Loading...
HomeMy WebLinkAbout20110381 Ver 1_Certification of Completion_20111130MATE Michael F Easley Governor 9oG William G Ross Jr Secretary North Carolina Department of Environment and Natural Resources r Alan W Klimek P E Director > -H Division of Water Quality o -c DWQ Project No 20110383 County Cherokee Applicant NCDOT Project Name US 19 Business (Valley River Avenue) Murphy Date of Issuance of 401 Water Quality Certification —May 4, 2011 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules and any subsequent modifications the applicant is required to return this certificate to the 401/Wetlands Unit North Carolina Division of Water Quality 1650 Mail Service Center Raleigh NC 27699 1650 This form may be returned to DWQ by the applicant the applicant s authorized agent or the project engineer It is not necessary to send certificates from all of these Applicant s Certification I Joel B Setzer, P E , hereby state that to the best of my abilities due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Watet Quality Certification and Buffer Rules the approved plans and specifications and other supporting materials Signature Date Agents deIrlification I hereby state that to the best of my abilities due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules the approved plans and specifications and other supporting materials Signature If this project was designed by a Certified Professional I as a duly registered Ptofessional (i e Engineer Landscape Architect Surveyor etc ) in the State of North Carolina having been authorized to observe (periodically weekly full time) the construction of the project for the Permitee hereby state that to the best of my abilities due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules the approved plans and specifications and other supporting materials Signature Registration No Date fli /r ►`71 n n f . r North Carolina Division of Water Quality 401 Wetlands Certification 1161 4,, 1650 Mail Service Center Raleigh NC 27699 1650 (Mailing Address) 2321 Crabtree Blvd Raleigh NC 27604 2260 (Location) 919 733 1786 (phone) 919 733 6893 (fax) http //h2o enr state nc us /ncwetlands/ io gab C