Loading...
HomeMy WebLinkAbout310593_Compliance Evaluation Inspection_20210119Facility Number &'Division of Water Resources 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit: Comm Hance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: ('Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: i 9 nZ f Arrival Time: 0 ao^- Departure Time: County: IV I �/y Farm Name: Mo Of- ` � I u 22! �j N o� 1o.,rm Owner Email: Owner Name: i2ia; yV-1- �' TQLkLAND Phone: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator:a� Back-up Operator: Location of Farm: Title: Latitude: Phone: Integrator: Region: W 1 R6 Certification Number: 49�Q3� Certification Number: Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Wean to Finish Wean to Feeder Feeder to Finish 1 Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Other Layer Non -Layer 1V Vll-L Pullets Other Poults Design Current Longitude: Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes ®No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes VN ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes to NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412015 Continued Facility Number: jDate of Inspection: ` Ict c,l Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Identifier: 4 Spillway?: Designed Freeboard (in): Observed Freeboard (in): ❑ Yes Structure 4 Structure 5 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? VNc ❑ NA ❑ NE I�To ❑ NA ❑ NE Structure 6 ❑ Yes EZT7No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes ["No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes To ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes E2"<o ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need [:]Yes o ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ED I1 o ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes Wl�o ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes M40, ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes U40 ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes 02'<o ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes E; V ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes lam' o ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes Eg-<o ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes []-No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? [:]Yes NA ❑ NE Page 2 of 3 21412015 Continued Facility Number: - Date of Inspection: 1 I 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑Yes M< ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ YesEIN/o ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes MrTo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No [t"NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: ❑ Yes �No ❑ NA ❑ NE ❑ Yes EKo ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA Er E 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes 34. Does the facility require a follow-up visit by the same agency? ❑ Yes [�T ❑NA ❑NE ;0/[:] ❑ NA ❑ NE L�NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). �e a of J �y (� �-73 ` i (,-�'n 1S Reviewer/Inspector Name: S o V! o F R_a-4 Reviewer/Inspector Signature: Page 3 of 3 Phone: rl w HL - K 77 Date: N 21412015