HomeMy WebLinkAbout310678_30 day poa_20210201PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-678 Facility Name: Farm 30903 Certified Operator Name: Derek Brown County: Duplin Operator Number: AWA19632 1, Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the Jowest point on the top of the dam for lagoons without spillways-, and from the current liquid level in the lagoon to the bottom of the °perez Lagoon Name/lD: Spillway(Y or N): Level(inches): Lagoon Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 20 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures, Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges, X Liquid level is within the 25 year 24 Dour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflec±^�"... "' 4. "'-- 1—F 4-4 .. `":w ;":~ -I-- :� � °-` of the proposed sites with related facility numbers, number of acrG;; a •�r information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation freeboard levels and herd population fGrt;RG 3. Earliest nossihlo date to henin land annlication of waste: as conditions nermit ' . • ' "- - ......... ;steel above and included within the aULa-c9ied Plan of Action, and to the best of my knowledge and ability, the information is Rmithfialrl Ann Prnthir•tinn Phnna- A1n_7Q1_'AA-A4 .. - ---- ----------.� wrint) Date: 2/1/2021 11. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 30903 line m = 652.1 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4, Structure ID: lime m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 + 2 + 3 + 4 + 5 + 6 = 652.1 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD- 0- tract # p_ field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (tbs.) column r x s u. application window' sub 2 Small Grain 1.04 50.00 52.0 Sept -April sub 3 Small Grain 2.03 50.00 101.5 Sept -April 1 &2 Small Grain 10.98 25.00 274.5 Sept -April 3 Small Grain 19.93 25.00 498.3 Sept -April 4 Small Grain 28.88 25.00 722.0 Sept -April 5 Small Grain 37.83 25.00 945.8 Sept -April 6 Small Grain 46.78 25.00 1169.5 Sept -April `State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period- v. Total PAN available for all fields (sum of column t) T 3763.5 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section Il) = 652.1 lb. PAN PoA (30 Day) 2/21(00 x. Crop's remaining PAN balance (line v from section lll) = 3763.5 lb. PAN y. Overall PAN balance (rw - x) _ -3111 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is available for pumping if needed. PoA (30 Day) 2/21 /00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 3 3 2. Current liquid volume in 25 yr.124 hr_ storm storage & structural freeboard a. current liquid level according to marker 20.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 20.4 inches c. line b - line a (inches in red zone) = 0.4 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 157,500 ftz e. line c/12 x line d x 7.48 gallons/W 39270 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 237,364 fit' h. current herd # 8452 certified herd # 8452 actual waste produced = current herd # x line g certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (limes h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period 1. current waste analysis dated 1 1/14/2Q21 m_ ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 237364 ft' ®ft3 91,875 ft' 410451 gallons 1.45 lbs/1000 gal. 652,1 lbs. PAN PoA (30 Day) 2/21 /00