Loading...
HomeMy WebLinkAboutNCC201478_NOT Closeout Documents_20210201North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center, Raleigh, NC 27699 (919) 791-4200 County: Wake Project: Wakefield H.S. Track Replacement River basin: Neuse Person financially responsible: Wake Co. BOE - David Neter Project #: WAKE-2020-045 Address: 5626 Dillard Drive, Crossroads Bldg. 1, Cary, NC 1. Project Location: Wakefield Pines Drive, Raleigh Pictures: No 2. Weather and soil conditions: sunny, dry, workable 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: Initial inspection: Yes If no, check violations below: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): no one on site Title: Inspection report: Sent Report Date given/sent: November 04, 2020 9. Corrective action needed: 10. Comments: Project is complete and site is substantially in compliance, Close file. Reported by: Kimberly Summers Others present: Joe Dupree Date of inspection: November 02, 2020 Time arriving on site: 9:20 AM Time leaving site: 9:25 AM cc: Yes