand that you have chosen to perform compensatory mitigation for impacts to wetlands through the North Carolina Ecosystem Enhancement Program (EEP) and that the EEP has agreed to implement the mitigation for the project EEP has indicated in a letter dated February 15 2011 that they will assume responsibility for satisfying the federal Clean Water Act compensatory mitigation requirements for the above referenced project in accordance with the North Carolina Department of Environment and Natural Resources Ecosystem Enhancement Program In Lieu I ce Instrument signed July 28 2010 The permittee will need to adhere to all appropriate in water work motatona (including the use of pile driving or vibration techniques) prescribed by the National Marine Fisheries Service and the North Carolina Division of Marine Fisheries No in water work is permitted between February 15 and June 30 of any year without prior approval from the NC Division of Water Quality the National Marine fisheries Service and the North Carolina Division of M-irine Fisheries In addition the perm►ttee shall conform to the NCDOT policy entitled Stream Ciosstng Guidelines for Anadromous %7Slr Passage (dated May 12 1997) at all times 4 The post construction removal of any temporary bridge structures must return the project site to its preconstruction contours and elevations The impacted areas shall be revegetated with appropriate native species Bridge deck drains shall not discharge directly into the stream Stormwater shall be directed across the bridge and pre treated through site appropriate means (grassed swales preformed scour holes vegetated buffers etc) before enteting the stream Please refer to the most current version of Stoi inm atei Bert Management Y/ acticev 6 Bridge piles and bents shall be constructed using driven piles (hammer or vibratory) or drilled shaft construction methods More specifically Jetting of other methods of pile dtivmg are prohibited without pilot written approvll from NCDWQ first 7 No drill slurry orwatei that has been in contact with uncured concrete shall be allowed to enter surface waters This water shall be captured treated and disposed of properly 8 All pile driving or drilhn& activities shall be enclosed in turbidity curtains unless otherwise approved by NCDWQ in this certification 9 1 urbidity curtains shall be used to isolate all work areas from the stream at Potec-is► Creek including pile or casement installation placement of riprap excavation or filling Strict adherence to the Construction and Maintenance Best Management Practices will be required I0 All bridge con struction shall be performed from the existing bridge temporary work bridges temporary causeways or floating of sunken barges If work conditions require barges they shall be floated into position 'ind then sunk Fhe barges shall not be sunk and then dragged into position Undw no circumstances should barges be dragged along the bottom of the surface water 1 I Unies s otherwise approved in this certification placement of culverts and other structures in opLn waters and streams shall be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches to allow low flow passage of water and aquatic life Design and placement of culverts and other structures including tt mporary erosion control measures shall not be conducted in a manner that may result in dis equilibrium of wetlands or streambeds or banks adjacent to or upstream and downstream of the above structures The applicant is required to provide evidence that the equilibrium is being maintained if requested in writing by NCDWQ If this condition is unable to be metdue to bedrock or other limiting features encountered during construction please contact NCDWQ for guidance on how to proceed and to determine whether or not a pen-nit modification will be required 12 if multiple pipes or barrels are required they shall be desq ned to manic natural stream cross section as closely as possible including pipes or barrels at flood plain elevation and /or sills where appropnatt, Widening the stream channel should be avoided Stream channel widening at the inlet of outlet end of structures typically decreases water velocity causing sediment deposition that requires increased maintenance and disrupts aquatic life passage 13 Pipes and culverts used exclusively to maintain equilibrium in wetlands where aquatic life passage is not a concern shall not be buried These pipes shall be installed at natural ground elevation 14 Riprap shall not be placed in the active thalweg channel or placed in the streambed in a manner that precludes aquatic life passage Bioengineering boulders or structures should be properly designed sized and installed 15 The strea in channel shall be excavated no deeper than the natural bed material of the stream to the maximum extent practicable Efforts must be made to minimize impacts to the stream banks as v ell as to vegetation responsible for maintaining the stream bank stability 16 With the c xception of Creeping Red Fescue (Fcstuca i ubi a) tall fescue shall not be used in the establishment of temporary or permanent groundcover within riparian areas For the establishment of permanent herbaceous cover erosion control matting shalt be used in conjunction with an appropriate native seed mix on disturbed soils within the riparian area and on disturbed steep slopes with the follo\N ing exception Frosion control matting is not necessary if the area is contained by per imetei erosion control devices such as silt fence temporary sediment ditches basins etc Matting should be secured in place with staples stakes or wherever possible live stakes of native trees Erosion control matting placed in riparian areas shall not contain a nylon mesh grid which can impinge and Lntrap small animals For the establishment of temporary groundcover within riparian areas hydroseeding along with wood or cellulose based hydro mulch applied from a fertilizer and limestone free tank is allowable at the appropriate rate in conjunction with the erosion control measures Discharging hydroseed mixtures and wood or cellulose mulch into surface N%aterti ni prohibited Rip man art, is a►e detmtd as a distarnct, 25 feet landward from top of stre-im bank General Conditions 17 The outside buf fer wetland or water bound -irk located within the construction corridor approved by this authorization shall be cleat ly marked by highly visible fencing prior to any land d►sturbin& activities impacts to areas within the fencing, are prohibited unless otherwise authorized by this certification 18 If concrete is a sed durinb construction a dry work area shall be maintained to prevent direct contact between curing concrete and stream water Water that inadvertently contacts uncured concrete shall not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills 19 Durm g the construction of the project no stagm& of equipment of any kind is permitted in waters of the U S or protected riparian buMrs 20 The dime nsion pattern and profile of the stream above and below the crossing shall not be mod►ft,d Disturbed floodplams and streams shall be restored to natural geomorphic conditions 21 No rock sand or other mates ials shall bt, dredgt,d from the stream channel except where authorized by this certification 22 The use of rip rap above the Noi trial I sigh Water Mark shalt be minimized Any rip rap placed for stream stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life passage 23 1 he Pe rmittee shall ensure that the final design drawings adhere to the permit and to the permit drawings submitted for approval 24 All work in or adjacent to stream waters shall be conducted in a dry work area Approved BMP measures from the most currt nt version of NCDOT Construction and Maintenance Activities manual such as sandbags rock berms cofferdams and other diversion structures shall be used to prevent excavation in flowing water 25 Heav y equipment shall be operated from the banks rather than in the stream channel in order to minimize sedimentation and reduce the introduction of other pollutants into the stream 26 All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels lubricants hydraulic fluids o► other toxic m-nterrals 27 D►schar gm& hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited 28 Sedi ment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by this Certification 29 All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3 1 unless otherwise authorized by this certification 30 Native r►paiian vegetation must be reestablished in the riparian areas within the construction limits of the project by the end of the growmg season following completion of constriction 31 There shall be no excava tion from or wastt, disposal into jurisdictional wetlands on waters associated with this permit without appropriate modification Should waste or borrow sites or access roads to waste o► borrow sites be located in wetlands or streams compensatory mitigation will be required since that is a direct impact from road construction activities 32 Etosion and sediment control practicu.s must be in full compliance with all specifications t,overning the proper design installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards a The erosion and sediment control measures for the project must be designed installed operated and maintained in accordance with the most recent veision of the Noah Carolina Scdnmcnt and frovion Conn of Planning and Design Manual b The design installation operation and maintenance of the sediment and erosion contiol measures must be such that they equal or exceed the requirements specified in the most recent version of the Not th Cat olina Sediment and Et avian Control Manual The devices shall be maintained on all construction sites borrow sites and waste pile (spoil) projects including contractor owned or leased borrow pits associated with the project c For borrow pit sites the erosion and sediment control measures must be designed installed operated and maintained in accordance with the most recent version of the Noith Carolina Surface Mining Manual d The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act 33 1 he peimtttee a nd its authorized agents shall conduct its activities in a manner consistent with State water quality standards (including any requnements resulting from compliance with §303(d) of the Clean Water Act) and any other appropriate requirements of State and Federal law If NCDWQ determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is bemg violated or that fuither conditions alc necessary to assure compliance NCDWQ may reevalu-ite and modify this certification 34 A cop y of this Water Quality Certification shall be maintained on the construction sih, at all tires in addition the Water Quality Certification and all subsequent modifications if any shall be maintained with the Division Engineer and the on site project managet 35 The Pe r►n►ttee shall report any violations of this certification to the Division of Water Quality within 24 hours of discovery 36 The issua nce of this certification does not exempt the Permittee from complying with any and all statutes rules regulations or ordinances that may be imposed by other government agencies (i a local state and federal) having jurisdiction mcludmg but not limited to applrcablc. buffer rules stormwater management rules soil erosion and sedimentation control requirements etc 37 Upon co mplet►on of the project (including any impacts at associated borrow or waste sites) the NCDOT Division Engineer shall complete and return the enclosed Certification of Completion Form to notify NCDWQ when a]1 work included in the 401 Certification has been completed Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and /or civil penalties This Certification shall become null and void unless the above conditions are made conditions of the Federal 404 and/or Coastal Area Management Act Perin it 'I his Certification shall expire upon the expiration of the 404 or CAMA permit If you wish to contest any statement in the attached Certification you must file a petition for an administrative hearing You may obtain the petition form from the office of Administrative hearings You must file the petition with the office of Administrative Hearings within sixty (60) days of receipt of this notice A petition is considered filed when it is received in the office of Administrative Hearings during normal office hours The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8 00am and 5 00pm except for official state holidays The original and one(]) copy of the petition must be filed with the Office of Administrative Hearings The petition may be faxed provided the original and one copy of the document is received by the Office of Administrative Hearings within five (5) business days following the faxed transmission The mailing address for the Office of Admmistiat►ve Hearmgs is Office of Administrative Hearings 6714 Mail Servicc. Center Raleigh NC 27699 6714 Telephone (919) 733 2698 Facsimile (919) 733 3478 A copy of the petition must also be sei ved on D>NR as follows Ms Mary Penny 'I hompson General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh NC 27699 1601 This the 19th day of January 2012 DIVISION OF WA FER QUALITY 9-1�-ZY- Charles Wakild P F k-0y Director WQC No 003875 .,a...kv X NC®ENR Nor1h Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild P E Governor Director NCDWQ Project No County Applicant Project Name Date of Issuance of 401 Water Quality Certification Dee Freeman Secretary Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules and any subsequent modifications the applicant is required to return this certificate to the 401 Transportation Permitting Unit North Carolina Division of Water Quality 1650 Mail Service Center Raleigh NC 27699 1650 This form may be returned to NCDWQ by the applic-int the applicant s authorized agent of the project engineer It is not necessary to send certificates from all of these Applicant s Certification I hereby state that to the best of my abilities due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules the approved plans and specifications and other supporting materials Signature Date Agent s Certification 1 hereby state that to the best of my abilities due care and dilif ence w ,ts used in the observation of the construction such that the construction was observed to be built within subst int►il compliance and intent of the 401 Water Quality Certific ition and Buffer Rules the approved plans and specifications and other supports ib mater ials Signature Date Engineer s Certification Partial Final I as a duly registered Professional Engineer in the State of North Carolina having been authorized to observe (periodically weekly full time) the construction of the project for the Permittee hereby state that to the best of my abilities due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules the approved plans and specifications and other supporting mater ials Signature _ Re6istiation No Date Transportation Permitting Unit 1650 Mad Service Center Raleigh North Carolina 27699 1650 Location 512 N Salisbury Street Raleigh North Carolina 27604 Phone 919 807 63001 FAX 919-807 -6494 Internet htto !!portal ncdenr orglwebAvq An Equal Opportunity 1 Affirmative Action Employer NorthCarolina Vatlfi"alllf