Loading...
HomeMy WebLinkAbout20110987 Ver 1_Application_20111108 (2)Beverly Eaves Perdue Charles Wakdd P E Dee Freeman Governor Director Secretary January 4 2012 Craven County DWQ Project No 20110987 Bridge 19 over Kit Swamp APPROVAL of 401 WATER QUALITY CERTIFICATION, and NEUSE BUFFER AUTHORIZATION with ADDITIONAL CONDITIONS Mr Jay Johnson North Carolina Department of Transportation P O Box 1587 Gieenville NC 27835 Dear Mr Johnson You have our approval in accordance, with the conditions listed below for the following impacts for the purpose of replacing Bridge Number 19 over Kit Swamp with an aluminuin box culvert on SR 1003 (Aurora Rd) in Craven County qt! Pam And Rnffer imnnrts in the Neuse River Basin * temporary impacts due to de watering activities The project shall be consti ucted in accordance, with your application dated received November 9 2011 After reviewing your application we have decided that these impacts are covered by General Water Quality Certification 3820 This certification corresponds to the Regional General Permit 198200031 issued by the Corps of Engineers This approval is also valid for the Neuse Riparian Buffer Rules (15A NCAC 213 0233) In addition you should acquire any other federal state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control Non Discharge and Water Supply Watershed regulations This approval will expue with the accompanying 404 permit l This approval is v-did solely for the purpose and design desciibed in your application (unless modified below) Should your project change you must notify the DWQ and submit a new application If the propeity is sold the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all the conditions If total wetland fills for this project (now or in the future) exceed one acre or of total impacts to streams (now or in the future) exceed 150 linear feet compensatory mitigation may be required as described in 15A NCAC 2H 0506 (h) (6) and (7) For this approval to remain valid you must adhere to the conditions listed in the attached certification North Carolina Division of Water Qu thty Internet www ncwaterquahty ore 943 Washington Square Mall Phone 252 946 6481 Washington NC 27889 rAX 252 946 9215 An Equal Opportunity /Affirmabve Action Employer —50/ Recycled /10/ Post Consumer Paper NorthCarolma Naturally Buffer Zonei Buffer Zone2 Stream Fill Stream Site Number Fill (sq ft Fill (sq ft linear ft ) (Temporar 1 560 360 2 520 365 3 615 445 M 4 600 410 Total 2 295 1 580 53 7* Net Total 3,875 60 Impacts * temporary impacts due to de watering activities The project shall be consti ucted in accordance, with your application dated received November 9 2011 After reviewing your application we have decided that these impacts are covered by General Water Quality Certification 3820 This certification corresponds to the Regional General Permit 198200031 issued by the Corps of Engineers This approval is also valid for the Neuse Riparian Buffer Rules (15A NCAC 213 0233) In addition you should acquire any other federal state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control Non Discharge and Water Supply Watershed regulations This approval will expue with the accompanying 404 permit l This approval is v-did solely for the purpose and design desciibed in your application (unless modified below) Should your project change you must notify the DWQ and submit a new application If the propeity is sold the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all the conditions If total wetland fills for this project (now or in the future) exceed one acre or of total impacts to streams (now or in the future) exceed 150 linear feet compensatory mitigation may be required as described in 15A NCAC 2H 0506 (h) (6) and (7) For this approval to remain valid you must adhere to the conditions listed in the attached certification North Carolina Division of Water Qu thty Internet www ncwaterquahty ore 943 Washington Square Mall Phone 252 946 6481 Washington NC 27889 rAX 252 946 9215 An Equal Opportunity /Affirmabve Action Employer —50/ Recycled /10/ Post Consumer Paper NorthCarolma Naturally Page 2 of 5 1 The issuance of this certification does not exempt the Perm►ttee from complying with any and all statutes rules regulations or ordinances that may be imposed by other government agencies (i a local state and federal) having jurisdiction including but not limited to applicable buffer rules stormwater management rules soil erosion and sedimentation control requirements etc 2 The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any other appropriate requirements of State and Federal law If DWQ determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated or that further conditions are necessary to assure compliance DWQ may reevaluate and modify this certification 3 The Permittee shall ensure that the final design drawings adhere to the certification and to the drawings submitted for approval 4 Unless otherwise approved in this certification placement of culverts and other structures in open waters and streams shall be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches to allow low flow passage of water and aquatic life Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis equilibrium of wetlands or streambeds or banks adjacent to or upstream and downstream of the above structures The applicant is required to provide evidence that the equilibrium is being maintained if requested in writing by NCDWQ If this condition is unable to be met due to bedrock or other limiting features encountered during construction please contact NCDWQ for guidance on how to proceed and to determine whether or not a permit modification will be required 5 All work in or adjacent to stream waters shall be conducted in a dry work area Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual such as sandbags rock berms cofferdams and other diversion structures shall be used to prevent excavation in flowing water 6 If concrete is used during construction a dry work area shall be maintained to prevent direct contact between curing concrete and stream water Water that inadvertently contacts uncured concrete shall not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills 7 The use of rip rap above the Normal High Water Mark shall be minimized Any rip rap placed for stream stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life passage 8 During the construction of the project no staging of equipment of any kind is permitted in waters of the U S or protected riparian buffers 9 The dimension pattern and profile of the stream above and below the crossing shall not be modified Disturbed floodplams and streams shall be restored to natural geomorphic conditions 10 Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize sedimentation and reduce the introduction of other pollutants into the stream 11 All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels lubricants hydraulic fluids or other toxic materials 12 No rock sand or other materials shall be dredged from the stream channel except where authorized by this certification 13 Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited 14 All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3 1 unless otherwise authorized by this certification 15 The outside buffer wetland or water boundary located within the construction corridor approved by this certification shall be clearly marked by highly visible fencing prior to any land disturbing activities Impacts to areas within the fencing are prohibited unless otherwise authorized by this certification 16 Native riparian vegetation (ex list trees and shrubs native to your geographic region) must be reestablished within the construction limits of the project by the end of the growing season following completion of construction Page 3 of 5 17 There shall be no excavation from or waste disposal into .jurisdictional wetlands or waters associated with this certification without appropriate modification Should waste or borrow sites or access roads to waste or borrow sites be located in wetlands or streams compensatory mitigation will be required since that is a direct impact from road construction activities 18 Erosion and sediment control practices must be in full compliance with all specifications governing the proper design installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards a The erosion and sediment control measures for the project must be designed installed operated and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual b The design installation operation and maintenance of the sediment and erosion control measures must be such that they equal or exceed the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual The devices shall be maintained on all construction sites borrow sites and waste pile (spoil) projects including contractor owned or leased borrow pits associated with the project c For borrow pit sites the erosion and sediment control measures must be designed installed operated and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual d The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act 19 Strict adherence to the most recent version of NCDOT s Best Management Practices For Bridge Demolition and Removal approved by the US Army Corps of Engineers is a condition of the 401 Water Quality Certification 20 Riprap shall not be placed in the active thalweg channel or placed in the streambed in a manner that precludes aquatic life passage Bioengineering boulders or structures should be properly designed sized and installed 21 New roadside ditches must be in compliance with the nitrogen control and diffuse flow requirements outlined in 15A NCAC 2B 0233 22 Pursuant to NCAC15A 2B 0233(6) sediment and erosion control devices shall not be placed in Zone 1 of any Neuse Buffer without prior approval by the NCDWQ At this time the NCDWQ has approved no sediment and erosion control devices in Zone 1 outside of the approved project impacts anywhere on this project Moreover sediment and erosion control devices shall be allowed in Zone 2 of the buffers provided that Zone 1 is not compromised and that discharge is released as diffuse flow 23 All riparian buffers impacted by the placement of temporary fill or clearing activities shall be restored to the preconstruction contours and revegetated Maintained buffers shall be permanently revegetated with non woody species by the end of the growing season following completion of construction For the purpose of this condition maintained buffer areas are defined as areas within the transportation corridor that will be subject to regular DOT maintenance activities including mowing The area with non maintained buffers shall be permanently revegetated with native woody species before the next growing season following completion of construction 24 All stormwater runoff shall be directed as sheetflow through stream buffers at nonerosive velocities unless otherwise approved by this certification 25 The Permittee shall report any violations of this certification to the Division of Water Quality within 24 hours of discovery 26 Upon completion of the project (including any impacts at associated borrow or waste site) the NCDOT Division Engineer shall complete and return the enclosed Certification of Completion Form to notify DWQ when all work included in the 401 Certification has been completed 27 A copy of this Water Quality Certification shall be maintained on site at the construction site at all times In addition the Water Quality Certification and all subsequent modifications if any shall be maintained with the Division Engineer and the on site project manager Page 4of5 If you do not accept any of the conditions of this certification you may ask for an adjudicatory hearing You must act within 60 days of the date that you receive this letter ro ask for a hearing send a written petition that conforms to Chapter I SOB of the North Carolina General Statutes to the Office of Administrative Hearings 6714 Mail Service Center Raleigh N C 27699 This certification and its conditions are final and binding unless you ask for a hearing This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act If you have any questions please contact Garcy Ward at (252) 948 3922 Sincere y I/ for Chuck Waft Attachments (General Certification and Certificate of Completion form) cc Tom Steffens US Army Corps of Engineers Washington Field Office Sonia Carrillo DWQ 401 /Wetlands Unit Raleigh NC File Copy