HomeMy WebLinkAbout20090060 Ver 1_Inspection_20111222 NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins Dee Freeman
Governor Director Secretary
December 22, 2011
Jerry Pounds Construction
Mr. Jerry Pounds
Post Office Box 250
Clayton, NC 27528
Subject.-401 Water Quality Certification and
Buffer Authorization Inspection
Sandy Ridge Harbor Marina
DWQ Project # 2009-0060
Neuse River [ NEU08, 27-(96), NSW, SC]
Dear Mr. Pounds:
On December 21, 2011, Anthony Scarbraugh of the Division of Water Quality
(DWQ) inspected the proposed construction of a marina located at 385 Sandy
Ridge Road in Bridgeton, Craven County. This project was inspected for
compliance with the General Water Quality Certification (GC) #3642 and
Authorization Certificate per the Neuse River Buffer Protection Rules (Buffer
Authorization) with Additional Conditions granted on March 4,2009 for
impacts associated with construction of a marina at the subject property.
The GC approved impacts of 0.23 acres of wetlands and 0.47 acres of open
water by shading and the buffer authorization approved 400 square feet of
protected riparian buffers to complete your project as described in your
application received by DWQ on January 15, 2009.
The inspection revealed that the project has not yet been completed. As
such, you will be rescheduled for an inspection at a later date. This office
would like to remind you that you are limited to the impacts proposed in your
application and you must comply with all additional conditions regarding
completing the certification of completion and compliance with GC #3642
and Buffer Authorization.
As a reminder, if you change your project you must notify us and you may be
required to send us a new application. If the property is sold, the new owner
North Carolina Division of Water Quality Internet: www.newaterqualiiy.org
943 Washington Square Mall Phone: 252-946-6481 One
Washington,NC 27889 FAX 252-946-9215 NofthCarohna
An Equal Opportunity/Affirmative Action Employer—50%Recycled110%Post Consumer Paper AIAM711Y
Page 2
Jerry Pounds Construction
Jerry Pounds
DWQ Project# 2009-0060
Craven County
must be given a copy of the Certification and approval letter and is thereby
responsible for complying with all conditions. Upon completion of all work
approved within the 401 WQC, and any subsequent modifications, the
applicant is required to return the enclosed certificate of completion to the
401 Oversight/Express Review Permitting Unit, North Carolina Division of
Water Quality, 1650 Mail Service Center, Raleigh, NC 27699-1650. This
document can also be accessed through the DWQ 401/Wetlands website at
http://h2o.enr.state.nc.us/ncwetiands/index.htm1.
Violations of any condition set forth in the Certification and Additional
Conditions may result in revocation of this Certification and may result in
criminal and/or civil penalties. The authorization to proceed with your
proposed impacts or to conduct impacts to water as depicted in your
application and as authorized by this Certification shall expire upon the
expiration of the 404 or CAMA Permit.
Should you have any questions regarding these matters, please contact
either Anthony Scarbraugh or myself at (252) 946-6481.
Sincerely,
Al Hodge, Regional upervisor
Surface Water Protection Section
Washington Regional Office
Enclosures: Approval Letter
GC 3642
Certificate of Completion
cc: WaRO Files
Doug Huggett, DCM Morehead City
USACE Washington Regulatory Field Office
North Carolina Division of Water Quality Internet: www.newaterr uality.c
943 Washington Square Mall Phone: 252-946-6481 One
Washington,NC 27889 FAX 252-946-9215 North'C/arohna
An Equal Opportunity/Affirmative Action Employer—50%Recycled/10%Post Consumer Paper Naturally
P{.h'K�}6P.4`-0•Yr:J}3Tti•OPP•}}pCµ:.,X}?{�.Y:6{.:.�p,�J-0•trOrt4{rtiitivY+�:}}.K q{.}�}{^}:tiaK-}'.i;rtrh}4:K••C•!.•`-X.hti-.t+rt•})-0{�J.}n.:.p.M-Y7�fWti-i0K:/tii-n�v�:M0.X.66P60K+/NK�^•tri•M+.riC•J:iK•`•
Permit Class � Q6 r
A Permit Number
RENEWAL >$
41-09 r
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources Q
and
Y Coastal Resources Commission D
$ MAYY22015
EN
D
401&8U FER RESOURCE
for PERM) ING
x X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
Excavation and/or filling pursuant to NCGS 113-229
Issued to Jerry Pounds Construction,P.O.Box 250,Clayton,NC 27528-0250
Authorizing development in Craven County at Neuse River, at 385 Sand Ridge Road
Bridgeton as requested in the permittee's letter dated 4/2/15 ;
'f
This permit, issued on May 8- 2015 , is subject to compliance with the application (where consistent
with the permit),all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
x
1 1) This renewal shall be attached to the original Permit No. 41-09, which was issued on 4/6/09, as well as
all subsequent modifications, refinements and renewals, and copies of all documents shall be readily
available on site when Division personnel inspect the project for compliance.
4
2) All conditions and stipulations of the active permit remain in force under this renewal.
z �
NOTE: A permit renewal application processing fee of$100 was received by DCM for this project.
3 %
i. 4AR
This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR and the $
other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission.
date. ;s
¢ f
This permit must be accessible on-site to Department }
3: personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval. t9Braxton C. Davis, Director
Division of Coastal Management t
$ All work must cease when the permit expires on
kThis permit and its conditions are hereby accepted.
September 26,2017
In issuing this permit, the State of North Carolina agrees
x that your project is consistent with the North Carolina Coastal
Management Program. Y
Signature of Permittee
-0•:•hM.,,{-ti=�i+.�•_ti..JS :�=�:-:i-:{_Yi:-.:.yv;+.t.�..}J•i-0-}i.MtiaYnY.{4h..:.}}}•..�;:.; ..,:Y.-..%..��Y-.. _.ti .<•p{-;;->:.r.;_.\:C•Jv%,�_v,...r•.r-0,..`+r;.o-}}{4C-0.7:•h-'C•.-:C2-}i,}C-:•M.>...7YP??t+rh,X•b,,�:•}•