Loading...
HomeMy WebLinkAbout20210205 Ver 1_PreFiling Acknowledgement Email_20210129Strickland, Bev From: laserfiche@ncdenr.gov Sent: Friday, January 29, 2021 3:35 PM To: MMeasday@ecslimited.com Cc: Yankura, Kaylie Subject: Pre -Filing Meeting Request Acknowledgement - Tap Root Subdivision - 20210205 Ver Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Tap Root Subdivision that you submitted on 1/29/2021. The ID number for that project is 20210205, Version 1. Reviewer Contact Information: Reviewer: Kaylie Yankura Email: kaylie.yankura@ncdenr.gov Reviewing Office: Asheville Regional Office - (828) 296-4500 You will either be contacted by staff to set up a meeting or notified by email that the 30 calendar day clock has been reached and you are allowed to submit your application. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. ID#* 20210205 Version* 1 Regional Office* Asheville Regional Office - (828) 296-4500 Reviewer List* Kaylie Yankura Pre -Filing Meeting Request submitted 1/29/2021 .............................................................................................................................................................................................................................................. Contact Name * Michelle Measday Contact Email Address* MMeasday@ecslimited.com Project Name* Tap Root Subdivision Project Owner* Tap Root, LLC Project County* Henderson Owner Address: Street Address PO Box 1157 Address Line 2 aty State / Province / Region Arden NC Fbstal / Zip Code Country 28704 United States Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? No Please give a brief project description below. The project is a 699-unit single family residential development on 320 acres located at 269 Tap Root Road, Fletcher, Henderson County, NC. The project includes the construction of 699 SFR, neighborhood amenity center, stormwater management measures, landscaping, lighting and utility improvements. The proposed limit of disturbance is approximately 152-acres. Approximately 187-LF of permanent impacts to jurisdictional waters for road crossing, 17-LF temporary impacts to jurisdictional waters for sanitary sewer installation and ,0.010-acres of temporary impacts to jurisdictional wetland for sanitary sewer installation. Please give a couple of dates you are available for a meeting. 2/12/2021 2/11 /2021 2/15/2021 2/16/2021 2/17/2021 Please attach the documentation you would like to have the meeting about. 2021-1-13 Existing Conditions.pdf 8.58MB 2021-1-13 Proposed SA Impact.pdf 247.29KB 2021-1-13 Proposed SIB Impact.pdf 254.97KB 2021-1-13 Proposed SC Impact.pdf 332.91KB 2021-1-13 Proposed WA Impact.pdf 250.52KB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 1/29/2021