HomeMy WebLinkAbout20110823 Ver 1_Certification of Completion_20111206DWQ Project No
Apphcant
Project Name
Certificate of Completion
11 -0823
Lt Gen Frank Panter
Shoreline Stabilization
Date of Issuance of 401 Water Quality Certification
County Gaston
Sept 13,2011
J@@20YR
D
DEC - 6 2011
DENR WATER QUALITY
KnMDS AND STORMWATER 8WH
Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules,
and any subsequent modifications, the applicant is required to return this certificate to the
401 /Wetlands Unit, North Carolina Division of Water Quality 1650 Mail Service Center Raleigh
NC 27699 1650 This form may be returned to DWQ by the applicant, the applicant's authorized
agent, or the project engineer It is not necessary to send certificates from all of these
Applicant's Certification
I, hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to
built within substantial compliance and intent of the 401 Water Quality Certification and Buffer
Rules the approved plans and specifications and other supporting materials
Signature
Agent's Certification
Date
I David Frick , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to
built within substantial compliance and intent of the 401 Water Quality Certification and Buffer
Rules, the approved plans d specifications, and other supporting materials
Signature Date 3
If this project was designed by a Certified Professional
I, , as a duly registered Professional
(i a Engineer, Landscape Architect, Surveyor, etc ) in the State of North Carolina, having been
authorized to observe (periodically, weekly, full time) the construction of the protect, for the
Permrttee hereby state that, to the best of my abilities due care and diligence was used in the
observation of the construction such that the construction was observed to built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules the approved plans
and specifications and other supporting materials
Signature Registration No Date