HomeMy WebLinkAboutCaldwell 29 - Bridge FSM Worksheet
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION
FIELD SCOPING MEETING WORKSHEET
WBS No.: BP11.R001.1 Field Scoping Meeting Date: January 28, 2021
Division: 11 Location: On-Site
Route (US/NC/SR): NC 268 County: Caldwell
Project Description: Bridge No.130029 on NC 268 over Yadkin River
Tier: Regional
Municipality: near Lenoir
Attendees
Name Phone No. E-mail
Division Bridge Manager Joe Laws jlaws@ncdot.gov
Assistant Bridge Program Mark Johnson mgjohnson4@ncdot.gov
Manager
Division Construction *Trent Beaver tbeaver@ncdot.gov
Engineer
Division Construction Staff Greg Johnston gjohnston@ncdot.gov
Engineer
Boone District Engineer *Randall Miles rsmiles@ncdot.gov
Utility Coordinator *Susan Huffman sohuffman@ncdot.gov
Environmental Officer Kevin Hining kjhining@ncdot.gov
Division Maintenance *Charles Reinhardt creinhardt@ncdot.gov
Engineer
Division R/W Agent Daneil Miles
d miles@ncdot.gov
Locations & Survey *Larry Absher lrabsher@ncdot.gov
NCDOT Hydraulics Unit Marc Shown mshown@ncdot.gov
NCDOT Hydraulics Unit *Jon Moore jlmoore6@ncdot.gov
NCDOT SMU *Keith Paschal kpaschal@ncdot.gov
NCDOT GEU *Dean Hardister dhardister@ncdot.gov
FWS *Janet Mizzi/Holland janet_mizzi@fws.gov
Youngman holland_youngman@fws.gov
USACE *Lori Beckwith Loretta.A.Beckwith@usace.army.mil
NC WRC *Marla Chambers marla.chambers@ncwildlife.org
NCDWR *Dave Wanucha dave.wanucha@ncdenr.gov
1 of 6
TGS Jimmy Terry jterry@tgsengineers.com
TGS Leonard Fletcher lfletcher@tgsengineers.com
Jay Twisdale jtwisdale@tgsengineers.com
TGS
TGS *Randy Henegar rhenegar@tgsengineers.com
CG2 Matt Brewer mbrewer@carolinasgeotech.com
Telics Patrick Jones patrickjones@telics.com
*Invited but could not attend.
2 of 6
Existing Features
Feature Bridged: 130029 over Yadkin River on NC 268
Ex. Bridge Clear Deck Width: 19 (Ft.) Roadway width: 16 (Ft.)
(Bridge / Culvert) Length: 161 (Ft.) Deck Width (Out To Out): 20 (Ft.)
Water Depth: (Ft.) Height Bed-To-Crown: (Ft.)
Year Built: 1940/Reconstructed 1980 Posted: SV 34 TTST: 39
Superstructure: Timber Floor on Abutment: Reinforced Pier Type: Reinforced
Concrete Spill Thru Concrete Post & Beam
I-Beams
Temp. Shored: No
Historic High Water (Elev. To The Existing Structure ): Ft.
PRI: DP: SR: 55.24 School Bus crossings per day:
Posted Speed Limit Vicinity: 45 mph
Detour Off-Site Stage Construction New Alignment On-site One lane
Staged to upstream temporary bridge is
side if feasible. option.
If Off-Site, Description Of Detour Route:
Approximate Length Of Detour?
Improvements Needed To Road(s) On Detour ?
Div. Traffic Eng. Recommend Off-site detour signing?
Improvements Needed To Bridges On Detour?
Are future plans for upgrading this roadway either at or in the vicinity of this project?
Are Bridges On Detour Currently Programmed ?
Are There EMS Or Business Access Issues ?
Are There Any Railroad Crossings On Detour?
Should Work Zone Pedestrian Access Be Maintained During Construction? N/A
Overhead Utility Lines In Conflict Yes
Power Transmission Lines In Conflict
Telephone In Conflict Yes
Cable Lines In Conflict Yes
Fiber Optic In Conflict
Water In Conflict
Sewer In Conflict
Natural Gas In Conflict
Other In Conflict
Is There Any Future Utility Construction Anticipated In The Project Area?
Is a FEMA Buy-Out Property Being Impacted: No
3 of 6
Environmental
Wetlands At Site: Comments:
Endangered Species In County: Carolina northern flying squirrel; Gray Bat; Virginia big-
eared bat; Spruce-fir moss spider; Roan Mountain Bluet
T&E species effect:
Trout County : Yes TVA County: No
CAMA County; No Primary Nursery Area: No
Moratoria: No Which species: Trout Duration :
Water Quality Classification: C; TR 303d: No
Coast Guard Permit? No Drainage Basin: Yadkin PeeDee Riparian Buffer Rules: No
Is The Project Site In Or Near Any Of The Following:
National Forest: No Wildlife Refuge/Gamelands: No
State, County, Or Local Park: No Wild And Scenic River: No
Airport: No Recreation Or Power Generation: No
Water Supply Reservoir: No Nutrient Sensitive Waters: No
Public Use Boat Ramp: No Cemeteries: No
VAD-Farmland Preservation:Yes (Prime
Farmland)
Known Or Potential Historic Properties In The Area:
Architecture: Archaeology:
Is The Bridge Structure Itself, Or Any Part Thereof, Considered Historic: No
Impacts to a Church, Community Center, Or Other Public Facility? No
Is this a Statewide Bicycle Route or a Local Non-Marked Bicycle Route:
Comments:
Geotechnical
Are There Any Historical and/or Vibration Sensitive Structures Nearby: Yes
Comments: House nearby.
Are There Any Known Landfills And / Or Geo-environmental Hazard Sites At Or Within Close
Proximity To The Project Site? No
Comments:
Are Any Impacts Anticipated To Natural Springs Or Artesian Wells: No
Comments:
Possible Foundation Type: H-Piles at the end bents and drilled shafts for interior bent(s)
4 of 6
Hydraulics
FEMA Approval? Yes State Storm water Permit? N/A
Is There Unusual Scour Potential? No Is Protection Needed? STD
Are Banks Stable? Yes Is Protection Needed? STD
Appreciable Amount Of Large Debris? Yes
Placement Of Bents In The Water Be Allowed: Yes Where:
Superstructure Type: Bridge If Bridge: 33” BB If girder; why?
Length Of Structure: 170’ Min. Number Of Spans: 3 Span Arrangement: 1@50,1@70,1@50
Waive offset: No Cap: 4’ Skewed: Yes, 75 degrees
Comments: Spill through abutments.
Items To Be Discussed / Resolved At FSM By Attendees
Off-Site Detour Stage: New Alignment: On-site detour
CRW:
Clear roadway width (CRW): 15’
one lane w/ signals;
Alignment; N, E, W, S
Temp. Signals: Yes
Alignment: W
Environmental Document Prepared by DBE: Low Impact Data Spreadsheet Minimum Criteria Checklist
ADT: 650 per Maps NHS: No Tier: Regional Func. Class: Major Collector
Bridge Min. Clear Deck Width Recommended by Div.: 36’ OTO?
Roadway lane width _12_‘ with _8_‘ turf shoulders 4’ Paved
Pave to face of guardrail and taper 8:1 to travel lane/paved shoulder? Yes
Min. Pavement Surface Course: inches: Existing Roadway: Paved
Pavement Marking: Paint Pavement markers: Yes
Will Railroad Involvement Be Required: No Method of Clearing: Method II
Truck Percentage: 7 % per BIR Reasonable Safe Speed per SIR:
Liquidated damages: will be imposed after days of closure/construction. Amt: $ per day
CEI by? NCDOT R/W by? NCDOT R/W monuments? Pin/Caps
Salvageable materials: I-Beams
Contact Person/number: Andrew Glasko 336-903-9198
Deliver to: 303 Statesville Road, North Wilkesboro
Removal of previous structure remnant abutments/piers:
Comments: NCDOT to provide pavement design.
Permanent Easement or R/W to be placed outside of fill slopes for maintenance (min. 15’)
5 of 6
Minimize impacts to home/property in SW quadrant.
Investigate two options (stage construction or temporary bridge)
Structure Design Unit to confirm if cored slabs can be used with concrete overlay. FEMA
100 year flood overtops by 2’, so minimizing superstructure depth may be essential.
Design team to contact bike/ped group.
6 of 6