Loading...
HomeMy WebLinkAboutSW1190901_O&M Agreement_20200224Operation & Maintenance Agreement Project Name Project Location: Asheville Regional Airport - Parking Lots- LOW DENSITY Asheville Regional Airport, Fletcher, NC Cover Page Maintenance records shall be kept on the following BMP(s). This maintenance record shall be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s). The BMP(s) on this project include (check all that apply & cc Bioretention Cell Quantity: Dry Detention Basin Grassed Swale Green Roof Infiltration Basin Infiltration Trench Level SpreaderNFS Permeable Pavement Proprietary System Rainwater Harvesting Sand Filter Stormwater Wetland Wet Detention Basin Disconnected Impervious Area User Defined BMP Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Present: Present: ig O&M tables will be added automatically): Location(s): Location(s): Location(s): Vegetated Conveyance from parking lot Location(s): Location(s): Location(s): Location(s): Downstream of North Parking Area Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each BMP above, and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any changes to the system or responsible party. * Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): Email: Signature: County of personally appeared before me this Lew Bleiweis Executive Director, Greater Asheville Regional Aiport Authority 61 Terminal Drive, Suite 1 Fletcher, NC 28732 (828) 684-2226 riIbleiweis@flyavl.com � I , a Notary Public for the State of , do hearby certify that day of acknowledge the due execution of the Operations and Maintenance Agreement. Witness my hand and official seal, O&M Manual Date: and 2/21 /2020 Page 1 of 5 Seal My commission expires STORM-EZ 2/21 /2020 Version 1.4 O&M Manual Page 2 of 5 Level Spreader -Vegetated Filter Strip / Restored Riparian Buffer Maintenance Requirements Important maintenance procedures: _ Immediately after the filter strip is established, any newly planted vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). - Once a year, the filter strip will be reseeded to maintain a dense growth of vegetation - Stable groundcover will be maintained in the drainage area to reduce the sediment load to the vegetation. Two to three times a year, grass filter strips will be mowed and the clippings harvested to promote the growth of _ thick vegetation with optimum pollutant removal efficiency. Turf grass should not be cut shorter than 3 to 5 inches and may be allowed to grow as tall as 12 inches depending on aesthetic requirements (NIPC, 1993). Forested filter strips do not require this type of maintenance. - Once a year, the soil will be aerated if necessary. - Once a year, soil pH will be tested and lime will be added if necessary. After the filter strip is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inch (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How to remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the BMP Areas of bare soil and/or Regrade the soil if necessary to remove the gully, and then plant a erosive gullies have formed. ground cover and water until it is established. Provide lime and a one- time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of approximately six inches. long. The flow splitter device (if The flow splitter device is Unclog the conveyance and dispose of any sediment off -site. applicable) clogged. The flow splitter device is Make any necessary repairs or replace if damage is too large for damaged. repair. The inlet device The pipe is clogged. Unclog the pipe. Dispose of the sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to smooth it over and provide erosion swale. control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and replace with clean stone. covered in sediment (if applicable). STORM-EZ 2/21 /2020 Version 1.4 O&M Manual Page 3 of 5 LS-VFS / Restored Riparian Buffer Maintenance Requirements (Continued) The swale and the level lip The swale is clogged with Remove the sediment and dispose of it off -site. sediment. The level lip is cracked, Repair or replace lip. settled, undercut, eroded or otherwise damaged. There is erosion around the Regrade the soil to create a berm that is higher than the level lip, and end of the level spreader that then plant a ground cover and water until it is established. Provide shows stormwater has lime and a one-time fertilizer application. bypassed it. Trees or shrubs have begun Remove them. to grow on the swale or just downslope of the level lip. The bypass channel Areas of bare soil and/or Regrade the soil if necessary to remove the gully, and then reestablish erosive gullies have formed. proper erosion control. Turf reinforcement is Study the site to see if a larger bypass channel is needed (enlarge if damaged or ripap is rolling necessary). After this, reestablish the erosion control material. downhill. The filter strip Grass is too short or too long Maintain grass at a height of approximately three to six inches. (if applicable). Areas of bare soil and/or Regrade the soil if necessary to remove the gully, and then plant a erosive gullies have formed. ground cover and water until it is established. Provide lime and a one- time fertilizer application. Sediment is building up on the Remove the sediment and restabilize the soil with vegetation if filter strip. necessary. Provide lime and a one-time fertilizer application. Plants are desiccated. Provide additional irrigation and fertilizer as needed. Plants are dead, diseased or Determine the source of the problem: soils, hydrology, disease, etc. dying. Remedy the problem and replace plants. Provide a one-time fertilizer application. Nuisance vegetation is Remove vegetation by hand if possible. If pesticide is used, do not choking out desirable species. allow it to get into the receiving water. The receiving water Erosion or other signs of Contact the NCDENR local Regional Office, or the 401 Oversight Unit damage have occurred at the at 919-733-1786. outlet. STORM-EZ 2/21 /2020 Version 1.4 O&M Manual Page 4 of 5 Grassed Swale Maintenance Requirements Important maintenance procedures: The drainage area of the grassed swale will be carefully managed to reduce the sediment load to the grassed swale. After the first-time fertilization to establish the grass in the swale, fertilizer will not be applied to the grassed swale. The grassed swale will be inspected once a quarter. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How to remediate the problem: The perimeter of the BMP Areas of bare soil and/or Regrade the soil if necessary to remove the gully, and then plant a erosive gullies have formed. ground cover and water until it is established. Provide lime and a one- time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of approximately six inches. long. The entire length of the Trash/debris is present. Remove the trash/debris. swale Areas of bare soil and/or Regrade the soil if necessary to remove the gully, and then re -sod (or erosive gullies have formed. plant with other appropriate species) and water until established. Provide lime and a one-time fertilizer application. Sediment covers the grass at Remove sediment and dispose in an area that will not impact streams the bottom of the swale. or BMPs. Re -sod if necessary. Vegetation is too short or too Maintain vegetation at a height of approximately six inches. long. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Department of Environment and Natural damage have occurred at the Resources Regional Office. outlet. STORM-EZ 2/21 /2020 Version 1.4 O&M Manual Page 5 of 5