HomeMy WebLinkAbout20111105 Ver 1_More Info Received_20120105December 30, 2011
N[Rt;:;qgflV2
TO Ms Christy Wicker D
U S Army Corps of Engineers AN 5
69 Darlington Avenue 2012
Wilmington NC 28402 DENR WgTERQ(/q�l�y
(ANDSAND STOR,yIWATER BRANCH
RE Revision to NWP 18 Application
Davis Ridge Road Relocation, Carteret County NC
COURT ESPY
COPY
Dear Christy
At your request the proposed road relocation for the Davis Ridge project has been
modified to include a small swale (— 12 deep) to run parallel to the new road This will ensure
that the project will not flood adjacent property owners The impact area has increased slightly to
0 064 acre Enclosed are the revised site plan and pages 3 and 4 of the revised PCN
Thank you for your assistance with this project
Sincerely _
Kim Williams
Wetland Scientist
Encl
C Mr Mack Baker Mack Baker Construction
Ms Joanne Steenhuis NC DWQ
Mr Ian McMillan, NC DWQ
www Imgroup net info @Imgroup net Phone 910 452 0001 Fax 910 452 0060
3805 Wrightsville Ave Suite 15 Wilmington NC 28403 P 0 Box 2522 Wilmington NC 28402
Il -1toS
B Project Information and Prior Project History
1 Property Identification
1a Property identification no (tax PIN or parcel ID)
Easement within 736801081224000
Latitude 34 789636 N Longitude 76 4677 W
1 b Site coordinates (in decimal degrees)
(DD DDDDDD) ( DD DDDDDD)
1c Property size
Easement is - 0 1 ac
2 Surface Waters
2a Name of nearest body of water (stream river etc ) to
Core Sound
proposed project
2b Water Quality Classification of nearest receiving water
SA ORW
2c River basin
White Oak River
3 Project Description
3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application The easement contains a portion of an existing road and an adjacent ditch Remaining section of the
easement is undeveloped and vegetated
3b List the total estimated acreage of all existing wetlands on the property
-007 ac
3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property
N/A
3d Explain the purpose of the proposed project
The purpose of the project is to relocate an existing road to be fully within an easement This road provides access to a
tract located to the south of the easement
3e Describe the overall project in detail including the type of equipment to be used
The applicant will fill an existing roadside ditch and will then construct a dirt road within the easement This ditch does not
carry flow from adjacent properties Therefore no pipes are necessary However at the request of the ACOE a shallow
12 swale will be constructed parallel to the relocated road
4 Jurisdictional Determinations
4a Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
®Yes E] No El Unknown
project (including all prior phases) in the pasty
Comments
4b If the Corps made the jurisdictional determination what type
® Preliminary ❑ Final
of determination was made?
4c If yes who delineated the jurisdictional areas?
Agency /Consultant Company
Name (if known) Christy Wicker with the ACOE reviewed
the project area and determined the ditch to be wetlands
Other
4d If yes list the dates of the Corps jurisdictional determinations or State determinations and attach documentation
JD 0 Neal the LPO for the area visited the site and confirmed that no coastal wetlands or AEC s existing within the project
boundaries
5 Project History
5a Have permits or certifications been requested or obtained for
❑ Yes ® No ❑ Unknown
this project (including all prior phases) in the past?
5b If yes explain in detail according to help file instructions
6 Future Project Plans
6a Is this a phased project?
❑ Yes ® No
6b If yes explain
Page 3 of 10
PCN Form - Version 1 3 December 10 2008 Version
C Proposed Impacts Inventory
1 Impacts Summary
1a Which sections were completed below for your project (check all that apply)
® Wetlands ❑ Streams tributaries ❑ Buffers
❑ Open Waters ❑ Pond Construction
2 Wetland Impacts
If there are wetland impacts proposed on the site then complete this question for each wetland area impacted
2a
2b
2c
2d
2e
2f
Wetland impact
Type of jurisdiction
number —
Type of impact
Type of wetland
Forested
(Corps 404 10
Area of impact
Permanent (P) or
(if known)
DWQ — non -404 other)
(acres)
Temporary T
W1 ®P ❑ T
Fill for road
Non Riparian
® Yes
❑ No
® Corps
® DWQ
0 064
W2 ®P ❑ T
❑ Yes
® Corps
❑ No
® DWQ
W3 ®P ❑ T
❑ Yes
® Corps
❑ No
® DWQ
W4 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W5 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
2g Total wetland impacts
0 064
2h Comments
3 Stream Impacts N/A
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this
question for all stream sites impacted
3a
3b
3c
3d
3e
3f
3g
Stream impact
Type of impact
Stream name
Perennial
Type of jurisdiction
Average
Impact
number
(PER) or
(Corps 404 10
stream
length
Permanent (P) or
intermittent
DWQ — non -404
width
(linear
Temporary (T)
(INT)?
other)
(feet)
feet)
S1 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S2 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S3 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
3h Total stream and tributary impacts
31 Comments
Page 4 of 10
PCN Form — Version 1 3 December 10 2008 Version