Loading...
HomeMy WebLinkAbout20050142 Ver 2_Certification of Completion_20120113J Certification of Completion J4� �Fjy of � 3 , ll 'S DWQ Project No.: �(�Q� —d��{a �/� County: (/✓A�� �glFp_ 1� Applicant: A LF-XAN1J<�,e- I t4yF-S77nM-r 6iZovP Project Name: A temQD 3 ' lc FLO( , %Z-Ate.JGt[1 A.14L Date of Issuance of Certification or Authorization: I /oe> Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699 -1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Agent's Certification used in the observation of the compliance and intent of the 401 and other supporting materials. Signature: Date: ' hereby state that, to the best of my abilities, due care and diligence was construction such that the construction was observed to be built within substantial Water Quality Certification and Buffer Rules, the approved plans and specifications, Date: If this project was designed by a Certified Professional I, J(yJArV94,,-J t-t-A as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permiee hereby state that to the best of my abilities, due care and diligence was used in the observation of the construction such �*atlffibTfts ction was observed to be built within substantial complian a and intent of the 401 Water Quality !C@nr9��}'�t}�ffer Rules, the approved plans and specifications, an er su o materials. Z�•��r�SS�p 9 Signature: Registration No. o Bate 4 e A G • e j A�p �Op`•e°�a+ �1 V ,1 AI A V \\ JOHN A. EDWARDS & COMPANY - TRANSMITTAL TO: 401 Oversight/Express Permitting Unit, NCDWQ FROM: Jon Callahan, PE, PLS 14 f7 DATE: January 12, 2012 SA'''�sT�R Z RE: Certificate of Completion rFRB%cH It was recently discovered that the COC had not been returned for the attached project. During construction in 2008, we did make periodical observations of the project and it was installed in substantial compliance with the 401 permit. Attached is a copy of the original authorization and COC. Thanks, Jon Callahan 333 Wadc Avenue Telephone: 919 -828 -4428 Post Office Box 10422 Fax: 919- 828 -4711 Raleigh, North Carolina 27605 F.-Mail: info @jaeco corn