HomeMy WebLinkAbout490016_Compliance Evaluation Inspection_20200706Type of Visit: (tom a liance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
Reason for Visit: C!'' outine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit:
Farm Name:
Owner Name:
Mailing Address:
Arrival Time:
loOo
Departure Time:
Physical Address:
Facility Contact:
/o /o
Owner Email:
Phone:
County:
Region:
Fred Se-14/o
Onsite Representative:
Certified Operator:
Back-up Operator:
Location of Farm:
Title:
Phone:
Latitude:
Integrator:
Certification Number:
Certification Number:
Longitude:
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation? ❑ Yes [No ❑ NA ❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated volume that reached waters of the State (gallons)?
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes [o El NA ❑ NE
❑ Yes L1'4o ❑ NA ❑ NE
Page 1 of 3
2/4/2015 Continued
Facility Number: 99 - /16—
Date of Inspection: °7.. ., p
24. Did the facility fail to calibrate waste application equipment as required by the permit?
❑ Yes ❑ No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑ No ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes ❑ No ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No ❑ NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency? ❑ Yes ® No ❑ NA ❑ NE
fse drawi n s of facility to ielter explain s tun
(eAed 3
r
4;0
Reviewer/Inspector Name:
Reviewer/Inspector Signature:
Page 3 of 3
2/4/2015