Loading...
HomeMy WebLinkAboutNC0020401_Compliance Evaluation Inspection_20210119ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH NORTH CAROLINA Director Environmental Quality January 19, 2021 Shawn Pennell, Public Utilities Director City of Hickory Post Office Box 398 Hickory, North Carolina 28603-0398 Subject: Compliance Evaluation Inspection City of Hickory -Northeast WWTP NPDES Permit No. NC0020401 Catawba County Dear Mr. Pennell: Enclosed is a copy of the Compliance Evaluation Inspection Report for the inspection conducted at the subject facility on January 12, 2021, by Mr. Wes Bell of this Office. Please inform the facility's Operator -in -Responsible Charge (ORC) of our findings by forwarding a copy of the enclosed report. Should you have any questions concerning this letter, please do not hesitate to contact Mr. Bell at (704) 235- 2192, or via email at wes.bell@ncdenr.gov. Enclosure: Inspection Report D_E NORTH CAROLINA Department el EnNrumimbl Qualpy Sincerely, DocuSigned by: \—A14CC681AF27425... W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ North Carolina Department of Environmental Quality I Division of Water Resources Mooresville Regional Office 1610 East Center Avenue, Suite 301 I Mooresville, North Carolina 28115 704.663.1699 United States Environmental Protection Agency EPA Washington, D.C. 20460 Water Compliance Inspection Report Form Approved. OMB No. 2040-0057 Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code 1 IN I 2 IL I 21 1 1 1 1 1 1 NPDES yr/mo/day Inspection 3 I NC0020401 111 121 21/01/12 117 Type 18 i i I I 1 1 1 Inspector Fac Type 191 S I 201 1 1 1 11 1 1 1 I I I 1 1 1 1 1 1 I I I I I 1 11 1 1 1 I 1 P6 Inspection Work Days 67I2.0 Facility Self -Monitoring Evaluation Rating B1 QA Reserved I 70I4 I 71IN I 72 I N I 731 I 74 751 I I 1 I I I I I I 180 l Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES oermit Number) Northeast WWTP 310 Cloninger Mill Rd Hickory NC 28601 Entry Time/Date 09:05AM 21/01/12 Permit Effective Date 16/11/01 Exit Time/Date 10:35AM 21/01/12 Permit Expiration Date 20/04/30 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) /// Keith Douglas Rhyne/ORC/828-322-5075/ Other Facility Data Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Warren Wood,PO Box 398 Hickory NC 286010398/City Manager/828-323-7412/ No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit Flow Measurement Operations & Maintenar Records/Reports Self -Monitoring Progran Sludge Handling DispoFacility Site Review Effluent/Receiving Wate Laboratory Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) Wes Bell of Inspector(s) Agency/Office/Phone and Fax Numbers Date —Docusigned by: DWR/MRO WQ/704-663-1699 Ext.2192/ 10&,- Bdt 1/19/2021 '-A61696D90CC3437... Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date W. Corey Basinger DWR/Division of Water Quality/704-235-2194/ EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. DocuSigned by: 1/19/2021 A14CC681AF27425... Page# 1 NPDES yr/mo/day 31 NC0020401 111 121 21 /01 /12 I17 Inspection Type 18 [j 1 Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Page# 2 Permit: NC0020401 Inspection Date: 01/12/2021 Owner - Facility: Northeast WWTP Inspection Type: Compliance Evaluation Permit (If the present permit expires in 6 months or less). Has the permittee submitted a new application? Is the facility as described in the permit? # Are there any special conditions for the permit? Is access to the plant site restricted to the general public? Is the inspector granted access to all areas for inspection? Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ Comment: The Division received the facility's permit renewal application on 11/6/2019. The City implements a Division -approved Industrial Pretreatment Program. The last compliance evaluation inspection at this facility was performed by DWR staff on 12/5/2018. Record Keeping Are records kept and maintained as required by the permit? Is all required information readily available, complete and current? Are all records maintained for 3 years (lab. reg. required 5 years)? Are analytical results consistent with data reported on DMRs? Is the chain -of -custody complete? Dates, times and location of sampling Name of individual performing the sampling Results of analysis and calibration Dates of analysis Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • • Name of person performing analyses • Transported COCs • Are DMRs complete: do they include all permit parameters? • ❑ ❑ ❑ Has the facility submitted its annual compliance report to users and DWQ? • ❑ ❑ ❑ (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operatc • ❑ ❑ ❑ on each shift? Is the ORC visitation log available and current? • ❑ ❑ ❑ Is the ORC certified at grade equal to or higher than the facility classification? • El El El Is the backup operator certified at one grade less or greater than the facility classification' • ❑ ❑ ❑ Is a copy of the current NPDES permit available on site? • ❑ ❑ ❑ Facility has copy of previous year's Annual Report on file for review? ❑ ❑ ❑ • Comment: The records reviewed during the inspection were organized and well maintained. Discharge Monitoring Reports (eDMRs) were reviewed for the period December 2019 through November 2020. No effluent limit violations were reported and all monitoring frequencies were correct. Page# 3 Permit: NC0020401 Inspection Date: 01/12/2021 Owner - Facility: Northeast WWTP Inspection Type: Compliance Evaluation Record Keeping Laboratory Are field parameters performed by certified personnel or laboratory? Are all other parameters(excluding field parameters) performed by a certified lab? # Is the facility using a contract lab? # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)? Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees? Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees? Yes No NA NE Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Comment: Influent and effluent analyses are performed under the City of Hickory's certification #203. Pace Analytical Services, Blue Ridge Labs and ETT also been contracted to provide analytical support. Influent Sampling # Is composite sampling flow proportional? Is sample collected above side streams? Is proper volume collected? Is the tubing clean? # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)? Is sampling performed according to the permit? municipal laboratory Environmental have Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ▪ I=1 El El Comment: The subject permit requires influent BOD and TSS composite samples. Monthly sampler aliquot checks are performed and documented. Effluent Sampling Is composite sampling flow proportional? Is sample collected below all treatment units? Is proper volume collected? Is the tubing clean? # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)? Is the facility sampling performed as required by the permit (frequency, sampling type representative)? Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ▪ ❑ ❑ ❑ • ❑ ❑ ❑ Comment: The subject permit requires composite and grab effluent samples. Monthly sampler aliquot checks are performed and documented. Page# 4 Permit: NC0020401 Inspection Date: 01/12/2021 Owner - Facility: Northeast WWTP Inspection Type: Compliance Evaluation Upstream / Downstream Sampling Yes No NA NE Is the facility sampling performed as required by the permit (frequency, sampling type, anc • ❑ ❑ ❑ sampling location)? Comment: Operations & Maintenance Is the plant generally clean with acceptable housekeeping? Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable Solids, pH, DO, Sludge Judge, and other that are applicable? Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ Comment: The wastewater treatment facility appeared to be properly operated and well maintained. The ORC and staff incorporate a comprehensive process control program with all measurements being documented and maintained on -site. In-depth operation and maintenance records were also being maintained on -site. The facility is equipped with a SCADA System that is accessible at multiple locations throughout the wastewater facility. The odor control systems for the influent pump station, grit removal building, RAS/VVAS pump building, scum/sludge storage tank and sludge thickening building were all operationa Bar Screens Type of bar screen a.Manual b.Mechanical Are the bars adequately screening debris? Is the screen free of excessive debris? Is disposal of screening in compliance? Is the unit in good condition? Comment: Flow Measurement - Influent # Is flow meter used for reporting? Is flow meter calibrated annually? Is the flow meter operational? (If units are separated) Does the chart recorder match the flow meter? Yes No NA NE • • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ▪ ❑ ❑ ❑ Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ • ❑ Comment: The flow meter is calibrated twice per year and was last calibrated on 8/8/2020 by Diversified Integration, Inc. Pump Station - Influent Is the pump wet well free of bypass lines or structures? Is the wet well free of excessive grease? Yes No NA NE • ❑ ❑ ❑ ▪ ❑ ❑ ❑ Page# 5 Permit: NC0020401 Inspection Date: 01/12/2021 Owner - Facility: Northeast WWTP Inspection Type: Compliance Evaluation Pump Station - Influent Are all pumps present? Are all pumps operable? Are float controls operable? Is SCADA telemetry available and operational? Is audible and visual alarm available and operational? Comment: Grit Removal Type of grit removal a.Manual b.Mechanical Is the grit free of excessive organic matter? Is the grit free of excessive odor? # Is disposal of grit in compliance? Comment: Screenings and grit are disposed at the County Landfill by City personnel. Oxidation Ditches Are the aerators operational? Are the aerators free of excessive solids build up? # Is the foam the proper color for the treatment process? Does the foam cover less than 25% of the basin's surface? Is the DO level acceptable? Are settleometer results acceptable (> 30 minutes)? Is the DO level acceptable?(1.0 to 3.0 mg/I) Are settelometer results acceptable?(400 to 800 ml/I in 30 minutes) Secondary Clarifier Is the clarifier free of black and odorous wastewater? Is the site free of excessive buildup of solids in center well of circular clarifier? Are weirs level? Is the site free of weir blockage? Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ • ❑ Yes No NA NE • • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Yes No NA NE • • • • • • • • ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Each oxidation oxide is also Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ▪ ❑ ❑ ❑ Page# 6 Comment: One of two oxidation ditch trains was in service due to low influent flows. ditch train is equipped with an anaerobic and anoxic basin. Sodium hydr available to maintain alkalinity/pH levels if needed. Permit: NC0020401 Inspection Date: 01/12/2021 Owner - Facility: Northeast WWTP Inspection Type: Compliance Evaluation Secondary Clarifier Yes No NA NE Is the site free of evidence of short-circuiting? Is scum removal adequate? Is the site free of excessive floating sludge? Is the drive unit operational? Is the return rate acceptable (low turbulence)? Is the overflow clear of excessive solids/pin floc? Is the sludge blanket level acceptable? (Approximately'/4 of the sidewall depth) Comment: All three secondary clarifiers were in service. Pumps-RAS-WAS Are pumps in place? Are pumps operational? Are there adequate spare parts and supplies on site? Comment: Disinfection -Gas Are cylinders secured adequately? Are cylinders protected from direct sunlight? Is there adequate reserve supply of disinfectant? Is the level of chlorine residual acceptable? Is the contact chamber free of growth, or sludge buildup? Is there chlorine residual prior to de -chlorination? Does the Stationary Source have more than 2500 Ibs of Chlorine (CAS No. 7782-50-5)? If yes, then is there a Risk Management Plan on site? If yes, then what is the EPA twelve digit ID Number? (1000- If yes, then when was the RMP last updated? • ❑ ❑ ❑ • ❑ ❑ ❑ Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ • ❑ ❑ ❑ • ❑ Comment: Two of the three chlorine contact chambers were in service. The ORC must ensure that all non -potable water is directed back into the non -potable pump tank and not sprayed onto the ground during activation for on -site activities. De -chlorination Yes No NA NE Type of system ? Gas Is the feed ratio proportional to chlorine amount (1 to 1)? • ❑ ❑ ❑ Is storage appropriate for cylinders? • ❑ ❑ ❑ Page# 7 Permit: NC0020401 Inspection Date: 01/12/2021 Owner - Facility: Northeast WWTP Inspection Type: Compliance Evaluation De -chlorination Yes No NA NE # Is de -chlorination substance stored away from chlorine containers? • ❑ ❑ ❑ Comment: Are the tablets the proper size and type? ❑ ❑ • ❑ Are tablet de -chlorinators operational? ❑ ❑ • ❑ Number of tubes in use? Comment: Effluent Pipe Is right of way to the outfall properly maintained? Are the receiving water free of foam other than trace amounts and other debris? If effluent (diffuser pipes are required) are they operating properly? Comment: The effluent appeared clear with trace suspended solids and no foam. Solids Handling Equipment Is the equipment operational? Is the chemical feed equipment operational? Is storage adequate? Is the site free of high level of solids in filtrate from filter presses or vacuum filters? Is the site free of sludge buildup on belts and/or rollers of filter press? Is the site free of excessive moisture in belt filter press sludge cake? The facility has an approved sludge management plan? Yes No NA NE ❑ ❑ • ❑ Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ ❑ • • ❑ ❑ ❑ Comment: The facility is equipped with two gravity belt thickeners (both operational). however, the unitE were not in service. Thickened sludge is transported by City personnel to the Regional Compost Facility for continued processing/treatment. Standby Power Is automatically activated standby power available? Is the generator tested by interrupting primary power source? Is the generator tested under load? Was generator tested & operational during the inspection? Do the generator(s) have adequate capacity to operate the entire wastewater site? Is there an emergency agreement with a fuel vendor for extended run on back-up power? Is the generator fuel level monitored? Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ Page# 8 Permit: NC0020401 Inspection Date: 01/12/2021 Owner - Facility: Northeast WWTP Inspection Type: Compliance Evaluation Standby Power Yes No NA NE Comment: The facility is equipped with two backup generators (1-main plant and 1-influent pump station). The generators are tested (not under load) weekly and placed under load monthly. Page# 9