HomeMy WebLinkAbout310012_5 day poa_20210201PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 31-12 County: Duplin
Facility Name: MR Whaley
Certified Operator Name: Greg Brown
Operator Number: 19631
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
Lagoon Name/ID: MW1 MW2 MW3
Spillway(Y or N): no no no
Level(inches): 7 8 7
2. Check all applicable items
XXXX Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
2/2/2021 Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 2/5/2021
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
MR Whaley AJ Linton Tech Spec.
Facility Owner/Manager (print)
ay14.4,1t00-1,
Facility Owner/Manager (signature)
Phone: 910-290-1042
Date: 2/1/2021
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
FIVE (5) DAY DRAW DOWN PERIOD
I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID):
MW1
2. Current liquid volume in structural freeboard
a. current liquid level according to marker
b. designed structural freeboard zone
(Normally 12 inches or greater)
c. line b - line a (inches within structural freeboard) =
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
g. volume of waste produced according to structural design
h. current herd #
0
certified herd #
7.0
19.5
inches
inches
12.5 inches
46331
ft2
360996 gallons
180
40880
1240
days
ft3
actual waste produced = current herd # x line g = fti
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 5 days/line f =
4. Total volume of waste to be land applied during 5 day draw down
I. total volume to be land applied line e + line k =
0
27026
ft3
ft3
5615 gallons
366611 gallons
REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN
THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below)
PoA (5 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
FIVE (5) DAY DRAW DOWN PERIOD
I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID):
MW2
2. Current liquid volume in structural freeboard
a. current liquid level according to marker
b. designed structural freeboard zone
(Normally 12 inches or greater)
c. line b - line a (inches within structural freeboard) =
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
g. volume of waste produced according to structural design
h. current herd #
3600
certified herd #
8.0
19.5
inches
inches
11.5 inches
96001
ft2
688167 gallons
180
118684
3600
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 5 days/line f =
4. Total volume of waste to be land applied during 5 day draw down
I. total volume to be land applied line e + line k =
days
ft3
118684 fti
0
56000
ft3
ft3
36295 gallons
724463 gallons
REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN
THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below)
PoA (5 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
FIVE (5) DAY DRAW DOWN PERIOD
I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID):
MW3
2. Current liquid volume in structural freeboard
a. current liquid level according to marker
b. designed structural freeboard zone
(Normally 12 inches or greater)
c. line b - line a (inches within structural freeboard) =
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
g. volume of waste produced according to structural design
h. current herd #
3600
certified herd #
7.0
19.5
inches
inches
12.5 inches
96800
ft2
754233 gallons
180
118684
3600
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 5 days/line f =
4. Total volume of waste to be land applied during 5 day draw down
I. total volume to be land applied line e + line k =
days
ft3
118684 fti
0
56466
ft3
ft3
36392 gallons
790626 gallons
REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN
THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below)
PoA (5 Day) 2/21/00
II. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS
FOR ALL WASTE STRUCTURES FOR FACILITY
1. structure ID:
2. structure ID:
3. structure ID:
MW1
MW2
MW3
n. lines 1 +2+3+4+5+6=
o. line n / 27154 =
line I = 366611 gallons
line I = 724463 gallons
line I = 790626 gallons
1881699 gallons
69.30 acre -inches
III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD"
1While this section deals with hydraulic loading capacities, applications cannot exceed
agronomic rate for receiving crop according to its certified waste plan.
2Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are
not considered available to receive waste.
p. tract #
q. field #
r. soil type
s. crop
t. acres
u. remaining
IRR-2 PAN
balance
(lb/acre)
v. maximum
application rate
(in/hr)
w. maximum
application
amount (inches)
71100
p10
Goldsboro
Small Grain
3.89
9.00
0.4
1
71100
p9
Goldsboro
Small Grain
3.63
6.00
0.4
1
71100
p8
Goldsboro
Small Grain
1.88
50.00
0.4
1
71100
p5
Goldsboro
Small Grain
3.30
50.00
0.4
1
71100
p6
Goldsboro
Small Grain
2.75
50.00
0.4
1
71100
p7
Goldsboro
Small Grain
3.40
50.00
0.4
1
Jackson
F 1
Noboco
cover
7.00
30
0.5
1
Jackson
F2
Noboco
cover
13.50
30
0.5
1
Jackson
F3
Noboco
cover
6.30
30
0.5
1
x. total acres available during 5 day draw down (sum of column t) =
45.65 acres
IV. FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE
Y. line o = 1.52 inches per acre to be applied within 5 days
line x
If unable to land apply hydraulic load listed in line y, list course of action here including pump
and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options,
recalculate new hydraulic load based on new information.
We plan to begin land application as soon as the weather clears but no later than 2/5/21.
PoA (5 Day) 2/21/00
Plan to land apply hydraulic load:
1. Describe moisture conditions of fields? (e.g. Is there water standing in field; does irrigation
equipment mar down in field; "trafficability" across soils; will soils absorb application without runoff, etc.)
The fields remain wet and equipment cannot stand in the field.
2. Date and amount of last rainfall event?
DATE:
3. Dates of last waste application event per field:
01 /31 /21
AMOUNT:
2.00
inches
R1: 1/20/21
4. Given optimum soil and weather conditions, is irrigation equipment capable of applying the volume in
line "n" at appropriate seasonal (i.e. winter) application rates within 5 days?
Yes the farm has the available equipment to apply the water.
5. Irrigation schedule for next 5 days - include daily schedule; proposed application rates and amounts
per irrigation event; changes made in gun sizes, nozzles, "o" rings, operating time, travel speed, etc. to
meet proposed changes in application rates and amounts; and any other information for consideration.
The farm will apply the required water at or below the .4 acre inch/hour. We plan to begin application as soon
as the weather clears and the fileds can hold water.
PoA (5 Day) 2/21/00