Loading...
HomeMy WebLinkAbout20201982 Ver 1_SAW_2020_01982_Valley Forge_Verification Email_12112020_202102021 Jim Mason From:Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil> Sent:Friday, December 11, 2020 8:10 AM To:Jim Mason Subject:SAW-2020-01982 Valley Gorge Road Culvert Replacement JD Concurrence Good morning Jim,    Reference is made to ORM ID SAW‐2020‐01982; please reference this number on any correspondence regarding this  action.    On December 9, 2020, we received updated information from you requesting the Wilmington District, Regulatory  Division review and concur with the boundaries of an aquatic resource delineation.     We have reviewed the information provided by you concerning the aquatic resources, and by copy of this e‐mail, are  confirming that the aquatic resources delineation has been verified by the Corps to be a sufficiently accurate and  reliable representation of the location and extent of aquatic resources within the identified review area. The location  and extent of  these aquatic resources are shown on the delineation map (or survey), labeled Figure 3 ‐ Valley Forge  Road Culvert Replacement, Jurisdictional Features Map and dated December 2020.      Regulatory Guidance Letter (RGL) 16‐01 https://usace.contentdm.oclc.org/utils/getfile/collection/p16021coll9/id/1256  provides guidance for Jurisdictional Determinations (JD) and states "The Corps generally does not issue a JD of any type  where no JD has been requested".  At this time we are only verifying the delineation.  This delineation may be relied  upon for use in the permit evaluation process, including determining compensatory mitigation.  "This verification does  not address nor include any consideration for geographic jurisdiction on aquatic resources and shall not be interpreted  as such. This delineation verification is not an Approved Jurisdictional Determination (AJD) and is not an appealable  action under the Regulatory Program Administrative Appeal Process (33 CFR Part 331). However, you may request an  AJD, which is an appealable action.     If you wish to receive a Preliminary Jurisdictional Determination (PJD), or an Approved Jurisdictional Determination (AJD)  please respond accordingly, otherwise nothing further is required and we will not provide any additional  documentation.    The delineation included herein has been conducted to identify the location and extent of the aquatic resource  boundaries and/or the jurisdictional status of aquatic resources for purposes of the Clean Water Act for the particular  site identified in this request. This delineation may not be valid for the Wetland Conservation Provisions of the Food  Security Act of 1985, as amended. If you or your tenant are USDA program participants, or anticipate participation in  USDA programs, you should discuss the applicability of a certified wetland determination with the local USDA service  center, prior to starting work.    Best Regards,  Sam    Samantha Dailey   Regulatory Project Manager  U.S. Army Corps of Engineers  Regulatory Division  3331 Heritage Trade Drive, Suite 105  Wake Forest, NC 27587  2 (919) 554‐4884, Ext. 22  mailto:Samantha.j.dailey@usace.army.mil