HomeMy WebLinkAbout310593_Compliance Evaluation Inspection_20210119Facility Number
&'Division of Water Resources
0 Division of Soil and Water Conservation
0 Other Agency
Type of Visit: Comm Hance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
Reason for Visit: ('Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: i 9 nZ f Arrival Time: 0 ao^- Departure Time: County:
IV I
�/y
Farm Name: Mo Of- ` � I u 22! �j N o� 1o.,rm Owner Email:
Owner Name: i2ia; yV-1- �' TQLkLAND Phone:
Mailing Address:
Physical Address:
Facility Contact:
Onsite Representative:
Certified Operator:a�
Back-up Operator:
Location of Farm:
Title:
Latitude:
Phone:
Integrator:
Region: W 1 R6
Certification Number: 49�Q3�
Certification Number:
Design Current Design Current
Swine Capacity Pop. Wet Poultry Capacity Pop.
Wean to Finish
Wean to Feeder
Feeder to Finish 1
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Boars
Other
Other
Layer
Non -Layer
1V Vll-L
Pullets
Other
Poults
Design Current
Longitude:
Design Current
Cattle Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
❑ Yes
®No ❑ NA
❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
❑ Yes
❑ NA
❑ NE
b. Did the discharge reach waters of the State? (If yes, notify DWR)
❑ Yes
VN ❑ NA
❑ NE
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
❑ Yes
No ❑ NA
❑ NE
2. Is there evidence of a past discharge from any part of the operation?
❑ Yes
to NA
❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters
❑ Yes
No ❑ NA
❑ NE
of the State other than from a discharge?
Page I of 3 21412015 Continued
Facility Number: jDate of Inspection: ` Ict c,l
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes
a. If yes, is waste level into the structural freeboard?
Structure 1 Structure 2 Structure 3
Identifier: 4
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in):
❑ Yes
Structure 4 Structure 5
5. Are there any immediate threats to the integrity of any of the structures observed?
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
waste management or closure plan?
VNc ❑ NA ❑ NE
I�To ❑ NA ❑ NE
Structure 6
❑ Yes EZT7No ❑ NA ❑ NE
❑ Yes No ❑ NA ❑ NE
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement?
❑ Yes
["No
❑ NA
❑ NE
8. Do any of the structures lack adequate markers as required by the permit?
❑ Yes
To
❑ NA
❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
❑ Yes
E2"<o
❑ NA
❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
[:]Yes
o
❑ NA
❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below.
❑ Yes
ED I1 o
❑ NA
❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application
Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes Wl�o
❑ NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
❑ Yes M40,
❑ NA
❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
❑ Yes U40
❑ NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes 02'<o
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes No
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes E; V
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes lam' o
❑ NA
❑ NE
the appropriate box.
❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements
❑ Other:
21. Does record keeping need improvement? If yes, check the appropriate box below.
❑ Yes Eg-<o
❑ NA
❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis
❑ Waste Transfers
❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections ❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge?
❑ Yes []-No
❑ NA
❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment?
[:]Yes NA
❑ NE
Page 2 of 3
21412015 Continued
Facility Number: - Date of Inspection: 1 I
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑Yes M< ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ YesEIN/o ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes MrTo ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No [t"NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
❑ Yes �No ❑ NA ❑ NE
❑ Yes EKo ❑ NA ❑ NE
❑ Yes No ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA Er E
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes
34. Does the facility require a follow-up visit by the same agency? ❑ Yes
[�T ❑NA ❑NE
;0/[:]
❑ NA ❑ NE
L�NA ❑ NE
Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations (use additional pages as necessary).
�e
a
of
J �y (�
�-73 ` i (,-�'n 1S
Reviewer/Inspector Name: S o V! o F R_a-4
Reviewer/Inspector Signature:
Page 3 of 3
Phone: rl w HL - K 77
Date: N
21412015