Loading...
HomeMy WebLinkAbout20120003 Ver 1_401 Application_20120112ENVIRONMENTAL PROFESSIONALS, INC Planning for a Better Environment P O Box 3368 Kill Devil Hills NC 27948 Telephone 2S2441 0239 Fax 2S2441 0721 Email obxwood @yahoo com TO NCDENR Division of Water Quality /401 Wetlands Unit Attn Mr Ian McMillian 1650 Mail Service Center Raleigh NC 27699 1650 X ATTACHED 20120003 DATE December 29 2011 JOB NO 010 -027 RE Richard & Elaine Layton COPIES DATE DESCRIPTION OF DOCUMENTS 3 1213 11 11 x 17 Plats Wetlands Fill Permit 5 1223 11 Pre Construction Notification (PCN) Form 1 4 13 11 Authorization to Act as Agent Form 5 Dec 2011 Commitment Letter from NC Ecosystem Enhancement Program 1 1223 11 EPI Check No 10862 in the Amount of $240 00 THE5E AKE SUBMITTED A5 CHECKED BELOW �l For your approval ❑ For your use ❑ ❑ As requested REMARKS Review & Comment Signature/Notarization COPY TO U S Army Corps of Engineers /Attn Mr Josh Pelletier 2407 West Fifth Street Washington NC 27889 Richard & Elaine Layton 119 Lexington Drive McMurray PA 15317 Project File JAN 3 2012 DENR WATER QUALI fY HANDS AND STQRMWATER BRANCH SIGNED '11L4V orge H Wood CEP PWS Environmental Professionals Inc Y rA;j; ET i gem PROGRAM December 29, 2011 Richard and Elaine Layton C/O George Wood Environmental Professionals PO Box 3368 Kill Devil Hills NC 27948 Protect Richard and Elaine Layton 1a- O003 P,9-X RVX)- Ut%- Divlb Expiration of Acceptance June 29 2012 County Perquimans The purpose of this letter is to notify you that the North Carolina Ecosystem Enhancement Program (NCEEP) is willing to accept payment for compensatory mitigation for impacts associated with the above referenced project as indicated in the table below Please note that this decision does not assure that participation in the NCEEP will be approved by the permit issuing agencies as mitigation for project impacts It is the responsibility of the applicant to contact these agencies to determine if payment to the NCEEP will be approved You must also comply with all other state federal or local government permits regulations or authorizations associated with the proposed activity including SL 2009 337 An Act to Promote the Use of Compensatory Mitigation Banks as amended by S L 2011 343 This acceptance is valid for six months from the date of this letter and is not transferable If we have not received a copy of the issued 404 Perimt/401 Certificabon/CAMA permit within this time frame, this acceptance will expire It is the applicant s responsibility to send copies of the permits to NCEEP Once NCEEP receives a copy of the permit(s) an invoice will be issued based on the required mitigation in that permit and payment must be made prior to conducting the authorized work The amount of the In Lieu Fee to be paid to NCEEP by an applicant is calculated based upon the Fee Schedule and policies listed at www nceep net Based on the information supplied by you in your request to use the NCEEP the impacts that may require compensatory mitigation are summarized in the following table The amount of mitigation required for this impact is determined by permitting agencies Impact River Basin CU Location Stream (feet) Wetlands (acres) Buffer I (Sq Ft) Buffer II (Sq Ft ) Cold Cool Warm Riparian Non Ri arian Coastal Marsh Pasquotank 03010205 0 0 0 0 OS 0 0 0 0 Upon receipt of payment EEP will take responsibility for providing the compensatory mitigation The mitigation will be performed in accordance with the N C Department of Environment and Natural Resources Ecosystem Enhancement Program In Lieu Fee Instrument dated July 28 2010 Thank you for your interest in the NCEEP If you have any questions or need additional information please contact Kelly Williams at (919) 716 1921 Sincerely Michael Ellison Deputy Director cc Karen Higgins NCDWQ Wetlands/401 Unit Kyle Barnes USACE Washington Amy Adams NCDWQ Washington Doug Huggett NCDCM Morehead City George Wood agent File Restovuc5 Enluutang Pro" oar .rm& *,L, IRUWR North Carolina Ecosystem Enhancement Program 1652 Mad Service Center Raleigh NC 27699 1652 / 919 715 0476 / www nceep net ALI I HORIZATION TO Ac f AS REPRFSENTATIVF FORM I andowntr I retold authorvt,,J-w*rronmental Professionals Inc to enter the property to gather environmental and site information including delineation of environmental regulator) , junsdictions tnttr tht site meth the regulator) agencies (i t U S Army Corps of I ngincers North Carolina Division of Coastal Management North Carolina Division of Wattr Ou -111q etc ) as needed to review regulatory ihLnmtnt(s) and to identify lddnionil rtt,ul nor-, jurisdictions -ind ubmit plats ind other information to acquire regulatory tgency confirmations and /or approvals (U S Armv Corps of Engineers North Carolina Division of Coastal Mana+_emcnt North Carolina Division of %\ attt Quality etc ) ind piovidt authorization for Lnvironmental Professionals Inc to act as your agent for the purposes of obtaining environmental permits and /or authonzauons Landowner ate Client I Dite 00 \NAT�F9QG oliii�MMIMISW< 2012 ®003 Office Use Only Corps action ID no DWQ project no Form Version 1 3 Dec 10 2008 Page 1 of 11 PCN Form —Version 1 3 December 10 2008 Version Pre - Construction Notification PCN Form A Applicant Information 1 Processing la Type(s) of approval sought from the Corps ®Section 404 Permit El Section 10 4rmit 1 b Specify Nationwide Permit (NWP) number 18 or General Permit (GP) number 1c Has the NWP or GP number been verified by the Corps? ❑ Yes ® No 1 d Type(s) of approval sought from the DWQ (check all that apply) ® 401 Water Quality Certification — Regular ❑ Non 404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ❑ Yes ® No For the record only for Corps Permit ❑ Yes ® No 1f Is payment into a mitigation bank or in lieu fee program proposed for mitigation of impacts? If so attach the acceptance letter from mitigation bank or in lieu fee program ® Yes ❑ No 1g Is the project located in any of NC s twenty coastal counties If yes answer 1 h below ® Yes ❑ No 1h Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2 Project Information 2a Name of project Layton 2b County Perqumans 2c Nearest municipality / town Hertford 2d Subdivision name Albemarle Plantation 2e NCDOT only T I P or state project no N/A 3 Owner Information 3a Name(s) on Recorded Deed Richard and Elaine Layton 3b Deed Book and Page No Plat 2 Bk 74 Pg 6 3c Responsible Party (for LLC if applicable) N/A ]AN 3 2012 3d Street address 119 Lexington Drive 3e City state zip McMurray PA 15317 WERMIDS AND ST- 0-MATER BRANCH 3f Telephone no 724 746 2777 x201 3g Fax no 724 746 5434 3h Email address elayton @oldrepublictitle com Page 1 of 11 PCN Form —Version 1 3 December 10 2008 Version 4 Applicant Information (if different from owner) 4a Applicant is ❑ Agent ❑ Other specify 4b Name N/A 4c Business name (if applicable) 4d Street address 4e City state zip 4f Telephone no 4g Fax no 4h Email address 5 Agent/Consultant Information (if applicable) 5a Name George H Wood CEP PWS 5b Business name (if applicable) Environmental Professionals Inc 5c Street address 1404 S Virginia Dare Trail P 0 Box 3368 5d City state zip Kill Devil Hills NC 27948 5e Telephone no 252 441 0239 5f Fax no 252 441 0721 5g Email address obxwood @yahoo com Page 2 of 11 PCN Form —Version 1 3 December 10 2008 Version B Project Information and Prior Project History 1 Property Identification 1a Property identification no (tax PIN or parcel ID) 7866 33 2162 000 Latitude 36 094592 Longitude lb Site coordinates (in decimal degrees) Longitude 76 416308 (DD DDDDDD) ( DD DDDDDD) 1 c Property size 14 acres 2 Surface Waters 2a Name of nearest body of water (stream river etc ) to Yeopim Creek proposed project 2b Water Quality Classification of nearest receiving water SC 2c River basin Pasquotank 3 Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application Wooded Lot Residential 3b List the total estimated acreage of all existing wetlands on the property 0 9 Acres 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 0 3d Explain the purpose of the proposed project Fill in wetlands for residential construction 3e Describe the overall project in detail including the type of equipment to be used Upland and wetland area to be filled & to be cleared by front end loader Retaining wall construction and backfdled by dump truck 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ® Yes El No El Unknown project (including all prior phases) in the past? Comments 4b If the Corps made the jurisdictional determination what type ❑ Preliminary ® Final of determination was made? 4c If yes who delineated the jurisdictional areas? Agency /Consultant Company Environmental Name (if known) Professionals Inc George H Wood PWS Other 4d If yes list the dates of the Corps jurisdictional determinations or State determinations and attach documentation 7 15 11 SAW 2011 01299 5 Project History 5a Have permits or certifications been requested or obtained for ❑ Yes ® No ❑ Unknown this project (including all prior phases) in the past? 5b If yes explain in detail according to help file instructions N/A Page 3 of 11 PCN Form — Version 1 3 December 10 2008 Version 6 Future Project Plans 6a Is this a phased project? ❑ Yes ® No 6b If yes explain N/A Page 4 of 11 PCN Form — Version 1 3 December 10 2008 Version C Proposed Impacts Inventory 1 Impacts Summary la Which sections were completed below for your project (check all that apply) ® Wetlands ❑ Streams tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps 404 10 Area of impact Permanent (P) or (if known) DWQ — non 404 other) (acres) Temporary W1 ®P ❑ T Fill Hardwood Bottom ® Yes ❑ No ® Corps ® DWQ 05 W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g Total wetland impacts 2h Comments 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number (PER) or (Corps 404 10 stream length Permanent (P) or intermittent DWQ — non 404 width (linear Temporary (T) (INT)? other) (feet) feet) S1 ❑ PMT ❑ PER ❑ Corps ❑ INT ❑ DWQ S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h Total stream and tributary impacts 0 31 Comments Page 5 of 11 PCN Form —Version 1 3 December 10 2008 Version 4 Open Water Impacts If there are proposed impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of the U S then individually list all open water impacts below 4a 4b 4c 4d 4e Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ❑ PEI T 02 ❑P ❑T 03 ❑P ❑T 04 ❑ PEI T 4f Total open water impacts 0 4g Comments 5 Pond or Lake Construction If pond or lake construction proposed then complete the chart below 5a 5b 5c 5d 5e Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f Total 0 5g Comments 5h Is a dam high hazard permit required ❑ Yes ❑ No if yes permit ID no 51 Expected pond surface area (acres) 51 Size of pond watershed (acres) 5k Method of construction 6 Buffer Impacts (for DWQ) If project will impact a protected riparian buffer then complete the chart below If yes then individually list all buffer impacts below If any impacts require mitigation then you MUST fill out Section D of this form 6a ❑ Neuse ❑ Tar Pamlico ❑ Other Project is in which protected basin? ❑ Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required B1 ❑P ❑T ❑Yes ❑ No B2 ❑P ❑T El Yes ❑ No B3 ❑P ❑T El Yes ❑ No 6h Total buffer impacts 0 0 61 Comments Page 6 of 11 PCN Form — Version 1 3 December 10 2008 Version D Impact Justification and Mitigation 1 Avoidance and Minimization la Specifically describe measures taken to avoid or minimize the proposed impacts in designing project Only the area necessary for home construction and tie back location to be filled 1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques Fill will be retained by retaining wall 2 Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of the U S or Waters of the State? ® Yes ❑ No 2b If yes mitigation is required by (check all that apply) ® DWQ ® Corps 2c If yes which mitigation option will be used for this project? ❑ Mitigation bank ®Payment to in lieu fee program ❑ Permittee Responsible Mitigation 3 Complete if Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Quantity 3c Comments 4 Complete if Making a Payment to In lieu Fee Program 4a Approval letter from in lieu fee program is attached ® Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation stream temperature ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested 0 10 acres 4f Non riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5 Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan provide a description of the proposed mitigation plan Page 7 of 11 PCN Form — Version 1 3 December 10 2008 Version r 6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation ❑ Yes ® No 6b If yes then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 5 6f Total buffer mitigation required 6g If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank permittee responsible riparian buffer restoration payment into an approved in lieu fee fund) 6h Comments Page 8 of 11 PCN Form — Version 1 3 December 10 2008 Version E Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan la Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b If yes then is a diffuse flow plan included? If no explain why ❑ Yes ❑ No Comments 2 Stormwater Management Plan 2a What is the overall percent imperviousness of this project? 14% 2b Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c If this project DOES NOT require a Stormwater Management Plan explain why Within the Albemarle Plantation Master Stormwater Plan 2d If this project DOES require a Stormwater Management Plan then provide a brief narrative description of the plan N/A ❑ Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3 Certified Local Government Stormwater Review 3a In which local government s jurisdiction is this project? N/A ❑ Phase II 3b Which of the following locally implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4 DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a Which of the following state implemented stormwater management programs apply ❑ ORW (check all that apply) ❑ Session Law 2006 246 ❑ Other N/A 4b Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5 DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 9 of 11 PCN Form — Version 1 3 December 10 2008 Version i. 41 F Supplementary Information 1 Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /state /local) funds or the ❑ Yes ❑ No use of public (federal /state) land? lb If you answered yes to the above does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c If you answered yes to the above has the document review been finalized by the State Clearing House? (If so attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter) Comments N/A 2 Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after the fact permit application? ❑ Yes ® No 2c If you answered yes to one or both of the above questions provide an explanation of the violation(s) N/A 3 Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ❑ No additional development which could impact nearby downstream water quality? 3b If you answered yes to the above submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered no provide a short narrative description N/A 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non discharge or discharge) of wastewater generated from the proposed project or available capacity of the subject facility Albemarle Plantation Community Wastewater Disposal System Page 10 of 11 PCN Form — Version 1 3 December 10 2008 Version 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? ❑ Raleigh 5c If yes indicate the USFWS Field Office you have contacted ❑ Asheville 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Cntical Habitat? Website 6 Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e g National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources Albemarle Plantation Archeological Report 8 Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA designated 100 year floodplain? -T®-yes ❑ No 8b If yes explain how project meets FEMA requirements Fill to above 100 Year Flood Elevation 8c What source(s) did you use to make the floodplain determination? FEMA Maps Environmental Professionals Inc George H Wood PWS 12 1911 Date Yppli6ant/Agefl Signature Applicant/Agent s Printed Name (Agents sig ure is valid only if an aut0rization letter from the applicant is provided ) Page 11 of 11 PCN Form — Version 1 3 December 10 2008 Version DRIVER ISLAND RD ` / ADTiHEWS PASOUOT / oPM SITE VICINITY MAP / N T S. \ 0 164 PROPOSED RETAINING WALL /-,-FlNISHED GRADE AREA TO BE FILLED \ \ EXISTING GRADE TIE BACK AS REQUIRED \ \ / RETAINING WALL SECTION A —A 1 -4 PROJECT NOTES 1 AREA TO BE FILLED 2 259 S F NO ti PROPOSED RETAINING WALL / / JAN 3 D SrDS*D�� j /, RCN FAA 15 TIE BACKS \ / (8 0C) ► 10 I �l I� OfI 10 I 01 10 I Ic I I I Z I I s 1 1 I 1 m I I 1 p6 900 NEW RIVER DRIVE 50' R�W - - - - -- i i i WETLANDS FILL PERMIT FOR RICHARD & ELAINE LAYTON LOT 43, SECTION F, ALBEM ARLE PLANTATION SCALE REVISION REV 1 1"= 40 DATES 12/13/11 PROJECT NO DATE CADD FILE 10 -027 10 -027 10/14/11 CURRENT REVISION 1 SHEET 1 of 1 ENVIRONMENTAL PROFESS /OVALS, INC Planning for a Better Environment 1404 S Virginia Dare Trail P 0 BOX 3368 — KILL DEVIL HILLS, NC 27948 PhOW (2370 44 FAX (2370 40-077/