HomeMy WebLinkAbout20111007 Ver 1_More Info Received_20110119W-i
STATE OF NORTH CAROLINA
AV
tiiy�s'C.4G6
DEPARTMENT OF TRANSPORTATION ���'i�ti
BEVERLY EAVES PERDUE
GOVERNOR
January 12 2012
Ms Amy Euhss
NC DENR Division of Water Quality
585 Waughtown Street
Winston Salem, NC 27107
Mr Andrew Williams
US Army Corps of Engineers
6508 Falls of the Neuse Suite 120
Raleigh, NC 27615 -6814
(Two Copies)
Subject Guilford County Pepper Road (SR 2026) 0 3 miles south of Haw River Rd
Project Number # 7B 204111
To Whom It May Concern
EUGENE A CONTI, JR
SECRETARY
Attached is the requested additional info related to the above project Please call me at 336 256 -2063 if you
have any questions
Sincerely
Mr J M Mills PE
Division Engineer Division 7
Enclosures
CC Jeremy Warren, Bridge Maintenance NCDOT
Barry Harrington, NCDOT
Paul Ingram, NCDOT
NC DENR DWQ Wetlands/401 unit (Six Copies)
01
STATE OF NORTH CAROLINA
DEPARTWENT OF TRANSPORTATION
BEVERLY EAVES PERDUE
GovERNOR
f
January 6 2012
Ms Coleen H Sullins
NCDENR, Director
585 Waughtown St
Winston Salem N C 27107
EUGENE A CONTI JR
SECRETARY
Subject Proposed replacement of two deficient pipes with a single aluminum box culvert
on SR 2026 (Pepper Road) in Guilford County State Project No 7B 204111 DWQ Project
No 2011 1007
Dear Ms Sullins
This letter is in response to your letter of December 19, 2011 in which you requested necessary
information regarding the permit application for the subject pipe replacement
Bridge Maintenance Engineer Jeremy Warren and Division Environmental Officer Jerry Parker
met with Ms Amy Euliss on site and the following was discussed and agreed upon
1 A floodplain bench with a seal will be placed covering half of the width of the
structure on inlet end
2 A Seal will be placed covering half of the width of the structure with no floodplain
bench on the outlet end due to the fire intake
3 A small rock ladder will be placed at the outlet end of the structure to prevent further
sediment loss
4 The fire intake will be noted on the plan
P 0 Box 14996 Greensboro NC 27415 -4996 Telephone No (336) 334 -3192 Fax No (336) 334 -3637
I hope this information is sufficient to proceed with the review of the permit application If
you have further questions please call Mr Jerry Parker at 336 256 2063
Sincerely
J M Mills P E
Division Engineer
Cc Amy Euliss DWQ
Andy Williams US Army Corp of Engineers
401 Permitting Unit
Jerry Parker DEO Division 7
Jeremy Warren BME Division 7
P 0 Box 14996 Greensboro NC 27415 4996 Telephone No (336) 334 3192 Fax No (336) 334 -3637
NC DOT
BRIDGE MAINT DEPT
EROSION CONTROL SEQUENCE
COUNTY GUILFORD
PIPE NO P107
SR No 2026
Br No P107
PROJECT No 713 204111
Location 0 3mi south of Sr#2028 Haw River Rd East Long -80 1 -31 6Lat36 10-47
DESCRIPTION REMOVAL of EXISTING CM PIPE 2(�D 142 x 87 x 80 LONG
and REPLACE with ALUMINUM BOX CULVERT STRUCTURE 1 @ 303 x 89 x81
Note
All Erosion Control devices & proper Installation plus maintenance of erosion control will be performed
by using - NCDOT Best Management Practices for Construction and Maintenance Activites Manual
.J J....w.•�-www•
1 Using Aquabags or ABC or other less intrusive oeviues cunsaruca —put vs— ua••— �F a— ��--•• •�
of work area
2 Pump live stream around work area
3 Excavate and remove existing pipes excavate to proper grade
4 Pump water from excavation into sift bag
5 Install #57 stone to the proper grade Install silt fence as needed
6 Construct Aluminum Box Structure -30 3 V x 8 9'T x 81 L w /10 to15 L x1 T seal in both ends of structure
7 Backfill to proper grade - install silt fence as needed
8 Construct a rock bench at inlet end of culvert,approximately 15 to 20 length with Classll np rap
9 Construct a rock bench if possible At outlet end of culvert approximately 15 to 20 with Classll np rap
10 Install a rock ladder on the downstream end using Classll np rap
11 Remove impervious dams on upstream and downstream
12 Seed and mulch areas as needed
APPROXIMATE PROJECT START DATE Spnng /summer 2012
PREPARED BY
APPROVAL
TRANSPORTATION SUPERVISOR III -
DIV BRIDGE ENG
DATE
DATE �-
DATE
SEQUENCEI
COUNTY GUILFORD
PIPE NO P107
SR No 2026
Br No P107
PROJECT No 76 204111
1 Using Aquabags or ABC or other less intrusive devices construct impervious dams up and downstream
of work area
2 Pump live stream around work area
0
SEQUENCE2
COUNTY GUILFORD
PIPE NO P107
S R No 2026
Br No P107
PROJECT No 7B 204111
3 Excavate and remove existing pipes excavate to proper grade
4 Pump water from excavation into silt bag
Install #57 stone to the proper grade Install silt fence as needed
E U--
SEQUENCE3
COUNTY GUILFORD
PIPE NO P107
S R No 2026 PEPPER RD
6 Construct Aluminum Box Structure -30 3'W/ x 8 9 T x 81 L W10 to15 L x1'T seal in both ends of structure
7 Backfill to proper grade Install silt fence as needed
8 Construct a rock bench at inlet end of culvert,approximately 15 to 20 length with Classli np rap
9 Construct a rock bench if possible At outlet end of culvert approximately 15 to 20 with Classll np rap
10 Install a rock ladder on the downstream end using Classll np rap
Siavl
SEQUENCE 4
COUNTY GUILFORD
PIPE NO P107
SIR No 2026 PEPPER RD
11 Remove impervious dams on upstream and downstream
12 Seed and mulch areas as needed
k,