Loading...
HomeMy WebLinkAbout20210193 Ver 1_Meeting Request Review Doc Attachment_20210127 (2) STATE OF NORTH CAROLINA PERMIT DRAWING SX1i14r VO DIVISION OF HIGHWAYS SHEET 1 OF 5 INDEX OF SHEETS PAPA SHEET NO. TITLE WETLAND /STREAM IMPACT TITLE SHEET AND INDE%OF SHEETS 2 PLAN VIEW COUNTY 3 PLAN VIEW WITH CONTOURS DURHAM V LJ V i t j j 4 STREAM CROSS SECTION DIVISION 5 5 IMPACT SUMMARY LOCATION: �+'�2:�n►1+�s'=+- BRIDGE #233 ON MARYLAND AVENUE OVER ELLERBEE CREEK r��erzlrijviw'��1r„ '14. TYPE OF WORK: •f BRIDGE REMOVAL AND STREAM RESTORATION _ itrk Rd. \ '�'k D:eoe n t:d \\1 O' 3 R ~o�' nPr S,I N2 9 �" 06 —Nor[hPolMe Dr. ^- m � '�'m_ se PROJECT ' >.181:a „..,N o PRELIMINARY PLANS am A '�n '; a 22 DO NOT USE FOR CONSTRUCTTOX Tr. QO _ ` 5C N EAR qy • __ Sunset Ave. el cl / J. • / 0' )d-2'.'" ' SITE 1 r Eftill Cln 1 # Li` CO C.I4 STEEL TIMBER I'\\vs V` p ASPH.DECK �lD 1• = I I E�RgEE co__. ,.,� ( II • it W • / �`—r'� III SITE 2 �� Q • Lig QI TIMBER WW II /�— � Ih'( DOCUMENTLS NOT CONSIDEREDOM LETE I� ETED I•I ' ��`-' UNLESS ALL SINO CONSI ERRED FINAL • I 1 DURHAM APPROVED: PLANS PREPARED BY: One Glenwood Avenue - Suirc9W I ® DATE: gi R Gannett Fleming aleigh,NCS)b03 Excellence Delivered As Promised NC Lie.No.F-0270 CITY MEDIu.E - PROJECT REFERENCE NO. I SHEET NO. e%,\ 'T7 DENOTES TEMPORARY ROADWAY:SIX' HYDRAULICS I - !? \ c z, IMPACTS IN SURFACE WATER ENGINEER ENGINEER // AL. I I ' EVE ABU,y NT ` GF i�CO/41,MM PLANS cS , AB VE FOO ` �,qsS' / i P SHEIET Y OFI SGREMOVE E' \I 4" DOCUMENT NOT CONSIDERED FINAL 11 ` _ `• ` UNLESS ALL SIGNATURES COMPLETED ��••4•••••••••••••11••• ♦•••••-'STRE STORATION •0;• *;;;t:t3::.•;!;; ••:�'tea --•. - � `kit \\� SEE DETAIL 2 * ••••--- E +! \ BANK STABILIZATIO. III' _''�yq�RT� REMOVE u 20' 0' 20' 40' 60' 1 t.. - _ . WALL ce — �� GRAPHIC SCALE /� /-f—��� IItitiTI�'MBER WI �,I I��S•N \ DETAIL 1 �, r��'%" ' / k" q•BiB/ EXCAVATION AT STREAM BANK ti (Not to Scale) SEE DETAIL 3 tH. : .� •REPLITY 6 Proposed BANKFUL BANSTABILIZATIQL •' VTR� I����)I EDESTAL DI SEE DETAIL 3 � ELEv 0 10'�• .G' ,, le BANK Existing_il j 5� A _ I \ \ STABILIZATION _3' ...-8 --. ir _ I EXCAVATION i 2 A - 1 x l \moo\ i • i /BZ a N \�\ EXCAVATION= 150 cy — / / n N a II WESTOVER / / PARK REMOVE ABUTMENT \\ DETAIL 2 ABOVE FOOTING \ RIP RAP AT EMBANKMENT (Not to Scale) WOODS 10'min. a I Q Ditch 1 O mi 1' Q COLLAR AND EXTEND Grade • 184'FROM OUTLET • . . W\bS GEOTEXTILE 1 CB 12" CP Type of Liner= 100 TONS,CL I Rip-Rap �� Geotextile=180 sy II DETAIL 3 ROCK AT PIPE OUTLET jl (Not to Scale) 10'min. CLASS I j; Existing�� RIP-RAP CLASS II 1.0'm i n. RIP-RAP . III T .� 1' PROPOSED PIPE VI T,- Type of Liner= GEOTEXTILE t jl j 32 TONS 32 ,CL II RiCL I p Rip-Rap \iI `,-I'� Geotextile= 42 sy PROJECT REFERENCE NO. I SHEET NO. l,/ \ - ���� �''- \� J %, ,:)/I / •:. •�\ ,- \ ' DENOTES TEMPORARY — `" "° \ ` '/E ABU � cG 1'` IMPACTS IN SURFACE WATER RDOWnvDEs°NEa HYDRAULICS / \ /// \\ Z ' ENGINEER ENGINEER q i — �\ �j/• /�\\.1' en.• ' N 1 '�:�VEI FOO \ \\ ��sS O\ \ PERMIT DRAWING I If COM�Pui7„ PLANS 1 __ �/ // , u' t) I ys,r�\ SHEET 3 OF 5 � > -Asa-_� \ /� „ REMOVE )...� 4 '- / ` \ c .' . �, DOCUMENT NOT CONSIDERED FINAL / \l' / ♦• UNLESS ALL SIGNATURES COMPLETED \ / J ,- ETAIL 1 • •• •.4 •.• •• STREAfW�f. ORATION .0 :;:;.;:;;t:4,Z:,,,; '.o,:•' • I � SEE DET�L 2 � -/ ) � - AIVK STABILIZATIO ► 40 I'�� � �\ � 20' 0' 20' 40' 60' 1� /B ,. ' i.F-�,..; REMOVE 71 - � - .n WALL I N-N. �\� •� , � GRAPHIC SCALE�4 "j �- \ 11 ��lir T : . � \ EXCAVATION AT STREAM BANK • �4 ��� t' REP 0 Bti (Not to Scale) 1 �uE'l� /� s / ♦ • LITY / / Proposed BANKFUL �jTRpIL/ çSTAL DI dELEVJI ) \ BANK ) Existing ! y p JJ l _„ — STABILISATION 3' I� _1i�� %_/�I ), 4 in � ��� �\ '�� 1 EXCAVATION= 150 cy — —� 7 // REIy VE AB�i T NT �s� \� DETAIL 2 y ABOV FOO N O 11) f _ RIP RAP AT EMBANKMENT I \I\ _ / (Not to Scale) WOODS �� �' _ E ` �� ) i 1/4'N i A \ � � - p ��i 7� Ditch �- 1.0'mi I 1� II�^II II I1 •Ii Q 1 I, COLLAR AO EXTEND Grade - •3M11I \ I' I 184'FROM OUT�ET \/'/'• • m /\ \ /WSJ` I_ / 1 u, I° c_) s��� / ��� �/% GEOTEXTILE — p `,I t 1 12" CP C` /// 7- — y// •II \ l / �I i- J I / �'\ \� ��%� Type of Liner= 100 TONS,CL I Rip-Rap / I'I t / / �� � �It������� � Geotextile=180 sy \, V', , v "�'.` // /% / DETAIL 3 / ;,.2/ j /N' A. ja \ I --}1 / / /\ / ROCK AT PIPE OUTLET (Not to Scale) �, � �_-( 3` , ( \ c'I � // �� i 10'min. CLASS IIP Existing�. RIP—RAP CLASS II _ �� // _ �-- V 1 r- _, 1.0'min. RIP—RAP \ J/ �-S —y \ PROPOSED PIPE r, ai, =��� A\ / / s ''' \ V T, Type of Liner= u ^ �z —J ` / GEOTEXTILE €j c? 32 TONS,CL I Rip-Rap / / / / ( i 2 32 TONS,CL II Rip-Rap J� \ /j� ��� - -_- � ij/� \ \ — / _�1 l\ 1 II r I I r , , \ � Y 4� G=otextile= 42 sy EllerbeCr Detailed Study Plan: 1) Revised 2) Existing Old Bridge upstream face includes sewer line Legend -Sewer Line Ground-Existing • Bank Sta-Corrected Ef 360- • Ground-Revised • Bank Sta-Revised 355- c c 0 w 350- - 345- u 340- 4850 4900 4950 5000 5050 5100 5150 Station(ft) 1 in Horiz.=50 ft 1 in Vert.=5 ft WETLAND AND SURACE WATER IMPACTS SUMMARY _ WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size/Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) _ (ac) (ac) (ac) (ft) _ (ft) (ft) _ 1 STREAM RESTORATION <0.01 80 2 BANK STABILIZATION <0.01 122 TOTALS*: <0.01 0 202 0 *Rounded totals are sum of actual impacts NOTES: NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 1/04/2021 DURHAM COUNTY BRIDGE 233 REMOVAL Revised 2018 Feb SHEET 5 OF 5