January 25, 2021
LETTER OF APPROVAL WITH MODIFICATIONS
SGRM, Inc.
ATTN: Kristin M. Foust, Vice President
1851 S. Main St.
Graham, NC 27253
RE: Project Name: Heritage Glen - Phase 5C
Acres Approved: 2.62 (Originally approved for 2 acres)
Project ID: ALAMA-2021-016
County: Alamance
City: Village of Alamance
Address: Tradition Dr.
River Basin: Cape Fear
Stream Classification: WS-V ; NSW - Jordan Lake Watershed
Submitted By: Green Mountain Engineering, PLLC
Date Received by LQS: January 25, 2021
Plan Type: Revised
Dear Ms. Foust:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable with modifications and hereby issue this letter of Approval with Modifications. The
modifications required for approval are listed on the attached page. This plan approval shall
expire three (3) years following the date of approval, if no land -disturbing activity has been
undertaken, as is required by Title 15A NCAC 413.0129. Because this approval is for a single use
borrow site, the requirements listed as Modifications Required for Approval limit the excavation
or grading to be completed within (1) one year. [G.S. 74-49(7)(0]
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction General Permit. After the form is reviewed and found to be complete,
you will receive a link with payment instructions for the $100 annual permit fee. After the fee is
received, you will receive the COC via email. You MUST obtain the COC prior to commencement
of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please
direct questions about the eNOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul
Clark at Paul.clark@ncdenr.gov. If the owner/operator of this project changes in the future, the
new responsible party is required to apply for his/her own COC.
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
4AMEWinston-Salem Regional Office 1450 Hanes Mdl Road, Suite 3001 Winston-Salem, North Carolina 27103
��a��� 336.776.9800
Letter of Approval with Modifications
SGRM, Inc.
January 25, 2021
Page 2 of 3
Title 15A NCAC 413.0118(a) and the NCG01 permit require that the following documentation be
kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection
to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control plan
is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973
(North Carolina General Statute 113A-51 through 66), this office may require revisions to the
plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local `city or county ordinances or rules
may also apply to this land -disturbing activity. This approval does not supersede any other
permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form
if there is any change in the information included on the form. In addition, it would be helpful if
you notify this office of the proposed starting date for this project. Please notify us if you plan to
have a preconstruction conference. Your cooperation is appreciated.
Sincerely,
Zachary Lentz, EI
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NCG01 Fact Sheet
c: Joseph V. O'Buch, PE of Green Mountain Engineering, PLLC (via email)
WSRO file
Letter of Approval with Modifications
SGRM, Inc.
January 25, 2021
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Heritage Glen - Phase 5C
Project ID: ALAMA-2021-016
County: Alamance
Modifications pursuant to applicable North Carolina General Statutes and -or Regulations:
1. Construction entrances must contain at least 2-3 inch stone and be maintained in a
condition that will prevent tracking or direct flow of mud onto streets. Periodic
topdressing with stone will be necessary. [G.S. 113A-57(3), 15A NCAC 4B .0105]
2. Any off -site borrow and waste required for this project must come from a site with an
approved erosion control plan, a site regulated under the Mining Act of 1971, or a landfill
regulated by the Division of Solid Waste Management. Trash/debris from demolition
activities or generated by any activities on site must be disposed of at a facility regulated
by the Division of Solid Waste Management or per Division of Solid Waste Management
or Division of Water Resources rules and regulations. [15A NCAC 413.0110]
3. Additional measures may be required - The applicant is responsible for the control of
sediment on -site. If the approved erosion and sedimentation control measures prove
insufficient, the applicant must take those additional steps necessary to stop sediment
from leaving this site. [15A NCAC 4B .0115]
Additional Comments:
1. Be advised that any homebuilder other than the financially responsible party would be
required to obtain an independent plan approval, as part of this common plan of
development. [GS 113A-54.1, NCG010000]
2. Be advised the 7/14-day soil stabilization requirements apply to any section of the project
where land -disturbing activities have temporarily or permanently ceased and shall
supersede any less stringent stabilization requirement on the plans. [G.S. 143-215.1]
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities