Loading...
HomeMy WebLinkAbout20110621 Ver 1_Stormwater Plans_20110707r BEVERLY PURDUE GOVERNOR Stormwater Section N C Division of Water Quality Winston -Salem Regional Office 585 Waughtown St Winston - Salem, NC 27107 Attention Ms Amy Euhss v STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION P 0 Box 25201 Raleigh, NC 27611 5202 PHONE 919 -733 2520 June 27 2011 �VTI, JR SEC H Subject State Stormwater Permit Request for the replacement of Bridge #29 over Mill Creek on SR 1322 in Surry County Debit WBS 33623 1 1 $505 Dear Ms Euhss The North Carolina Department of Transportation is scheduled to replace Bridge #29 with a new longer bridge at the same location Since this bridge crosses an outstanding resource water I have included a Stormwater Application Form, the Project Scope Narrative two sets of the project plans and the authority to debit $505 for the permit application fee Please review this project for authorization by your Division We would like to begin construction as soon as possible If further information is required, please let me or Ivan Dishman, PE know Your early review and consideration will be appreciated Sincerely _ Heath Slaughter Division Environmental Officer Enclosures cc Monte Matthews US Army Corps of Engineers Brian Wrenn, Division of Water Quality Mike Pett -Rohn, PE Division Engineer Ivan Dishman, PE Division Bridge Program Manager Heath Slaughter Division Environmental Officer Neil Trivette Roadside Environmental Field Operations Engineer P O Box250 N WILKESBORO NC 28659 PxoNE (336) 667 9111 FAx (336) 6674549 OFFICE USE ONLY Date Received Fee Paid Permit Number State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM NORTH CAROLINA DEPARTMENT OF TRANSPORTATION LINEAR ROADWAY PROJECT This form may be photocopied for use as an onginal DWQ Stormwater Management Plan Review A complete stormwater management plan submittal includes this application form, a supplement form for each BMP proposed (see Section V) design calculations and plans and specifications showing all road and BMP details PROJECT INFORMATION NCDOT Project Number 33623 1 1 County Surr Project Name TIP# B-4284 ftlace Bridge #29 on SR 1322 over Mill Creek Project Location 12 miles NE of Mtn Park Contact Person Ivan Dishman. PE Phone (336)903 -9220 Fax (336) 667 -4549 Receiving Stream Name Mill Creek River Basin Yadkin Class C Trout, ORW Proposed linear feet of project 400 Proposed Structural BMP and Road Station (attach a list of station and BAP type if more room is needed) Grass fill embankment Type of proposed protect (check all that apply) ❑ New E]Widemng ❑2 lane* ❑4 lane* ❑Curb and Gutter ®Budge Replacement ❑Other (Describe) *2 lane and 4 lane imply that roadside ditches are used unless Curb and Gutter is also checked II REQUIRED ITEMS CHECKLIST Initial in the space provided below to indicate the following design requirements have been met and supporting documentation is attached Supporting documentation shall at a minimum, consist of a brief narrative description including (1) the scope of the project (2) how the items below are met (3) how the proposed best management practices minimize water quality impacts and (4) any significant constraints and/or justification for not meeting a b c and d to the maximum extent practicable ID er s Initials a The amount of impervious surface has been minimized as much as possible b The runoff from the impervious areas has been diverted away from surface waters as much as possible c Best Management Practices are employed which minimize water quality impacts ).1 d Vegetated roadside ditches are 3 1 slope or flatter III. OPERATION AND MAINTENANCE AGREEMENT I acknowledge and agree by my initials below that the North Carolina Department of Transportation is responsible for the implementation of the four maintenance items listed I agree to notify DWQ of any operational problems with the BMP s that would impact water quality or prior to making any changes to the system or responsible party Maintenance Engineer s Initials ;9,ca BMP s shall be inspected and maintained in good working order b Eroded areas shall be repaired and reseeded as needed Stormwater collection systems including piping mlets and outlets shall be maintained to insure proper functioning Maintenance Engineer s Name Title %�1,217f IV APPLICATION CERTIFICATION I (print or type name) Zyav\'I o of --0 V ( I ' --,, D H Branch, certify that the information included on this permit application form is to the best of my knowledge correct and that the protect will be constructed in conformance with the approved plans and that the proposed project complies with the requirements of 15A NCAC 2H 1000 Title y s%oh -8 r,, J Q -? o i, ., Address P- B ck -2w M W 14ps�.Q o N C a Sto S9 Signature V SUPPLEMENT FORMS Date Lv1a7111 The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BUT specified for this protect Contact the Stormwater and General Permits Unit at (919) 733 -5083 for the status and availability of these forms Form SW401 Low Density Form SW401 -Curb Outlet System Form SW401 -Off Site System Form SW401 -Wet Detention Basin Form SW401- Infiltration Basin Form SW401- Infiltration Trench Form SW401 Bioretention Cell Form SW401 Level Spreader Form SW401- Wetland Form SW401- Grassed Swale Form SW401 -Sand Filter Low Density Supplement Curb Outlet System Supplement Off Site System Supplement Wet Detention Basin Supplement Infiltration Basin Supplement Underground Infiltration Trench Supplement Bioretention Cell Supplement Level Spreader /Filter Strip /Restored Riparian Buffer Supplement Constructed Wetland Supplement Grassed Swale Supplement Sand Filter Supplement STORMWATER MANAGEMENT PLAN Project 33623 1 1 TIP# B -4284 June 22 2011 Surry County Project Engineer Ivan Dishman, PE Roadway Description This project consists of replacing Bridge #29 over Mill Creek on SR 1322 and improving the roadway bridge approaches The existing 20 x 36 bridge is structurally deficient and will be replaced with a new 30 x 110 bridge at the same location An off -site detour will be utilized during construction Total project length is 400 linear feet The existing 8' travel lanes will be widened to 13' including the paved shoulders Due to tapering impervious surface area will increase by approximately 0 05 acres The project drainage consists of one drop inlet and stub out pipe near station 10+75 left as well as a rock lined ditch running through an already ditched and disturbed wetland in the southwestern quadrant of the bridge Environmental Description This project is located in the Yadkin River Basin and is not subject to riparian buffer rules Mill Creek is classified as Class C Trout ORW at this location No other jurisdictional streams will be impacted by this proposed project Best Management Practices and Mai or Structures The primary goal for Best Management Practices (BMPs) is to prevent degradation of the state's surface waters by the location, construction and operation of the highway system BMPs are activities practices and procedures taken to prevent or reduce stormwater pollution Due to steep terrain and limited right -of -way there is not a suitable location for a structural BMP 11 Required Items Checklist The proposed structure is a 110 long 2 span 21 cored slab bridge with spill through abutments Approximately 400 linear feet of roadway is being widened, including the bridge a Minimized to the extent hydraulically possible b Stormwater on the southern end of the project will sheet flow off of the roadway Due to the required superelevation of the bridge flow from the northern section of the bridge is concentrated into a drop inlet near station 10 +75 It This inlet will discharge as far away from Mill Creek as reasonably possible Due to steep terrain, it is not possible to install a preformed scour hole but we can and will install a rock energy dissipater pad Stormwater will sheet flow from there to the creek, which is located about 20 feet to the west No deck drains are called for in the plans There will be no slots in the railing so all drainage will be routed to the ends of the bridge c Topographic and nght -of -way constraints make the installation of a structural BMP infeasible We did consider piping stormwater from the DI at station 10 +75 (It ) to the small flat landing zone on the other side of the road It was thought that we may have room there for at least an undersized preformed scour hole at the pipe outlet Doing so however would increase discharge velocities due to the excessive pipe slope needed to accomplish the task We saw no benefit to this proposal so the idea was abandoned Roadway fill slopes will be vegetated All appropriate construction BMPs will be employed during bridge demolition and reconstruction d N/A The only roadside ditch associated with the project is running through a disturbed wetland adjacent to the road The slope on this ditch line ranges between 4% - 8% which requires a rock liner per DLQ rules for stability purposes Flattening side slopes of this ditch line would result in an increase in wetland impacts p 3 n PIC r O O ICA _y O z oil i N a D D co Z m K zED m-+m N �1 mr r- z0 m m ;u x:10 0 Mmz O O H O C7 CD ::E °m D< K mV) m -.i �m N Sly CD m C-) A L/) H O � -4 Z D 00 0 Q z + o (n o X N A O C Co. z W �N W h Ili LID Or> / I I' 96 I N k' LD LO 1 � O N \ i N 0 c . e- C� b D H O N Iv r Iry II c�r-X�0 " y� Z DII � N II II D z z a> �N�t.OtON ii D F O 0 -11 00 L 0Un�vNi ec N DRl mW W � Lj �WLJ ODC m i N a D D co Z m K zED m-+m N �1 mr r- z0 m m ;u x:10 0 Mmz O O H O C7 CD ::E °m D< K mV) m -.i �m N Sly CD m C-) A L/) H O � -4 Z D 00 0 Q z + o (n o X N A O C Co. z W �N W h Ili LID Or> / I I' 96 I N k' LD LO 1 � O N \ i N 0 c . e- -i r J 0 bi O � I / I 0 M X Z -i D H Z F i czi � Zi c D = O�z Ozo 0 \ ::E \\ <m \ ()-n D \ r I � n I II I I/ I / 0 O / co z J ■ C� H D H O N Iv Iry II c�r-X�0 " y� Z DII � N II II D z O a> �N�t.OtON ii D F O 0 -11 00 L 0Un�vNi LMNW�~ (.Jl CO � + n N DRl mW W � Lj �WLJ ODC NN ���nr��° cn < m w O Utp oppODD D gg n\ # kD -i r J 0 bi O � I / I 0 M X Z -i D H Z F i czi � Zi c D = O�z Ozo 0 \ ::E \\ <m \ ()-n D \ r I � n I II I I/ I / 0 O / co z J ■ C� H cy*00 � N n G m-'Om D S ■ -I a> Z O Z 2 +° 0 HN K- DL4 r, �' ���nr��° N� � co N mL O Utp oppODD O N \\ WO°01 CT) CC) r (n \ �WNM 'D()00 �.- .A + �Nbd�'� o�°z 100ND L" y � \ p Lon LD ■ �7 O \ 9 +00 L � m -i r J 0 bi O � I / I 0 M X Z -i D H Z F i czi � Zi c D = O�z Ozo 0 \ ::E \\ <m \ ()-n D \ r I � n I II I I/ I / 0 O / co z J ■ C� ® � N n G m-'Om ■ a> Z O Z o c� Nz o z X, a �' �oyw C w ■ O v 0 N W rn0 s z �Nbd�'� o�°z 0 O y � O N 'O ■ �7 O C jo 4 jo ®a �W. ,n 1 I L 1 �I � ` 1 CD m N 0 I N ml 1 I LO bZ -S r .Z7 \ _ mm 14 < \ 1 ut W O D N m r z m m i OZ ILI�I 1 � u, tt O N C N -i m N + m� zAx 0 O O O H p N C `'' r- 0 t� M CD 0 D + OLA mil co o°o \ C') \ 1] +00 l m H \ 1 m m m o g n \ \� Z 1 O C H � Z 1 m cn �m 0 m o 1 0 f 8 O � + 3 s � \ i 9.8 C> � \lam W�1 Q L9 St 1 \ rn CA Pg Z P8 X cn o �li D� zS X 4 O NN N + ul m 0 Tl 1�D N �j °� m � O Z Ut N m N Z D D H �r O + H O 0 Z ONCDI 0ND �N D m N ;0 m x C7 H v r' m, c z 7� 'D O D M it In rn tx+�'Y b T m c~i i b A fn° mM �i 8 ti ti d �'mobA� i M �miF s �n A b g m t � I r2n A a x °� mm F ti ' va a zt mpr+i imv�N y Im rZH Mai TD cm� a m v,x Tptia� 2 R