Loading...
HomeMy WebLinkAboutNCG020795_DMR Upload Review_20210129Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 1/22/2021 10:50:05 AM (DMR Submittal) Submit by McCoy, Suzanne 1/29/2021 3:15:43 PM (DMR Submittal Review) • The task was assigned to McCoy, Suzanne 1/22/2021 10:50 AM d� 4 NORTH LAROLI NA Enrlmnmenfcl Quouty DMR Submittal from 1/22/2021 Permit and Facility Information: Permit Number* Enter ODCor Individual Fbrrrit Ninber NCG020795 Mast begin w ith NCS or Na,- Facility Name:* Sibelco North America Schoolhouse Quartz Facility County:* Avery Note: Facility name and county are used to help the reviewer verify the permit number entered, and to display the Regional Office address on the submitter's form (not here). These metadata details will be pulled from current BIMS information after the DMR(s) are filed. If the submittal is accepted, simply note any errors in the reviewer's comments. Monitoring Period Information: Monitoring Period VUTatisthe YEAR ofthe sanpledate(s)? Year:* 2020 DM R Upload* Oickthe upload button or drag and drop files here to attach document. StormWater DMR 2020.pdf 2.28MB Only FDFs are accepted. Comments: * W By checking the box and signing box below, I certify that: have given true, accurate, and complete information on this form; • I agree that submission of this Data Monitoring Report (DMR) upload form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature on this upload form has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit this DMR upload form. Full Name:* Stephen Andrew Wilson Nerre of person subnitting this form Email Address:* steve.wilson@sibelco.com Phone Number:* 8287654251 Signature: } Date:* 01/22/2021 Review Review Date: 01/29/2021 Confirm Permit No.* Correct the perrrit ID nurrber if needed. NCG020795 ConfirmDMRYear* 2020 Multiple DMRs will be automatically filed in a subfolder denoting the sampling year entered above. Can submittal be r Yes accepted?* r No (Explain why below) Do Central Office r No staff need to be r Yes alerted?* Do Regional Office r No staff need to be r Yes alerted? Type of Permit* General Ensures DUZ s) filed correctly.