Loading...
HomeMy WebLinkAbout20070698 Ver 1_More Info Letter_20070502a~~~ ~ A rc~PG ~ q 9~ ? : ..,~ i3 _ . -~.~ .,C ,.: Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality May 2, 2007 Iredell County DWQ Project #07-0698 IVIr. Ernest Spevak 109 Forum Dr. Mooresville, NC 28117 Subject: Shoreline Stabilization, Lot 118, Lake Norman Dear Mr. Spevak: The Division of Water Quality (DWQ) received your 401 Water Quality Certification application for the subject project on Apri127, 2007. Mr. Alan Johnson of this Office has and reviewed your application and based on his review of the following information is needed by this office in order to issue the 401 Certification: a) Vicinity map (street map can be found at Mapquest.com). b) Topographic Map (can be found at Topozone.com). c) A couple of photos of the shoreline. d) Amount of impact above and below full pond. If the top of bank is greater than five feet above the lake bed a more detail diagram of the impact may be required. Pursuant to 15A NCAC 2H .0507(h), please be advised that this project will be placed on hold until such time as the requested information has been received. In addition, this office is requesting that the Army Corps of Engineers withhold processing the 404 permit until the requested information is provided. If you have any questions, please contact Mr. Alan Johnson at (704) 663-1699 or Ms. Cyndi Karoly in Raleigh at (919) 733-9721. Sincerely, cc: Corps of Engineers-Asheville Off ce Ian McMillan -Wetlands Unit Central Files Robert B. Krebs Surface Water Protection Regional Supervisor NorthCarolina JV~rti~rally North Carolina Division of Water Quality 610 East Center Ave., Suite 301 Mooresville, NC 28115 Phone (704) 663-1699 Customer Service Internet: h2o.enr.state.nc.us FAX (704) 663-6040 1-877-623-6748 An Equal OpportunitylAffirmative Action Employer - 50% Recycled/10% Post Consumer Paper