HomeMy WebLinkAbout20120615 Ver 1_DWR RAI Response Mayo IP Modification Application_20201211 1 Mr. Rick Trone December 11, 2020 401 & Buffer Permitting Branch NCDEQ – Division of Water Resources 1617 Mail Service Center, Raleigh, NC 27699-1617 RE: Response to Request for Additional Information DWR # 20120615v3 Duke Energy Mayo Steam Electric Plant - Ash Basin Landfill Project Person County, North Carolina Dear Mr. Trone: Duke Energy, in consultation with Wood Environment & Infrastructure Solutions, Inc. (Wood), submitted a request for modification of the existing U.S. Army Corps of Engineers (USACE) Individual Permit (IP) (SAW-2011-00181) for the Mayo Steam Electric Plant to the Raleigh Regulatory Field Office of the USACE. The submittal package and supporting documents for the IP modification were also provided to the North Carolina Department of Environmental Quality (NCDEQ) Division of Water Resources (DWR) along with a request for a 401 Individual Water Quality Certification for the Ash Basin Landfill Project. DWR re ceived the certification request and supporting documents on October 26, 2020. Subsequent to review, DWR submitted three requests for additional information (RAI) to Duke Energy in correspondence dated December 4, 2020. The RAIs are recounted herein for discussion purposes. Duke Energy’s respective responses to the RAIs are presented below along with the enclosures for DWR’s consideration of a 401 Individual Water Quality Certification for the Ash Basin Landfill Project. Item Number 1 Please provide additional details on placement of Borrow Pit 3 and the haul road. Specifically, explain why the pit and the haul road cannot be reconfigured to avoid or minimize impacts to Streams 9 and 10. Figures provided in the application depict the haul road routed through Borrow Pit 3. Please explain how the road will remain in this loc ation after construction of Borrow Pit 3. Please provide detailed plan/profile drawings for these impacts. [15A NCAC 02H .0506(b)(1)] Response The limits of disturbance (LOD) depicted on the referenced figure are representative of both haul road and ash basin closure related actions. These LOD lines could lead to conflicting interpretation and have been updated to clarify the LOD bounds for the proposed project ; please see the enclosed plan sheet (Q-R 1). Impacts to Streams 9 and 10, as well as Wetlands LLL and JJJ, were conservatively included in IP modification request for potential impacts associated with clean closure activities (i.e., they are not associated with the haul road). The impetus for their inclusion as potential areas of impact is based on a combination of factors. Streams 9 and 10 are located approximately 27 feet from the existing ash basin limits. Duke Energy’s experience with clean closure activities has shown that these limits can sometimes extend beyond what was mapped prior to the initiation of construction. Following the ash lens during excavation and removal to ensure a 2 clean closure has resulted in unanticipated impacts at other Duke Energy facilities (e.g., activities at Dan River resulted in following an ash lens upstream into wetland areas, resulting in unanticipated impacts and after-the-fact consultation with USACE). Though Duke Energy does not anticipate impacts to Streams 9 and 10, Duke Energy also recognizes that clean closure activities have the potential to impact the aforementioned streams and wetlands based on their proximity to the existing ash basin and Duke Energy’s previous clean closure experience. If the ash lens terminates prior to reaching these areas during clean closure, no impacts would be anticipated (i.e., jurisdictional areas will be avoided to the maximum extent practicable). However, due to the potential for impacts and to avoid unanticipated impacts and after-the-fact consultation , Duke Energy has conservatively included these potential impacts in the IP modification request. Item Number 2 Proposed impacts to Wetland OOO are indicated as a result of construction of Borrow Pit 4. Please clearly explain why Borrow Pit 4 cannot be reconfigured/shifted to avoid impacts to Wetland OOO. [15 A NCAC 02H .0506(b)(1)] Response Note that Borrow Pit 4 may no longer be used for borrow material, and instead may be utilized as a laydown area. Regardless, the layout of Borrow Pit 4/laydown area has been reconfigured; construction would no longer impact Wetland OOO, a previously proposed 0.1-acre impact. Please see the enclosed plan sheet with the updated LOD (Q-R 2). With regards to all project components and overall impacts to jurisdictional waters at the Mayo Steam Electric Plant , the total amount of permanent impacts for the requested modification of the USACE IP were 2.04 acres of wetlands and 1,273 linear feet of stream channel. The primary project actions comprise the construction of the proposed Ash Basin Landfill (ABLF), four borrow areas, haul road, dam decommission, and the previously completed construction of the Lined Retention Basin (LRB). The elimination of the proposed 0.1-acre impact to Wetland OOO decreases the total proposed wetland impact for the project from 2.04 acres to 1.94 acres, as summarized in the table below. Proposed Impacts and Completed Impacts to Wetlands and Streams within the Project Site Project Action (status) Wetland Impacts (acre) Stream Impacts (linear feet) ABLF (proposed) 0.79 acre (reduction of 0.1 acre from 0.89 acre) 896 LRB (completed) 1.15 377 Total 1.94 1,273 The reduction in the amount of total wetland impact for the project would correspondingly result in a reduction in the amount of compensatory mitigation that would be required for the project. The following table presents the compensatory mitigation summary for the project, updated with 3 the elimination of the impact to Wetland OOO and the associated fee cost. The total mitigation cost for the project would decrease from $1,329,632.36 to $1,311,421.23. Potential Mitigation Costs for Impacts to Waters of the US within the Project Site Item Number 3 If the U.S. Army Corps of Engineers requests a response to any comments received as a result of the Public Notice, please provide the Division with a copy of your response to the USACE. [15A NCAC 02H .0502(c)] Response Duke Energy and Wood have not received comments from the USACE or other respondents to the Public Notice at the time of this correspondence. However, when comments are transmitted Fee Category Features Impact Total NCDMS In-Lieu Fee Unit Cost Total Cost¹ Wetland draining to Ash Basin Wetlands B, C, UU, and ZZ – Landfill Area and Wetlands E and MMM – Lined Retention Basin (NC WAM Medium Rating) 1.50 acre (1:1 mitigation ratio) $91,055.65 $136,583.47 Riparian Wetland draining to Ash Basin Wetlands JJJ and LLL – Haul Road and Wetland D – Lined Retention Basin (NC WAM Medium Rating) 0.31 acre (0.62 acre at 2:1 ratio) $91,055.65 $56,454.50 Wetland not draining to Ash Basin Wetland OOO – Borrow Area 4 (NC WAM Medium Rating) No Impact $91,055.65 $0 Riparian Wetland not draining to Ash Basin (drainage to Crutchfield Branch via unnamed tributary) Wetlands F and H – Ash Basin Dam Decommission Area (NC WAM Medium or High Ratings) 0.13 acre (0.26 at 2:1 ratio) $91,055.65 $23,674.47 Stream (unnamed tributary) draining to Ash Basin Streams 9 and 10 – Haul Road and Streams 5 and 6 – Lined Retention Basin (NC SAM Medium Rating) 686 linear feet (1,372 at 2:1 ratio) $558.81 $766,687.32 Stream (unnamed tributary) draining to Crutchfield Branch Streams 1 and 3 – Ash Basin Dam Decommission Area (NC WAM Medium Rating) 587 linear feet (1:1 ratio) $558.81 $328,021.47 Total $1,311,421.23 4 to Duke Energy and Wood by the USACE, a copy of the responses to those comments will be provided to the DWR. Thank you in advance for your further assistance with this project. If you have any questions or need additional information, please contact me via phone at (336) 854-4916 or email at Lori.Tollie@duke-energy.com. Sincerely, Lori W. Tollie Duke Energy – Permitting & Compliance Enclosures: Q-R 1 (Plan View: Stream 9 and 10) Q-R 2 (Plan View: Wetland OOO) cc: Chris Hopper (USACE) Steve Cahoon (Duke Energy) Michae l Lazar (Duke Energy) Mike Kendrick (Duke Energy) Richard Harmon (Wood) 6 Q-R 1: PLAN VIEW STREAMS 9 & 10 9 EXISTING DUKE 10 LLL JJJ 0 + 9 2 0 + 0 0 0+000+950+001+001+000+9 9 0+0 0 ASH BASIN -FIGURE 1FIGURE 1 DWG SIZE REVISION FOR DRAWING NO. TITLE FILENAME: DWG TYPE: JOB NO: DATE: SCALE:DES: DFTR: CHKD: ENGR: APPD: A F E D C B 2 3 4 5 7 86 4 5 7 8 9 106 A F C B 11"x17" ANSI C SEAL 321 Environment & Infrastructure Solutions 4021 STIRRUP CREEK DRIVE, SUITE 100 DURHAM NC 27703 TEL: (919) 381-9900 FAX: (919) 381-9901 LICENSURE: NC ENG: F-1253 NC GEOLOGY: C-247 REV DATE JOB NO.PROJECT TYPE DES DFTR CHKD ENGR APPD DESCRIPTION 12/10/2020 7812-20-0451 DWG AS SHOWN RH RH JC SM SM MAYO ASH BASIN LANDFILL MAYO STEAM ELECTRIC STATION PERSON COUNTY, NORTH CAROLINA PLAN VIEW 1 --FIGURE 1 -MATCH LINE - FIGURE 2N EXISTING ASH BASIN BOUNDARY PROPOSED LANDFILL BOUNDARY STREAM - IMPACTED STREAM - NOT IMPACTED WETLAND - IMPACTED WETLAND - NOT IMPACTED LIMITS OF DISTURBANCE CROSS SECTION EXISTING MAJOR ROAD EXISTING RAILROAD LEGEND STREAM 9 485' 490' 495' 500' 505' 510' 485' 490' 495' 500' 505' 510' 0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 1+05 STREAM 10 475' 480' 485' 490' 495' 500' 475' 480' 485' 490' 495' 500' 0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 -FIGURE 14FIGURE 14 DWG SIZE REVISION FOR DRAWING NO. TITLE FILENAME: DWG TYPE: JOB NO: DATE: SCALE:DES: DFTR: CHKD: ENGR: APPD: A F E D C B 2 3 4 5 7 86 4 5 7 8 9 106 A F C B 11"x17" ANSI C SEAL 321 Environment & Infrastructure Solutions 4021 STIRRUP CREEK DRIVE, SUITE 100 DURHAM NC 27703 TEL: (919) 381-9900 FAX: (919) 381-9901 LICENSURE: NC ENG: F-1253 NC GEOLOGY: C-247 REV DATE JOB NO.PROJECT TYPE DES DFTR CHKD ENGR APPD DESCRIPTION 12/10/2020 7812-20-0451 DWG AS SHOWN RH RH JC SM SM MAYO ASH BASIN LANDFILL MAYO STEAM ELECTRIC STATION PERSON COUNTY, NORTH CAROLINA CROSS-SECTIONS --FIGURE 14 - LOCATION OF STREAM 9 STA: 0+50.00 ELEV: 494.65 LOCATION OF STREAM 10 STA: 0+58.61 ELEV: 484.32 7 Q-R 2: PLAN VIEW WETLAND OOO BOSTON ROAD (US. RT. 501)OOO -FIGURE 5FIGURE 5 DWG SIZE REVISION FOR DRAWING NO. TITLE FILENAME: DWG TYPE: JOB NO: DATE: SCALE:DES: DFTR: CHKD: ENGR: APPD: A F E D C B 2 3 4 5 7 86 4 5 7 8 9 106 A F C B 11"x17" ANSI C SEAL 321 Environment & Infrastructure Solutions 4021 STIRRUP CREEK DRIVE, SUITE 100 DURHAM NC 27703 TEL: (919) 381-9900 FAX: (919) 381-9901 LICENSURE: NC ENG: F-1253 NC GEOLOGY: C-247 REV DATE JOB NO.PROJECT TYPE DES DFTR CHKD ENGR APPD DESCRIPTION 12/10/2020 7812-20-0451 DWG AS SHOWN RH RH JC SM SM MAYO ASH BASIN LANDFILL MAYO STEAM ELECTRIC STATION PERSON COUNTY, NORTH CAROLINA PLAN VIEW 5 --FIGURE 5 - N EXISTING ASH BASIN BOUNDARY PROPOSED LANDFILL BOUNDARY STREAM - IMPACTED STREAM - NOT IMPACTED WETLAND - IMPACTED WETLAND - NOT IMPACTED LIMITS OF DISTURBANCE CROSS SECTION EXISTING MAJOR ROAD EXISTING RAILROAD LEGEND MATCH LINE - FIGURE 6