Loading...
HomeMy WebLinkAbout20201579 Ver 1_ePCN Application_20210129 I I DWR Division of Water Resources Pre-Construction Notification (PCN) Form October 26,2020 Ver 3.3 Initial Review Has this project met the requirements for acceptance in to the review process?* 6 Yes ✓ No Is this project a public transportation project?* 0 Yes r No Change only if needed. BIMS#Assigned* Version#* 20201579 1 Is a payment required for this project?* ✓ No payment required 6 Fee received Reviewing Office* ✓ Fee needed-send electronic notification Asheville Regional Office-(828)296-4500 Select Project Reviewer* Kevin Mitchell:eads\rkmitchell Information for Initial Review 1a.Name of project: Macon County-Bridge 181 1a.Who is the Primary Contact?* Patrick J.Breedlove 1b.Primary Contact Email:* 1c.Primary Contact Phone:* pjbreedlove@ncdot.gov (828)508-7397 Date Submitted 1/29/2021 Nearest Body of Water Tellico Creek Basin Little Tennessee Water Classification Class C;Tr. Site Coordinates Latitude: Longitude: 35.27614 -83.53778 Pre-Filing Meeting Information ID# Version 20201579 Version 1 Pre-fling Meeting or Request Date* 2/26/2021 Attach documentation of Pre-Filing Meeting Request here:* Macon County-B181-Pre Filing.pdf 47.57KB A. Processing Information C^U County(or Counties)where the project is located: Macon Is this a NCDMS Project ✓ Yes r No Is this project a public transportation project?* ✓ Yes r No Is this a NCDOT Project?* ✓ Yes r No (NCDOT only)T.I.P.or state project number: WBS#(2) 17BP.14.R.207 1a.Type(s)of approval sought from the Corps: fJ Section 404 Permit(wetlands,streams and waters,Clean Water Act) r Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act) Has this PCN previously been submitted?* ✓ Yes r No lb.What type(s)of permit(s)do you wish to seek authorization? fJ Nationwide Permit(NWP) r Regional General Permit(RGP) r Standard(IP) 1c.Has the NWP or GP number been verified by the Corps? C Yes rNo Nationwide Permit(NWP)Number: 03-Maintenance NWP Numbers(for multiple NWPS): Id.Type(s)of approval sought from the DWR: 17 401 Water Quality Certification-Regular r 401 Water Quality Certification-Express r Non-404 Jurisdictional General Permit r Riparian Buffer Authorization r Individual Permit le.Is this notification solely for the record because written approval is not required? * For the record only for DWR 401 Certification: r Yes r No For the record only for Corps Permit: r Yes r No If.Is this an after-the-fact permit application?* ✓ Yes rNo 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? CYes rNo 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? ✓ Yes rNo Acceptance Letter Attachment lh.Is the project located in any of NC's twenty coastal counties? CYes rNo 1j.Is the project located in a designated trout watershed? r Yes r No B. Applicant Information Id.Who is applying for the permit? 7 Owner r Applicant(other than owner) le.Is there an Agent/Consultant for this project?* ✓ Yes r No 2.Owner Information 2a.Name(s)on recorded deed: NCDOT-Division 14 2b.Deed book and page no.: 2c.Responsible party: 2d.Address Street Address 253 Webster Road Address Line 2 aty State/Rovince/Region Sylva North Carolina Postal/Zip Corte Country 28779 United States 2e.Telephone Number: 2f.Fax Number: (828)508-7397 2g.Email Address:* pjbreedlove@ncdot.gov ....__......... C. Project Information and Prior Project History 1. Project Information lb.Subdivision name: (f appropriate) 1c.Nearest municipality I town: Franklin 2. Project Identification 2a.Property Identification Number: 2b.Property size: 2c.Project Address Street Address Address Line 2 Qly State/Bovine/Ftgion Postal/Zip Code Country 3.Surface Waters 3a.Name of the nearest body of water to proposed project:* Tellico Creek 3b.Water Resources Classification of nearest receiving water:* Class C;Tr. 3c. What river basin(s)is your project located in?* Little Tennessee 3d.Please provide the 12-digit HUC in which the project is located. 060102020404 4. Project Description and History 4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Existing land use is a timber bridge on I-beams on a two lane secondary road.Projects is located in a rural residential area with maned areas adjacent to project area with agriculture fields nearby. 4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past?* r Yes t No r Unknown 4d.Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site.(for DWR) Macon County-B181-USGS Topo Map.pdf 312KB 4e.Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site.(for DWR) Macon County-B181-NRCS Soil Survey.pdf 596.76KB 4f.List the total estimated acreage of all existing wetlands on the property: 0.00 4g.List the total estimated linear feet of all existing streams on the property: 275 4h.Explain the purpose of the proposed project:* Project is to replace an obsolete and deteriorating timber floor on I-beam bridge unit within the existing disturbed bridge footprint. 4i.Describe the overall project in detail,including indirect impacts and the type of equipment to be used:* NCDOT contractor will install erosion and sediment control measures.NCDOT contractor will remove existing bridge unit,install diversion and place rip-rap,then construct new cored slab bridge unit.An onsite detour will be utilized with staged demolition and staged construction.Bank stabilization materials will be permanently installed as soon as final grading allows. Diversion/Dewatering structure will be removed and temporary impacts restored.The proposed bridge will be constructed utilizing the following equipment:crane,excavator,dump trucks,paving equipment,pumps and hand tools. 4j.Please upload project drawings for the proposed project. Macon County-B181-Permit Plans.pdf 2.95MB 5.Jurisdictional Determinations 5a.Have the wetlands or streams been delineated on the property or proposed impact areas?* ✓ Yes F No 6 Unknown Comments: 5b.If the Corps made a jurisdictional determination,what type of determination was made?* ✓ Preliminary r Approved r Not Verified 6 Unknown r N/A Corps AID Number: 5c.If 5a is yes,who delineated the jurisdictional areas? Name(if known): Agency/Consultant Company: Other: 5d1.Jurisdictional determination upload Macon County-B181-JD(Signed).pdf 254.85KB 6. Future Project Plans 6a.Is this a phased project?* ✓ Yes f No Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary 1a.Where are the impacts associated with your project?(check all that apply): r Wetlands 17 Streams-tributaries r Buffers r Open Waters r Pond Construction 3.Stream Impacts 3a.Reason for impact(?) 3b.lmpact type* 3c.Type of impact* 3d.S.name* 3e.Stream Type* 3f.Type of 3g.S.width* 3h.Impact (?) Jurisdiction* length* S1 Bank Stabilization Permanent Rip Rap Fill Tellico Creek Perennial Both 15 60 Average(feet) (linear feet) S2 Dewatering Temporary Dewatering Tellico Creek Perennial Both 15 75 Average(feet) (linear feet) 3i.Total jurisdictional ditch impact in square feet: 0 3i.Total permanent stream impacts: 3i.Total temporary stream impacts: 60 75 3i.Total stream and ditch impacts: 135 3j.Comments: E. Impact Justification and Mitigation 1.Avoidance and Minimization 1a.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The existing bridge is being replaced with a structure that is adequate for the traffic needs in the same disturbed location.The bridge structure was designed for the minimum size criteria to ensure conveyance of traffic on the secondary road.The staged bridge demolition and construction will reduce temporary impacts. lb.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: The onsite stream(Tellico Creek)will be temporary diverted/dewatered while the excavation and placement of rip-rap occurs.Erosion and Sedimentation control measures will be installed prior to ground disturbance.Both of these measures will aid in the prevention of sediment into downstream habitats. 2. Compensatory Mitigation for Impacts to Waters of the U.S.or Waters of the State 2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State? ✓ Yes ( No 2b.If this project DOES NOT require Compensatory Mitigation,explain why: Bridge will be replaced with a bridge.Compensatory mitigation is not required. F. Stormwater Management and Diffuse Flow Plan (required by DWR) C^U 1. Diffuse Flow Plan la.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ✓ Yes ( No If no,explain why: Project is not located within a N.C.Riparian Buffer Protection Area. 2.Stormwater Management Plan 2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* ( Yes r No Comments: G. Supplementary Information 1. Environmental Documentation la.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land?* ( Yes rNo lb.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina) Environmental Policy Act(NEPAISEPA)?* ( Yes CNo 1c.If you answered"yes"to the above,has the document review been finalized by the State Clearing House?* ✓ Yes ( No Comments:* NCDOT MCDC Attached. 2.Violations(DWR Requirement) 2a.Is the site in violation of DWR Water Quality Certification Rules(15A NCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or Riparian Buffer Rules(15A NCAC 2B.0200)?* ✓ Yes ( No 3. Cumulative Impacts(DWR Requirement) 3a.Will this project result in additional development,which could impact nearby downstream water quality?* ✓ Yes ( No 3b.If you answered"no,"provide a short narrative description. The project is only to replace existing subject bridge and does not increase the capacity of roads in the area.The proposed project is not a road widening or improvement project. 4.Sewage Disposal(DWR Requirement) 4a.Is sewage disposal required by DWR for this project?* ✓ Yes ( No r N/A 5. Endangered Species and Designated Critical Habitat(Corps Requirement) 5a.Will this project occur in or near an area with federally protected species or habitat?* ( Yes rNo 5b.Have you checked with the USFWS concerning Endangered Species Act impacts?* ( Yes rNo 5c.If yes,indicate the USFWS Field Office you have contacted. Asheville 5d.Is another Federal agency involved?* ✓ Yes ( No r Unknown 5e.Is this a DOT project located within Division's 1-8? ✓ Yes ( No 5f.Will you cut any trees in order to conduct the work in waters of the U.S.? ( Yes r No 5g.Does this project involve bridge maintenance or removal? ( Yes r No 5g(1).If yes,have you inspected the bridge for signs of bat use such as staining,guano,bats,etc.? ( Yes r No If you answered"Yes"to 5g(1),did you discover any signs of bat use? ✓ Yes ( No r Unknown 5h.Does this project involve the construction/installation of a wind turbine(s)?* ✓ Yes ( No 5i.Does this project involve(1)blasting,and/or(2)other percussive activities that will be conducted by machines,such as jackhammers,mechanized pile drivers,etc.? ( Yes r No If yes,please provide details to include type of percussive activity,purpose,duration,and specific location of this activity on the property. Macon County-B181-NWP 3 Cover Letter(Final).pdf 39.33KB 5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? U.S.Fish&Wildlife-ECOS-Online Mapper Consultation Documentation Upload 6. Essential Fish Habitat(Corps Requirement) 6a.Will this project occur in or near an area designated as an Essential Fish Habitat?* ✓ Yes ( No 6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NOAA-Essential Fish Habitat 7. Historic or Prehistoric Cultural Resources(Corps Requirement) 7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?* ( Yes rNo 7b.What data sources did you use to determine whether your site would impact historic or archeological resources?* NCDOT Cultural Resources Specialist. 7c.Historic or Prehistoric Information Upload Macon County-B181-Archaeological.pdf 7.18MB Macon County-B181-Architecture Effects.pdf 4.14MB 8. Flood Zone Designation(Corps Requirement) 8a.Will this project occur in a FEMA-designated 100-yearfloodplain?* ( Yes rNo 8b.If yes,explain how project meets FEMArequirements: NCDOT Programmatic Agreement. 8c.What source(s)did you use to make the floodplain determination?* N.C.Flood Maps-Flood Risk Information System. Miscellaneous Comments Miscellaneous attachments not previously requested. Macon County-B181-MCDC(Signed).pdf 375.31KB Macon County-B181-NC Hertiage Program.pdf 3.15MB Macon County-B181-Hydro Report.pdf 3.15MB Macon County-B181-GIS Map.pdf 239.54KB Macon County-B181-SMP(Final).pdf 3.13MB Macon County-B181-Site Photos.pdf 1.03MB Macon County-B181-Bat Assessment Form.pdf 37.4KB Signature 17 By checking the box and signing below,I certify that: • The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief;and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true,accurate,and complete information on this form; • I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the PCN form. Full Name: Patrick Jeremy Breedlove Signature c rr�a%Gray err Date 1/29/2021