Loading...
HomeMy WebLinkAbout20201982 Ver 1_Pre-Filing Meeting Information_20210202 (2)DWR Pre-Fil ing Meeting Req u est Form ID#*Ve rsion * Re gional Office * Re v ie we r List * Contact Name * Contact Email Addre ss * Proje ct Name * Proje ct Owne r * Proje ct County * Owne r Addre ss: Is this a transportation proje ct?* Type (s) of approv al sought from the DWR: Doe s this proje ct hav e an e xisting proje ct ID#?* Do you know the name of the staff me mbe r you would like to re que st a me e ting with? Ple ase giv e a brie f proje ct de scription be low.* 20201982 1 Winston-Salem Regional Office - (336) 776-9800 Dave Wanucha Pre-Filing Me eting Reque st submitte d 12/17/2020 James Mason james.mason@threeoaksengineering.com Valley Forge Rd Culvert Replacement at Cates Creek Town of Hillsborough Orange City Hillsborough State / Province / Region NC Postal / Zip Code 27278 Country United States Street Address PO Box 429 Address Line 2 Yes No 401 Water Quality Certification - Regular 401 Water Quality Certification - Express Individual Permit Modification Shoreline Stabilization Yes No Stephanie Goss Please give a couple of dates you are available for a meeting. Ple ase attach the docume ntation you would like to hav e the me e ting about. Signature Submittal Date The Town of Hillsborough is proposing the replacement of the existing culverts on Valley Forge Road at Cates Creek. As part of the replacement, a portion of sanitary sewer line will also have to be slightly relocated. It is anticipated that impacts associated with the project will require Section 404/401 permitting, as well as a riparian buffer authorization. Attached are the draft permit drawings associated with the project. With the new riparian buffer rules, I wanted to get clarification on how the sewer line relocation should be designated. Please let me know if you would like to virtually meet to discuss this project. 12/28/2020 1/4/2021 Valley Forge_Hyd_Buffer_11182020.pdf 1.29MB Valley Forge_Hyd_Permit_11202020.pdf 2.93MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: · This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. · I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. · I also understand that DWR is not required to respond or grant the meeting request. Your project’s thirty-day clock started upon receipt of this application.  You will receive notification regarding meeting location and time if a meeting is necessary.  You will receive notification when the thirty-day clock has expired, and you can submit an application. 12/17/2020