HomeMy WebLinkAbout20210005 Ver 1_PreFiling Email 30-Day Clock Reached Email_20210131Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Sunday, January 31, 2021 12:01 AM
To: foggymtn@skybest.com
Cc: Homewood, Sue
Subject: Pre -Filing Time Clock has been reached for Aganad Project - 20210005 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Aganad Project
that you submitted on 12/31/2020. The ID number for that project is 20210005, Version 1.
Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be
accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses are not monitored.
ID#* 20210005
Version* 1
Regional Office* Winston-Salem Regional Office - (336) 776-9800
Reviewer List* Sue Homewood
Pre -Filing Meeting Request submitted 12/31/2020
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Glen Sullivan
foggymtn@skybest.com
Aganad Project
Vince Aganad
Ashe
Street Address
422 Green Meadows Drive
Address Line 2
aty
Todd
Fbstal / Zip Code
28684
Is this a transportation project?* r Yes r No
State / Province / Region
NC
Country
United States
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Sue Homewood
Please give a brief project description below.
To repair and stabilize eroding banks by re-establishing proper bank
profiles through bank reshaping and with 1 in -stream structure and to
improve water quality. To improve habitat for aquatic fauna and to
improve the overall condition of the riparian areas at the site.
Eroding banks will be reshaped to approximately 2:1, or flatter and
planted with native vegetation. One (1) rock vane will be constructed
to divert the thalwag back to the center of the stream. During
construction a track hoe will do the work from the bank, although the
track hoe may have to access the stream to construct the end of the
rock vanes. After construction the bank will be seeded with native
grass seed and sloped bank will be covered with erosion control
matting and anchored with live stakes and landscape staples. Flat
areas will be seeded and mulched with straw. All areas will be planted
with live stakes (Silky Willow, Salix Sericea) (Silky Dogwood, Corpus
amomum) (Elderberry, Sambucus canadensis) along with native
rhododendron mtn laurel and riverbirch
Please give a couple of dates you are available for a meeting.
Please attach the documentation you would like to have the meeting about.
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 12/31/2020