Loading...
HomeMy WebLinkAbout20110984 Ver 1_Approval Letter_20120111�° A NC®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Waklld P E Gc4ernor Director January 11 2012 Dr Greg Thorpe PhD Manager Project Development and Environmental Analysts North Carolina Department of Transportation 1598 Mail Service Center Raleigh North Carolina 27699 1598 Dee Freeman Secretary Subject 401 Water Quality Certification Pursuant to Section 401 of the Federal Clean Water Act with ADDITIONAL CONDITIONS for Proposed replacement of Bridge Nos 12 18 and 42 on NC 11 over the Cape Fear River and overflows in Bladen County Federal Aid Project No BRSTP 001 1(9) State Project No 8 1421401 TIP B 4028 NCDWQ Project No 110984 Dear Dr Thorpe Attached hereto is a copy of Certification No 3876 issued to The North Carolina Department of Transportation ( NCDOT) dated January 10 2012 If we can be of further assistance do not hesitate to contact us Sincerely jh arle akild P Director Attachments cc Ronnie Smith US Army Corps of Engineers Wilmington Field Office (electronic copy only) Greg Burns PE Division 6 Engineer Jim Rerko Division 6 Environmental Officer (electronic copy only) Chris Militscher Environmental Protection Agency (electronic copy only) Travis Wilson NC Wildlife Resources Commission (electronic copy only) Leilam Paugh NCDOT NEU Mitigation (electronic copy only) John Merritt NCDOT NEU (electronic copy only) File Copy T ansportatlon Permitting Unit 1650 Mal Service Center Raleigh North Carolina 27699 1650 Location 512 N Salisbury St Raleigh North Carolina 27604 Phone 919 807 6300 \ FAX 919 807 6492 Internet http /lh2o enr state nc uslncwetlandsl An Equal Opportunity 1 Affirmative Action Employer NorthCarohna Naturally 401 Water Quality Certification Pursuant to Section 401 of the Federal Clean Water Act with ADDITIONAL CONDITIONS THIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92 500 and 95 217 of the United States and subject to the North Carolina Division of Water Quality (NCDWQ) Regulations in 15 NCAC 2H 0500 This certification authorizes the NCDOT to impact 4 31acres of jurisdictional wetlands and 1 74 acres of surface waters in Bladen County The project shall be constructed pursuant to the application dated received November" 2011 The authorized impacts areas descr bed below Wetland impacts in the Cape Fear River Basin (riparian) Location Structure Type Permanent Fill (acre) Temporary Fill (acre) Excavation (acre) Mechanized Clearing (acre) Hand Clearing (acre) Total Wetland Impact acre Impacts Requiring Mitigation acre 22 +65 L to 39 +30 L 1236 ft Bridge 001 0 0 0 0 1 0 04 006 0 02 22 +6� L to 39 +30 L Work Bride 0 <0 01 0 0 0 12 0 12 0 00 39 +90 L to 52 +10 L 375 ft Bride 045 0 0 009 008 0 62 054 39 +90 L to 52 +10 L Work Bride 0 0 01 0 0 0 23 024 000 52 +10 L to 69 +00 L 37� ft bride 043 0 0 0 13 0 15 0 71 0.)6 52 +10 L to 69 +00 L Work Bridge 0 0 01 0 0 023 024 � xv n ✓rt I'll NOW 3+.ee €"a�M� .0 � ^' `P+t# eewYkY � ���. �4 S.'�i � f�.�. mri.✓rft' r' ru ����� g0� }00 �cttai ''� -• Site 1 (30 +72 to 33 +40) Aerial Power 0 0 0 0 026 026 0 00 Site 2 (32 +76 to 35 +29) Aerial Power 0 0 0 0 03-,) 0 35 000 Site 3 (44 +32 to 44 +61) Aerial Power 0 0 0 0 0 01 0 01 000 Site 4 (49 +15) Trans Pole <001 0 0 0 0 <0 01 000 Site D (49 +84 to 51 +95) Aerial Power 0 0 0 0 023 02-) 000 Site 6 (54 +35) Trans Pole <0 01 0 0 0 0 <0 01 000 Site 7 (:)7 +88 to 58 +63) Aerial Power 0 0 0 0 1 0� 1 0-,) 000 Site 8 (61 +88 to 63 +63) Aerial Power 0 0 0 0 0 10 0 10 000 Site 9 (6.)+55) `I rans Pole <0 01 0 0 0 0 <0 01 000 Sitc 10 (64 +44 to 67 +45) Aerial Power 0 0 0 0 032 0 32 0 00 Total 089 0 02 0 023 3 17 4 31 1 12 Total Wetland Impact for Project 4 31 acres Open Water (Ponds) Impacts in the Cape Fear River Basin Location Structure Permanent Fill in Open Waters ac Temporary Fill in Open Waters ac Total Fill in Open Waters ac 22 +6� L to 39 +30 L 1236 ft Bridge 067 0 067 22 +65 L to 39 +30 L Work Bride 0 0 01 0 01 39 +90 L to 52 +10 L 375 ft Bride 079 0 0 79 52 +10 L to 69 +00 L 37� ft Bride 027 0 027 Total 1 73 001 1 74 Total Open Water Impact for Project 1 74 acres The application provides adequate assurance that the discharge of fill material into the waters of the Cape Fear River Basin in conjunction with the proposed development will not result in a violation of applicable Water Quality Standards and discharge guidelines Therefore the State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301 302 30.) 306 j07 of PL 92 500 and PL 95 217 if conducted in accordance with the application and conditions hereinafter set forth This approval is only valid for the purpose and design that you submitted in your application dated received November 7 2007 Should your project change you are required to notify the NCDWQ and submit a new application If the property is sold the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all the conditions If any additional wetland impacts or stream impacts for this project (now or in the future) exceed one acre or 150 linear feet respectively additional compensatory mitigation may be required as described in 15A NCAC 2H 0506 (h) (6) and (7) For this approval to remain valid you are required to comply with all the conditions listed below in addition you should obtain all other federal state or local permits before proceeding with your project including (but not limited to) Sediment and Erosion control Coastal Stormwater Non discharge and Water Supply watershed regulations This Certification shall expire on the same day as the expiration date of the corresponding Corps of Engineers Permit Condition(s) of Certification Project Specific Conditions i The NCDOT Division Environmental Officer or Environmental Assistant will conduct a pre construction meeting with all appropriate staff to ensure that the project supervisor and essential staff understand the potential issues with stream and pipe alignment at the permitted site NCDWQ staff shall be invited to the pre construction meeting 2 The permittee will need to adhere to all appropriate in water work moratoria (including the use of pile driving or vibration techniques) prescribed by the NC Wildlife Resources Commission and National Marine Fisheries Service No in water work is permitted between February 15 and June 30 of any year without prior approval from the NC Division of Water Quality and the NC Wildlife Resources Commission In addition the permittee shall conform with the NCDOT policy entitled Stream Crossing Guidelines for Anadromous Fish Passage (May 12 1997) at all times Strict adherence to the most recent version of NCDOT s Best Management Practices For Bridge Demolition and Removal approved by the US Army Corps of Engineers is a condition of the 401 Water Quality Certification 4 The post construction removal of any temporary bridge structures must return the project site to its preconstruction contours and elevations The impacted areas shall be revegetated with appropriate native species 5 Bridge deck drains shall not discharge directly into the stream Stormwater shall be directed across the bridge and pre treated through site appropriate means (grassed swales pre formed scour holes vegetated buffers etc ) before entering the stream Please refer to the most current version of Stormwater Best Management Practices 6 Bridge piles and bents shall be constructed using driven piles (hammer or vibratory) or drilled shaft construction methods More specifically jetting or other methods of pile driving are prohibited without prior written approval from NCDWQ first 7 All pile driving or drilling activities within the Cape Fear River as well as any rock fill placed in surface waters with outlets to jurisdictional resources shall be enclosed in turbidity curtains unless otherwise approved by NCDWQ in this certification 8 The post construction removal of any temporary bridge structures must return the project site to its preconstruction contours and elevations The impacted areas shall be revegetated with appropriate native species 9 All fill from the abandoned causeway shall be removed and the area graded down to the elevation of the adjacent undisturbed natural ground 10 The project shall be constructed in accordance with the Stormwater Management Plan submitted and dated August 4 2011 11 Compensatory mitigation for impacts to 1 12 acre of riparian wetlands is required We understand that you have chosen to perform compensatory mitigation for impacts to wetlands through the North Carolina Ecosystem Enhancement Program (EEP) and that the EEP has agreed to implement the mitigation for the project EEP has indicated in a letter dated November 1 2011 that they will assume responsibility for satisfying the federal Clean Water Act compensatory mitigation requirements for the above referenced project in accordance with the North Carolina Department of Environment and Natural Resources Ecosystem Enhancement Program In Lieu Fee Instrument signed July 28 2010 General Conditions 12 Unless otherwise approved in this certification placement of culverts and other structures in open waters and streams shall be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches to allow low flow passage of water and aquatic life Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis equilibrium of wetlands or streambeds or banks adjacent to or upstream and down stream of the above structures The applicant is required to provide evidence that the equilibr um is being maintained if requested in writing by NCDWQ If this condition is unable to be met due to bedrock or other limiting features encountered during construction please contact NCDWQ for guidance on how to proceed and to determine whether or not a permit modification will be required 13 If concrete is used during construction a dry work area shall be maintained to prevent direct contact between curing concrete and stream water Water that inadvertently contacts uncured concrete shall not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills 14 During the construction of the project no staging of equipment of any kind is permitted in waters of the U S or protected riparian buffers 15 The dimension pattern and profile of the stream above and below the crossing shall not be modified Disturbed floodpla►ns and streams shall be restored to natural geomorphic conditions 16 The use of rip rap above the Normal High Water Mark shall be minimized Any rip rap placed for stream stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life passage 17 The Petmittee shall ensure that the final design drawings adhere to the permit and to the permit drawings submitted for approval 18 All work in or adjacent to stream waters shall be conducted in a dry work area Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual such as sandbags rock berms cofferdams and other diversion structures shall be used to prevent excavation in flowing water 19 Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize sedimentation and reduce the introduction of other pollutants into the stream 20 All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels lubricants hydraulic fluids or other toxic materials 21 No rock sand or other materials shall be dredged from the stream channel except where authorized by this certification 22 Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited 23 The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any other appropriate requirements of State and Federal law if NCDWQ determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated or that further conditions are necessary to assure compliance NCDWQ may reevaluate and modify this certification 24 All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3 1 unless otherwise authorized by this certification 25 A copy of this Water Quality Certification shall be maintained on the construction site at all times in addition the Water Quality Certification and all subsequent modifications if any shall be maintained with the Division Engineer and the on site project manager I-.; 26 The outside buffer wetland or water boundary located within the construction corridor approved by this `f authorization shall be clearly marked by highly visible fencing prior to any land disturbing activities Impacts to areas within the fencing are prohibited unless otherwise authorized by this certification 27 The issuance of this certification does not exempt the Permittee from complying with any and all statutes rules regulations or ordinances that may be imposed by other government agencies (i e local state and federal) having jurisdiction including but not limited to applicable buffer rules stormwater management rules soil erosion and sedimentation control requirements etc 28 The Permittee shall report anv violations of this certification to the Division of Water Quahty within 24 hours of discovery 29 Upon completion of the project (including any impacts at associated borrow or waste sites) the NCDOT Division Engineer shall complete and return the enclosed Certification of Completion Form to notify NCDWQ when all work included in the 401 Certification has been completed 30 Native riparian vegetation must be reestablished within the construction limits of the project by the end of the growing season following completion of construction 31 There shall be no excavation from or waste disposal into jurisdictional wetlands or waters associated with this permit without appropriate modification Should waste or borrow sites or access roads to waste or borrow sites be located in wetlands or streams compensatory mitigation will be required since that is a direct impact from road construction activities 32 Erosion and sediment control practices must be in full compliance with all specifications governing th- proper design installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards a The erosion and sediment control measures for the protect must be designed installed operated and maintained in accordance with the most recent version of the North Carolina Sediment and Ei osion Control Planning and Design Manual b The design installation operation and maintenance of the sediment and erosion control measures must be such that they equal or exceed the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual The devices shall be maintained on all construction sites borrow sites and waste pile (spoil) projects including contractor owned or leased borrow pits associated with the project c For borrow pit sites the erosion and sediment control measures must be designed installed operated and maintained in accordance with the most recent version of the North Carolina Surface Mini% Manual d The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act 32 Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by this Certification Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and /or civil penalties This Certification shall become null and void unless the above conditions are made conditions of the Federal 404 and /or Coastal Area Management Act Permit This Certification shall expire upon the expiration of the 404 or CAMA permit If you wish to contest any statement in the attached Certification you must file a petition for an administrative hearing You may obtain the petition form from the office of Administrative hearings You must file the petition with the office of Administrative Hearings within sixty (60) days of receipt of this notice A petition is considered filed when it is received in the office of Administrative Hearings during normal office hours The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8 00am and 5 OOpm except for official state holidays The original and one(]) copy of the petition must be filed with the Office of Administrative Hearings The petition may be faxed provided the original and one copy of the document is received by the Office of Administrative Hearings within five (5) business days following the faxed transmission The mailing address for the Office of Administrative Hearings is Office of Administrative Hearings 6714 Mail Service Center Raleigh NC 27699 6714 Telephone (919) 733 2698 Facsimile (919) 7 -)3 3478 A copy of the petition must also be served on DENR as follows Ms Mary Penny Thompson General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh NC 27699 1601 This the 1 lth day of January 2012 DIVISIO�N� OF WATER QUALITY i 1A Charles Wakild P E ln- Director WQC No 3876 r NCDWQ Project No Count Applicant Project Name Date of issuance of 401 Water Quality Certification Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certitication or applicable Bufter Rules and any subsequent modifications the applicant is required to return this certificate to the 401 Transportation Permitting Unit North Carolina Division of Water Quality 1650 Mail Service Center Raleigh NC 27699 1650 This form may be returned to NCDWQ by the applicant the applicant s authorized agent or the project engineer It is not necessary to send certificates from all of these Applicant s Certification I hereby state that to the best of my abilities due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules the approved plans and specifications and other supporting materials Signature Date Agent s Certification I hereby state that to the best of my abilities due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules the approved plans and specifications and other supporting materials Signature Engineer s Certification Date Partial Final I as a duly registered Professional Engineer in the State of North Carolina having been authorized to observe (periodically weekly full time) the construction of the project for the Permittee hereby state that to the best of my abilities due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules the approved plans and specifications and other supporting materials Signature Date Registration No