HomeMy WebLinkAbout310476_Compliance Evaluation Inspection_20210121aDivision of Water Resources 131 M S —
Facility Number O Division of Soil and Water Conservation
O Other Agency
Type of Visit: 0 Compliance Inspection O Operation Review O Structure Evaluation O Technical Assistance
Reason for Visit: CJ Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access
Date of Visit: t Arrival Time: U Art Departure Time: o yr► County: QRegion: W) XO
Farm Name: CT (Z F G— ?j (Zo'A 0 I O of Owner Email:
Owner Name: I` &" U �V_0,1-1'j Phone:
Mailing Address:
Physical Address:
Facility Contact:
Onsite Representative:
Title:
Integrator:
Phone:
Certified Operator: (3-rE + D f�)X.Ai''\ Certification Number: 1 d o 1
Back-up Operator:
Location of Farm:
Swine
Wean to Finish
Wean to Feeder
Feeder to Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Boars
Other
Other
Certification Number:
Latitude:
Design Current Design Current
Capacity Pop. Wet Poultry Capacity Pop.
Layer I I --d Non -Layer
Design Current
Dry Pnnitry Canacity Pon.
Layers
Non -Layers
Pullets
Turkeys
Turkey Poults
Other
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
Longitude:
Design Current
Cattle Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
❑ Yes [/No ❑ NA ❑ NE
❑ Yes E14 ❑ NA ❑ NE
b. Did the discharge reach waters of the State? (If yes, notify DWR)
❑ Yes [_4�o
❑ NA
❑ NE
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
❑ Yes No
❑ NA
❑ NE
2. Is there evidence of a past discharge from any part of the operation?
❑ Yes �
❑ NA
❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters
❑ Yes No
❑ NA
❑ NE
of the State other than from a discharge?
Page 1 of 3 21412015 Continued
Facility Number: Date of Inspection: ) )
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes E!fNo ❑ NA ❑ NE
a. If yes, is waste level into the structural freeboard? ❑ Yes dNo ❑ NA ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier: OLD N E'J
Spillway?:
Designed Freeboard (in): I S 19 . s _
Observed Freeboard (in): D 301 -;? _
fjO!1 W��+ie" 0V% lellO Pj (�
5. Are there any immediate threats to the integrity of any of the structures observed?
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
waste management or closure plan?
❑ Yes 2/No ❑ NA ❑ NE
❑ Yes Ea"No ❑ NA ❑ NE
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmenta threat, notify DWR
Y p
❑
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift
❑ Application Outside of Approved Area
12. Crop Type(s): Q 41 -F
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes
[]`No
❑ NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
❑ Yes
E3,<o
❑ NA
❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes
[?No
❑ NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes
EYN0
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes
No
❑ NA
❑ NE
Required Records & Documents �
19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes I _I 1V ❑ NA ❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes VNo ❑ NA ❑ NE
the appropriate box.
❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. [:]Yes / No ❑ NA ❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections ❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes u lv ❑ NA ❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE
Page 2 of 3 21412015 Continued
Facility Number: 11 - 47 (o Date of Inspection: � a j
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes VNo ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes FE 4o ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No ENA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
❑ Yes 0�o ❑ NA ❑ NE
❑ Yes [/No ❑ NA ❑ NE
❑ Yes dNo ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA �
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes
34. Does the facility require a follow-up visit by the same agency? ❑ Yes
�o ❑NA ❑NE
7❑NA ❑NE
No ❑ NA ❑ NE
Comments (refer to question ft Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations (use additional pages as necessary).
u
L,;L 1 0 36, a -
;t G--� 36:5-" P:;
Reviewer/Inspector Name: So 1A N rE n't `i
Reviewer/Inspector Signature:
Page 3 of 3
Phone: (90) %17 -9
Date: 0 a d
21412015