Loading...
HomeMy WebLinkAboutNCC210518_ESC Approval Submitted_20210129ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality January 16, 2021 LETTER OF APPROVAL WITH MODIFICATIONS Rhetson Companies, Inc. Attn: Jamie S. Encinosa, EVP of Operations 2075 Juniper Lake Road West End, NC 27376 RE: Project Name: Pembroke Melinda Road Dollar General Acres Approved: 1.5 Project ID: ROBES-2021-012 County: Robeson, City: Pembroke, Address: Melinda Road River Basin: Lumber Stream Classification: Other Submitted by: 4D Site Solutions Date Received by LQS: December 17, 2020 Plan Type: New Dear Mr. Encinosa: This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter of Approval with Modifications. A list of the modifications and reservations is attached. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413 .0129. Should the plan not perform adequately, a revised plan will be required (G.S. I I 3A-54. 1)(b). As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The NOI form may be accessed at deq.nc.gov/NCGOI. Please direct questions about the NOI form to Annette Lucas at Annette.lucas&ncdenr.gov or Paul Clark at Paul.clarkkncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. A $100 fee will be charged annually until a Notice of Termination is issued. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 413 .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. D_ E Q�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Fayetteville Regional Office 1 225 Green Street, Suite 7141 Fayetteville, North Carolina 28301 NORT1 CAROLING DgmwbmtoiEnviro­,taia,ar� /`� 910.433.3300 Letter of Approval with Modifications Rhetson Companies, Inc. January 16, 2021 Page 2 of 3 Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land - disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, 614; - a t Jodi Pace, EI Regional Engineering Associate DEMLR Enclosures: Certificate of Approval Modifications Required for Approval NPDES NCGO1 Fact Sheet cc: Scott Brown, 4D Site Solutions, Inc. - electronic copy Pieere Locklear, Building Inspector - electronic copy DEMLR - Fayetteville Regional Office File Letter of Approval with Modifications Rhetson Companies, Inc. January 16, 2021 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: PEMBROKE MELINDA ROAD DOLLAR GENERAL Project Number: ROBES-2021-012 County: ROBESON The newly graded part of the roadside ditch must have matting, more robust than straw w/ net, "Immediately Upon Grading". This must be big and bold with a leader line. Provide a matting detail, installation specifications and maintenance requirements. Provide two full size copies each of revised plan sheets, showing all the Modifications required for approval, prior to beginning any land -disturbing activity. Per G.S. 113A-57(4), 15A NCAC 0413.0118 & G.S. 113A-54(d)(4)