Loading...
HomeMy WebLinkAboutNCC201356_NOT Closeout Documents_20210128North Carolina Department of Environmental Quality Land Resources: 127 Cardinal Drive Extension, Wilmington, NC 28405 (910) 796-7215 County: Duphn Project: Hall Solar Person financially responsible: Axis Energy, Inc. - Jeff Filippo Address: 400 Interstate North Parkway, Ste750, Atlanta, GA 1. Project Location: Murray PI Lane, Greenevers Pictures: No 2. Weather and soil conditions: 50 rain 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: River basin: Cape Fear Project #: DUPLI-2019-004 Initial inspection: No If no, check violations below: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: 10. Comments: file closed Reported by: Brian Lambe Date of inspection: January 27, 2021 cc: Title: Date given/sent: January 28, 2021 Yes Others present: Time arriving on site: 12:00 PM Time leaving site: 12:10 PM