Loading...
HomeMy WebLinkAbout310476_Compliance Evaluation Inspection_20210121aDivision of Water Resources 131 M S — Facility Number O Division of Soil and Water Conservation O Other Agency Type of Visit: 0 Compliance Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason for Visit: CJ Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: t Arrival Time: U Art Departure Time: o yr► County: QRegion: W) XO Farm Name: CT (Z F G— ?j (Zo'A 0 I O of Owner Email: Owner Name: I` &" U �V_0,1-1'j Phone: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Title: Integrator: Phone: Certified Operator: (3-rE + D f�)X.Ai''\ Certification Number: 1 d o 1 Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Other Certification Number: Latitude: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. Layer I I --d Non -Layer Design Current Dry Pnnitry Canacity Pon. Layers Non -Layers Pullets Turkeys Turkey Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? Longitude: Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes [/No ❑ NA ❑ NE ❑ Yes E14 ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes [_4�o ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes � ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412015 Continued Facility Number: Date of Inspection: ) ) Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes E!fNo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes dNo ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: OLD N E'J Spillway?: Designed Freeboard (in): I S 19 . s _ Observed Freeboard (in): D 301 -;? _ fjO!1 W��+ie" 0V% lellO Pj (� 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes 2/No ❑ NA ❑ NE ❑ Yes Ea"No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmenta threat, notify DWR Y p ❑ ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): Q 41 -F 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes []`No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes E3,<o ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes [?No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes EYN0 ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents � 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes I _I 1V ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes VNo ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. [:]Yes / No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes u lv ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE Page 2 of 3 21412015 Continued Facility Number: 11 - 47 (o Date of Inspection: � a j 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes VNo ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes FE 4o ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No ENA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: ❑ Yes 0�o ❑ NA ❑ NE ❑ Yes [/No ❑ NA ❑ NE ❑ Yes dNo ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA � 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes 34. Does the facility require a follow-up visit by the same agency? ❑ Yes �o ❑NA ❑NE 7❑NA ❑NE No ❑ NA ❑ NE Comments (refer to question ft Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). u L,;L 1 0 36, a - ;t G--� 36:5-" P:; Reviewer/Inspector Name: So 1A N rE n't `i Reviewer/Inspector Signature: Page 3 of 3 Phone: (90) %17 -9 Date: 0 a d 21412015