Loading...
HomeMy WebLinkAbout310082_Plan of Action_20210115PLAN OF ACTIONI(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 1-82 County: Dupiin Facility Name: Vestal Farm Certified Operator Na*: William Kilpatrick Operator Number: 989077 1. Current liquid level() in inches as measured from the current liquid level in the lagoon to the lowest point on the fop of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Vestal I 31 2. Check all applicable items Liquid love is within the designed structural freeboard elevations of one or more structures. p Five and 3 day Plans of Action are attached. Hydraulic and agronomic balances are within acc table ranges. X Liquid leve is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Pla of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumf ied and hauled is reflected in section III tables. Included within this plan is a list of the prop Dsed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation vill be partially or fully depopulated. *Attach a c omplete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard evels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: irrigation has begun I hereby certify that I have reviewed the information listed above and included within the attached Plan of Act on, and to the best of my knowledge and ability, the information is accurate and correct. Greer Moore for: John Kilp trick Facility O ner/Manager (print) John Kilp trick Facility Owner/Manager (signature) Phone: (910) 290-0151 Date: 1 /1512021 PLAT OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE (LAND APPLIED PER WASTE STRUCTURE 1. Structure *elldentifier (ID): Vestal 2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard current liquid level according to marker 31.D inches designed 25 yr.124 hr. storm & structural freeboard 34.0 inches line b - line a (inches in red zone) = 3.0 inches top of dike surface area according to design (area at below structural freeboard elevation) 10322.3 ft2 line c112 x line d x 7.48 gallons/ft:' 19303 gallons 3. Projected v�lume of waste liquid produced during draw down period temporary storage period according to structural design 18D days volume of waste produced according to structural design 329591 ft3 current herd # 9792 certified herd #1 9792 actual waste produced = current herd # x line g = 329891 ft' certified herd # i. volume of wash water according to structural design �ft3 j, excess rainfall over evaporation according to design 178378 ft3 <. (lines h + i + j) x 7.48 x 30 days/line f= 633642 gallons 4. Total PAN t be land applied during draw down period I. current waste analysis dated I 11/22/2020 2.04 Ibsi1000 gal. REPEAT SECTION I F (Click on the next Str {(lines e + k)I1000) x line I = 1332.0 lbs. PAN EACH WASTE STRUCTURE ON SITE. re tab shown below) PoA (30 Day) 2/21/00 iI. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure I : Vestal line m = 1332.0 lb PAN 2. Structure I : line m = lb PAN 3. Structure l : line m = lb PAN 4. Structure i : line m = lb PAN 5. Structure I : line m = lb PAN 6. Structure I : line m = lb PAN n. lines 1 +2+3+4+5+6= 1332.0 lb PAN III. TOTAL PAN BA NCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN D�Dinn nn iunT I I T j:t9=1 nc Try wH1C_1­11 PAN rANNC}T RF APPLIFn ❑tIRING THIS 30 DAY PERIOD. 0. tract # p. field # q. crop r. acres s. remaining IRR- 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs_) column r x s u. application window' P 1A Wheat 96.53 96.50 9315.1 9/1-4/30 P 1 B WC 62.45 30.00 1873.5 911-4/30 'State current crop ending application date or next crop application oeginning gate Tor avaiia01e receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 11188.6 lb. PAN IV_ FACILITY'S PoA VERALL PAN BALANCE w. Total P4N to be land applied (line n from section II) = 1332.0 lb. PAN PoA (30 Day) 2/21100