Loading...
HomeMy WebLinkAbout20110844 Ver 1_Approval Letter_20010103NC®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild P E Governor Director January 3 2012 Dr Greg Thorpe PhD Manager Project Development and Environmental Analysis North Carolina Department of Transportation 1548 Mail Service Center Raleigh North Carolina 27699 1548 Subject 401 Water Quality Certification Pursuant to Section 401 of the Federal Clean Water Act with ADDITIONAL CONDITIONS for Proposed improvements to SR 1001 (Connelly Springs Road) from US 321A (Norwood Street) to SR 1712 (Starcross Road) in Caldwell County Federal Aid Project No MA STP 7533(2) State Project No WBS 34783 1 1 TIP No U 2211B NCDWQ Project No 2011 0844 Dear Dr Thorpe Attached hereto is a copy of Certification No 3874 issued to The North Carolina Department of Transportation (NCDOT) dated January 3 2012 If we can be of further assistance do not hesitate to contact us Sincerely Charles Wakild P E Director Attachments cc Monte Matthews US Army Corps of Engineers Raleigh Field Office Mike Pettyjohn PE Division 11 Engineer Heath Slaughter Division 11 Environmental Officer Chris Militscher Environmental Protection Agency (electronic copy only) Marla Chambers NC Wildlife Resources Commission (electronic copy only) Beth Harmon Ecosystem Enhancement Program Mike Parker DWQ ARO Wetlands /401 Transportation Permitting Unit File Copy — J Transportation Permitting Unit 1650 Mail Service Center Raleigh North Carolina 27699 1650 Location 512 N Salisbury St Raleigh NC 27604 Archdale Building Phone 919 733 17861 FAX 919 733 6893 Internet http //h2o enr state nc us /ncwetlands/ An Equal Opportunity 1 Afflrmati�e Action Employer Dee Freeman Secretary NorthCal ohna Naturally, 401 Water Quality Certification Pursuant to Section 401 of the Federal Clean Water Act with ADDITIONAL CONDITIONS THIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92 500 and 95 217 of the United States and subject to the North Carolina Division of Water Quality ( NCDWQ) Regulations in 15 NCAC 2H 0500 This certification authorizes the NCDOT to impact 0 24 acres of jurisdictional wetlands and 1663 linear feet of Jurisdictional streams Caldwell County The project shall be constructed pursuant to the application dated received September 1 2011 with additional information dated received December 7 2011 and January 3 2012 The authorized impacts are as described below Stream Impacts in the Catawba River Basin Site Permanent Fill in Temporary Permanent Temporary Total Stream Total Intermittent Stream Fill in Fill in Fill in Stream Impacts under (linear ft) Intermittent Perennial Perennial Impact Requiring (ac) Bridge Stream (linear Stream Stream (linear ft) Mitigation ft ) (linear ft linear ft 024 linear ft 1 0 0 1000 34 1034 1000 2p 0 0 297 0 297 297 3 0 0 16 0 16 16 4 0 0 144 19 163 144 5 153 0 0 0 153 0 153 0 1457 53 1663 1457 Total Total Stream Impact for Project 1663 linear feet Wetland imnnek in the Catawba River Basin (riparian) Site Fill Fill Excavation Mechanved Hand Are i Total (ac) (temporary) (ac) Clearing Clearing under Wetland (ac) (ac) (ac) Bridge Impact ac ac 2 024 0 0 0 0 0 024 024 0 0 0 0 0 024 Total Total Wetland Impact for Project u 24 acres The application provides adequate assurance that the discharge of fill material into the waters of the Catawba River Basin in conjunction with the proposed development will not result in a violation of applicable Water Quality Standards and discharge guidelines Therefore the State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301 302 303 306 307 of PL 92 500 and PL 95 217 if conducted in accordance with the application and conditions hereinafter set forth This approval is only valid for the purpose and design that you submitted in your application dated received September 1 2011 with additional information dated received December 7 2011 and January 3 2012 Should your project change you are required to notify the NCDWQ and submit a new application If the property is sold the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all the conditions If any additional wetland impacts or stream impacts for this project (now or in the future) exceed one acre or 1501mear feet respectively additional compensatory mitigation may be required as described in 15A NCAC 2H 0506 (h) (6) and (7) For this approval to remain valid you are required to comply with all the conditions listed below In addition you should obtain all other federal state or local permits before proceeding with your project including (but not limited to) Sediment and Erosion control Coastal Stormwater Non discharge and Water Supply watershed regulations This Certification shall expire on the same day as the expiration date of the corresponding Corps of Engineers Permit Condition(s) of Certification Compensatory mitigation for 1457 linear feet of impact to streams is required We understand that you have chosen to perform compensatory mitigation for impacts to streams through the North Carolina Ecosystem Enhancement Program (EEP) and that the EEP has agreed to implement the mitigation for the project EEP has indicated in a letter dated December 20 2011 that they will assume responsibility for satisfying the federal Clean Water Act compensatory mitigation requirements for the above referenced project in accordance with the North Carolina Department of Environment and Natural Resources' Ecosystem Enhancement Program In Lieu Fee Instrument signed July 28 2010 2 Unless otherwise approved in this certification placement of culverts and other structures in open waters and streams shall be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches to allow low flow passage of water and aquatic life Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis equilibrium of wetlands or streambeds or banks adjacent to or upstream and down stream of the above structures The applicant is required to provide evidence that the equilibrium is being maintained if requested in writing by NCDWQ If this condition is unable to be met due to bedrock or other limiting features encountered during construction please contact NCDWQ for guidance on how to proceed and to determine whether or not a permit modification will be required 3 If multiple pipes or barrels are required they shall be designed to mimic natural stream cross section as closely as possible including pipes or barrels at flood plain elevation and /or sills where appropriate Widening the stream channel should be avoided Stream channel widening at the inlet or outlet end of structures typically decreases water velocity causing sediment deposition that requires increased maintenance and disrupts aquatic life passage 4 The stream channel shall be excavated no deeper than the natural bed material of the stream to the maximum extent practicable Efforts must be made to minimize impacts to the stream banks as well as to vegetation responsible for maintaining the stream bank stability Any applicable riparian buffer impact for access to stream channel shall be temporary and be revegetated with native riparian species 5 The dimension pattern and profile of the stream above and below the crossing shall not be modified Disturbed floodplains and streams shall be restored to natural geomorphic conditions For the 53 linear feet of streams being impacted due to site dewatering activities the site shall be graded to its preconstruction contours and revegetated with appropriate native species 7 Native riparian vegetation must be reestablished in the riparian areas within the construction limits of the project by the end of the growing season following completion of construction 8 The outside buffer wetland or water boundary located within the construction corridor approved by this authorization shall be clearly marked by highly visible fencing prior to any land disturbing activities Impacts to areas within the fencing are prohibited unless otherwise authorized by this certification 9 The Permittee shall report any violations of this certification to the Division of Water Quality within 24 hours of discovery 10 If concrete is used during construction a dry work area shall be maintained to prevent direct contact between curing concrete and stream water Water that inadvertently contacts uncured concrete shall not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills 11 During the construction of the project no staging of equipment of any kind is permitted in waters of the U S or protected riparian buffers 12 The use of rip rap above the Normal High Water Mark shall be minimized Any rip rap placed for stream stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life passage 13 The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings submitted for approval 14 All work in or adjacent to stream waters shall be conducted in a dry work area Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual such as sandbags rock berms cofferdams and other diversion structures shall be used to prevent excavation in flowing water 15 Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize sedimentation and reduce the introduction of other pollutants into the stream 16 All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels lubricants hydraulic fluids or other toxic materials 17 No rock sand or other materials shall be dredged from the stream channel except where authorized by this certification 18 Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited 19 State or federal law is being violated or that further conditions are necessary to assure compliance NCDWQ may reevaluate and modify this certification 20 All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3 1 unless otherwise authorized by this certification 21 A copy of this Water Quality Certification shall be maintained on the construction site at all times In addition the Water Quality Certification and all subsequent modifications if any shall be maintained with the Division Engineer and the on site project manager 22 The issuance of this certification does not exempt the Permittee from complying with any and all statutes rules regulations or ordinances that may be imposed by other government agencies (i e local state and federal) having jurisdiction including but not limited to applicable buffer rules stormwater management rules soil erosion and sedimentation control requirements etc 23 Erosion and sediment control practices must be in full compliance with all specifications governing the proper design installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards a The erosion and sediment control measures for the project must be designed installed operated and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual b The design installation operation and maintenance of the sediment and erosion control measures must be such that they equal or exceed the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual The devices shall be maintained on all construction sites borrow sites and waste pile (spoil) projects including contractor owned or leased borrow pits associated with the project C For borrow pit sites the erosion and sediment control measures must be designed installed operated and maintained in accordance with the most recent version of the North Carolina Surface Vining Manual d The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act 24 Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by this Certification 25 Upon completion of the project (including any impacts at associated borrow or waste sites) the NCDOT Division Engineer shall complete and return the enclosed Certification of Completion Form to notify NCDWQ when all work included in the 401 Certification has been completed 26 There shall be no excavation from or waste disposal into jurisdictional wetlands or waters associated with this permit without appropriate modification Should waste or borrow sites or access roads to waste or borrow sites be located in wetlands or streams compensatory mitigation will be required since that is a direct impact from road construction activities Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and /or civil penalties This Certification shall become null and void unless the above conditions are made conditions of the Federal 404 and/or Coastal Area Management Act Permit This Certification shall expire upon the expiration of the 404 or CAMA permit If you wish to contest any statement in the attached Certification you must file a petition for an administrative hearing You may obtain the petition form from the office of Administrative hearings You must file the petition with the office of Administrative Hearings within sixty (60) days of receipt of this notice A petition is considered filed when it is received in the office of Administrative Hearings during normal office hours The Office of Administrative Hearings accepts filings Monday through Friday between the houis of 8 00am and 5 OOpm except for official state holidays The original and one (1) copy of the petition must be filed with the Office of Administrative Hearings The petition may be faxed provided the original and one copy of the document is received by the Office of Administrative Hearings within five (5) business days following the faxed transmission The mailing address for the Office of Administrative Hearings is Office of Administrative Hearings 6714 Mail Service Center Raleigh NC 27699 6714 Telephone (919) 733 2698 Facsimile (919) 733 3478 A copy of the petition must also be served on DENR as follows Ms Mary Penny Thompson General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh NC 27699 1601 This the 3rd day of January 2012 DIVISION OF WATER QUALITY tvv�Charles Wakild P E Director WQC No 3874 NCDWQ Project No Applicant Project Name Date of Issuance of 401 Water Quality Certification County Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules and any subsequent modifications the applicant is required to return this certificate to the 401 Transportation Permitting Unit North Carolina Division of Water Quality 1650 Mail Service Center Raleigh NC 27699 1650 This form may be returned to NCDWQ by the applicant the applicant s authorized agent or the project engineer It is not necessary to send certificates from all of these Applicant's Certification I hereby state that to the best of my abilities due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules the approved plans and specifications and other supporting materials Signature Date Agent s Certification I hereby state that to the best of my abilities due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules the approved plans and specifications and other supporting materials Signature Engineer's Certification Date Partial Final I as a duly registered Professional Engineer in the State of North Carolina having been authorized to observe (periodically weekly full time) the construction of the project for the Permittee hereby state that to the best of my abilities due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules the approved plans and specifications and other supporting materials Signature Date Registration No