HomeMy WebLinkAbout310587_Other_20210112& Division of Water Resources 1M5—
Facility Number 3 ( - 560O Division of Soil and Water Conservation
-ko 1- la•- O Other Agency
(Type of Visit: �C �pepliance Inspection 0 Operation Review 10 Structure Evaluation O Technical Assistance I
Reason for Visit: outine O Complaint r ollow-up O Referral O Emergency O Other O Denied Access
Date of Visit: I - 13L- DDE� l Arrival Time: pO M Departure Time: 1I � County: [)q Ii
Farm Name: 6-DI 1"oyrT ll &'-M Owner Email:
Owner Name: �y►r�H {Y1ori el I Phone:
Mailing Address:
Physical Address:
Facility Contact: �) a Title: Phone:
Onsite Representative: / Y Integrator:
Certified Operator: Certification Number:
Back-up Operator: Certification Number:
Location of Farm: Latitude: Longitude:
Swine
Wean to Finish.
Wean to Feeder
Feeder to Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Boars
Other
Other
Design Current Design Current
Capacity Pop. Wet Poultry Capacity Pop.
Layer
Non -Layer
Design Current
Dry Pnultry Canacitv Pon.
Layers
Non -Layers
Pullets
Turkeys
Turkey Poults
Other
Regionw 8
Design Current
Cattle. Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
❑ Yes
®No ❑ NA
❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
❑ Yes
No ❑ NA
No
❑ NE
b. Did the discharge reach waters of the State? (If yes, notify DWR)
❑ Yes
[ ❑ NA
❑ NE
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
❑Yes
No ❑ NA
❑ NE
2. Is there evidence of a past discharge from any part of the operation?
❑ Yes
<o ❑ NA
❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters
❑ Yes
To ❑ NA
❑ NE
of the State other than from a discharge?
Page 1 of 3 21412015 Continued
Facility Number: -6 j - $ Date of inspection:
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate?
Y s
❑ No
❑ NA
❑ NE
a. If yes, is waste level into the structural freeboard?
VYes
❑ No
❑ NA
❑ NE
Structure 1 Structure 2 Structure 3 Structure 4
Structure 5
Structure 6
Identifier:
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in): -'
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes
["No
❑ NA
❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
Yes
❑ No
❑ NA
❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health
or environmental
threat,
notify DWR
Yes
7. Do any of the structures need maintenance or improvement?
Q
❑ No
❑ NA
❑ NE
8. Do any of the structures lack adequate markers as required by the permit?
❑ Yes
FE/No
❑ NA
❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
E /'es
❑ No
❑ NA
❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ❑ No ❑ NA [alE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
15. Does the receiving crop and/or land application site need improvement?
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
acres determination?
17. Does the facility lack adequate acreage for land application?
18. Is there a lack of properly operating waste application equipment?
❑ Yes ❑ No ❑ NA []"NE
❑ Yes ❑ No ❑ NA E IE
❑ Yes ❑ No ❑ NA 5-KIE,
❑ Yes ❑ No ❑ NA Ell<
❑ Yes ❑ No ❑ NA D-f
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes
❑ No
❑ NA
�
U 1V�
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
[:]Yes
[:]No
❑ NA
E�AXE
the appropriate box.
❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements
❑ Other:
21. Does record keeping need improvement? If yes, check the appropriate box below.
❑ Yes
❑ No
❑ NA
ETNE
❑ Waste Application . ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis
❑ Waste Transfers
❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections
❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge?
❑ Yes
❑ No
❑ NANE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment?
❑ Yes
❑ No
❑ NA
Page 2 of 3 21412015 Continued
Facility Number: 31 - S Date of Inspection: /'- 7 dL -aba
by
Yes
No NA
�NE
24. Did the facility fail to calibrate waste application equipment as required the permit?
❑
❑ ❑
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check
❑ Yes
❑ No ❑ NA
[j"�E
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail provide documentation of an actively certified operator in charge?
❑ Yes
❑ No ❑ NA
E
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification?
❑ Yes
❑ No FEI/NA
❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
34. Does the facility require a follow-up visit by the same agency?
❑ Yes ❑ No ❑ NA 2 NE
❑ Yes ❑ No ❑ NA E
❑ Yes ❑ No ❑ NA 52-KE
[—]Yes ❑ No ❑ NA �E
❑ Yes ❑ No
[Yes ❑ No
s ❑ No
❑ NA
911<
❑NA
❑NE
❑ NA
❑ NE
Comments (refer to question ft Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations (use additional pages as necessary).
�olnr. �cc�7 o.•�cd `l�,nni� �ya✓� 't'�d�:. `ko . .ihs�Oecf- �e a6ay.n(o►�ed /��o�ri w,Yh
��cer►,S ov@r F43 Q �" pt r-S' -S* Y4 pA-iSr
y,e l nook 'is a-4 7-rverq. i s Q So I; dl. �e-f�i �Je ea4r o,_ ' Me_ d;v�-e
A�i +hc rC10V1r% C'+ ac-C /'l°r�� �a �'�7e . Siru CYv rk / I `^- 11
,�1�� o.� ��e Q'r'/<t
\Ka81 c
�ocr-e 1'I
Reviewer/Inspector Name
Phone: C °11, ) 6 1 7-" 9 S3L7
Reviewer/Inspector Signature:
Page 3 of 3
Date: 61-19--aua
21412015