HomeMy WebLinkAboutNCC201356_NOT Closeout Documents_20210128North Carolina Department of Environmental Quality
Land Resources: 127 Cardinal Drive Extension, Wilmington, NC 28405 (910) 796-7215
County: Duphn Project: Hall Solar
Person financially responsible: Axis Energy, Inc. - Jeff Filippo
Address: 400 Interstate North Parkway, Ste750, Atlanta, GA
1. Project Location: Murray PI Lane, Greenevers
Pictures: No
2. Weather and soil conditions: 50 rain
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes
5. Violations:
River basin: Cape Fear
Project #: DUPLI-2019-004
Initial inspection: No
If no, check violations below:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements?
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name):
Inspection report: Sent Report
9. Corrective action needed:
10. Comments: file closed
Reported by: Brian Lambe
Date of inspection: January 27, 2021
cc:
Title:
Date given/sent: January 28, 2021
Yes
Others present:
Time arriving on site: 12:00 PM Time leaving site: 12:10 PM