Loading...
HomeMy WebLinkAboutWQ0042222_Application (FTSE)_20210127Permit Number W00042222 Program Category Non -discharge Permit Type Gravity Sewer Extension, Pump Stations, $ Pressure Sewer Extensions Primary Reviewer dean.hunkele Coastal SWRuIe Permitted Flow Facility Central Files: APS _ SWP 1 /8/2021 Permit Tracking Slip Status Project Type In review New Project Version Permit Classification A Individual Permit Contact Affiliation Facility Name Major/Minor Region Camp Lejeune and ONWASA Force Main Interconnect Minor Wilmington Location Address County Onslow Facility Contact Affiliation Owner Owner Name Owner Type Commanding Officer Marine Corps Base Camp Lejeune Government - Federal Owner Affiliation Robert A. Lowder Post Ln Building 12 Rm 244 / Dates/Events Camp Lejeune NC 28542 Scheduled Orig Issue App Received Draft Initiated Issuance Public Notice Issue Effective Expiration 1 /6/2021 RECEIVED Kimley>Morn January 5, 2021 NCDEQ Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 Subject: Fast Track Sewer System Extension Application Camp Lejeune Water[Wastewater Repairs Phase 2 — ONWASA Force Main Interconnection MCBCL Public Works Division 1005 Michael Road Camp Lejeune, NC 28547 To Whom it May Concern, JAN 0 6 2021 NCDEQ WILMINGTON RO Submitted is the fast track sewer system extension application for the above referenced project at Marine Corp Base Camp Lejeune located in Camp Lejeune, NC for your review and approval. This submittal is for a total of approximately 30' LF of 20" DI force main piping to provide an interconnection between an existing 24" Camp Lejeune force main and existing 24" ONWASA force main. The interconnection will only be used to direct flow from the Camp Lejeune force main into the ONWASA force main in emergency situations (i.e. force main failure). A previous agreement was reached between Marine Corp Base Camp Lejeune and Onslow Water and Sewer Authority that allows these interconnections. This package includes the following: • $480 Application Fee • NCDEQ Fast Track Sewer System Extension Application (FTA 04-16) • Site Maps • Intergovernmental Service Agreement between MCIEAST-MCB CAMLEJ and ONWASA Should you have any questions or comments, please do not hesitate to contact me by phone or by e- mail at 757-355-6677 or scott.funk@kimley-horn.com. Sincerely, KIMLEY-HORN AND ASSOCIATES, INC. Scott Funk, PE Project Manager Enclosure State of North Carolina DWR Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: W 6: Q `99-�' (to be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: MCBCL Public Works Division (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ® Municipal ❑ Other 3. Signature authority's name: Talia (Barraco) Pendergast. EI per 15A NCAC 02T .0106(b) Title: PWD Civil Engineer 4. Applicant's mailing address: 1005 Michael Road City: Camp Lejeune 5. Applicant's contact information: State: NC Zip: 28547-_ Phone number: (910) 451-3238 Email Address: talia.barraco@usmc.mil II. PROJECT INFORMATION: 1. Project name: Marine Corp Base Camp Lejeune Water and Wastewater Repairs Phase II 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: W000 3. County where project is located: Onslow Counri 4. Approximate Coordinates (Decimal Degrees): Latitude: 34.6728' Longitude:-77.3245' 5. Parcel ID (if applicable): (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Gerald Scott Funk License Number: 039669 Firm: Kimley Horn Mailing address: 4525 Main St Suite 1000 City: Virginia Beach State: VA Zip:23462 Phone number: 757) 355-6677 Email Address: Scott.Funknakimlgy-hom.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: French Creek Wastewater Treatment Plant Permit Number: NCO063029 Owner Name: Camp Lejeune V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQ_ Downstream (Receiving) Sewer Size: inch System Wide Collection System Permit Number(s) (if applicable): WQCS Owner Name(s): _ FORM: FTA 04-16 Page 1 of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? [-]Yes [—]No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM, DEV) been attached? ❑ Yes ❑No ®N/A 3. If the Applicant is a Home/Property Owners' Association has an Operational Agreement (FORM: HOA) been attached? ❑ Yes [:]No ®N/A 4. Origin of wastewater: (check all that apply): ❑ Residential Owned ® Retail (stores, centers, malls) ❑ Car Wash ❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse ® Food and drink facilities ❑ Church ❑ Swimming Pool]Filter Backwash ® Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic/Commercial % Commercial _ % Industrial (See 15A NCAC 02T .0103(20)) ),Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Has a flow reduction been approved under I5A NCAC 02T .0114(f)? ❑ Yes ® No ➢ If Yes, Provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(f)) Daily Design Flow a,b No. of Units Flow gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total GPD a See 15A NCAC 02T 0114(b). (d) (e)(l) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: n/a GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ® Other (Explain): no change in existing flows FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT I. Pump station number or name: _ 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: 3. Design flow of the pump station: _ millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): _ gallons per minute at _ feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T.0305(h)(1)(B)_ ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T 0305(f) & (g) ® Yes ❑ No 15A NCAC 02T.0305(f) contains minimum senarations that shall he. nmvided fnr sewer sysramc• Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 24 inches Water mains (vertical -water over sewer including in benched trenches) 18 inches Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands (see item IX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top sloe of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches ➢ 15A NCAC 02T.0305(e) contains alternatives where separations in 02T.0305(0 cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications weboage ➢ If noncompliance with 02T.0305(t) or (g), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes ❑ No ❑ N/A ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200•? ❑ Yes ❑ No ® N/A ➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or ® Yes ❑ No individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer Permitting Branch 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ® No ❑ N/A ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall he inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: I. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest ver9ml and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? 0/ If No, complete and submit the Variance/Alternative review. Approval of the request is required nrior 2. Professional Engineer's Certification: I. l X.:LlM.r7 S Chi ❑ No Request application (VADC 10-14) and supporting documents for (Professional Engineer's name from Application Item III.1.) that this application for has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: 3. Applicant's Certification per 15A NCAC 02T .0106(b): (Signature Authority's name & title from Application Item I.3.) that this application for has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: /mac ' Date: 11_ D@e 2D20 FORM: FTA 04-16 Page 5 of 5 INTERGOVERNMENTAL SERVICE AGREEMENT BETWEEN MARINE CORPS INSTALLATIONS EAST -MARINE CORPS BASE CAMP LEJEUNE (MCIEAST-MCB CAMLEJ) AND THE ONSLOW WATER AND SEWER AUTHORITY (ONWASA) FOR THE PARTNERSHIP WITH ONWASA FOR THE INTERCONNECTABILITY OF WASTEWATER FORCE MAINS M67358-190131-A004 This is an Intergovernmental Service Agreement (IGSA) between the MCIEAST-MCB CAMLEJ and ONWASA. When referred to collectively, MCIEAST-MCB CAMLEJ and ONWASA are referred to as the "Parties". 1. BACKGROUND: Since February 2004, the Parties have had a successful agreement regarding the sales of potable drinking water, sewage collection, and disposal utility services. The existing agreement includes the approval of a dedicated 24" wastewater force main that runs from the ONWASA wastewater lift station on Piney Green Road directly to the MCIEAST-MCB CAMLEJ Wastewater Treatment Plant. Currently the PT3C wastewater lift station, which receives flows ranging from 2.1 MGD to 3.5 MGD, has no feasible alternative for discharge. The existing ONWASA Piney Green 24" force main would provide that additional conveyance, in the event of an emergency, by allowing a merge in flow from MCIEAST-MCB CAMLEJ. There have been several breaks in the past (7/16/2012, 8/21/2013, 8/26/2013, and 01/02/2018) where an alternative line would have been beneficial by diverting flow from the areas under repair into the existing ONWASA line. In addition, this connection will provide the ability to perform routine maintenance on either the MCIEAST-MCB CAMLEJ or ONWASA lines while maintaining continuity of service. 2. AUTHORITIES: The following authorities are referenced and used in support of this agreement. 2.1. Department of Defense Instruction 4000.19, Support Agreements 2.2. MCIEAST-MCB CAMLEJ MOA M67358-120604-A003, The Community Military Cooperative Planning Group 2.3. Title 10 U.S.C. §2679, Installation -Support Service, Intergovernmental support agreements Subj: PARTNERSHIP WITH ONWASA FOR THE INTERCONNECTABILITY OF WASTEWATER SYSTEMS IN WASTEWATER EMERGENCIES 2.4. National Defense Authorization Act of 2013, and revised in 2015 2.5. MCICOM MPPI of FY 16 2.6. 40 CFR Parts 1500-1508, National Environmental Policy Act 3. PURPOSE: This IGSA establishes the roles, responsibilities, and protocols to be used by the Parties for the joint use of MCIEAST-MCB CAMLEJ and ONWASA wastewater collection systems in the event of an emergency. 4. RESPONSIBILITIES OF THE PARTIES: 4.1. Both Parties will - 4.1.1. Subject to availability of proper funds, compliance with paragraphs 2.1 through 2.6 above, and all other applicable environmental laws and regulations, MCIEAST-MCB CAMLEJ will be responsible for all design, permitting, bidding, construction, and provide funding for all costs associated with this wastewater interconnection project. The connection to the Piney Green ONWASA force main shall be made in accordance with the ONWASA Manual of Standards, Specifications and Details (MSSD), and ONWASA must review and approve the actual point of connection prior to the start of construction. 4.1.2. MCIEAST-MCB CAMLEJ will be responsible for ownership, maintenance, and repair of the new force main between the PT3C wastewater lift station and the point of interconnection. All repairs on the interconnection valve will be performed and funded by MCIEAST-MCB CAMLEJ as expeditiously as possible. 4.1.3 MCIEAST-MCB CAMLEJ will notify ONWASA and the North Carolina Department of Environmental Quality (NCDEQ) at least 24 hours prior to opening the interconnection. 4.1.4. All information concerning the location and functions of the interconnections will be "For Official Use Only." M67358-181001-A015 2 Subj: PARTNERSHIP WITH ONWASA FOR THE INTERCONNECTABILITY OF WASTEWATER SYSTEMS IN WASTEWATER EMERGENCIES 4.2. When an emergency sewer main break situation exists MCIEAST-MCB CAMLEJ will - 4.2.1. Notify NCDEQ via the MCIEAST-MCB CAMLEJ Utilities. If the emergency happens after hours, the State emergency hotline will be used by calling 800-858-0368. 4.2.2. Open the interconnection valve utilizing designated MCIEAST-MCB CAMLEJ Outside Plumbing personnel. 4.2.3. Close the interconnection valve utilizing designated MCIEAST-MCB CAMLEJ Outside Plumbing personnel once the sewer main is repaired. 4.2.4. Notify NCDEQ and ONWASA when the emergency no longer exists. 5. PERSONNEL: Each party is responsible for all costs of its personnel, including pay and benefits, support, and travel. Each party is responsible for supervision and management of its personnel. 6. GENERAL PROVISIONS: 6.1. POINTS OF CONTACT: The following points of contact (POC) will be used by the Parties to communicate in the implementation of this IGSA. Each Party may change its POC upon reasonable notice to the other Party. 6.1.1. For MCIEAST-MCB CAMLEJ AND MCASNR - 6.1.1.1. Primary: MCIEAST-MCB CAMLEJ Utilities Director for Water and Wastewater Phone: 910-451-7190 ext. 223 6.1.1.2. Alternate: MCIEAST-MCB CAMLEJ Water and Wastewater Foreman Phone: 910-451-7190 ext. 222 M67358-181001-AO15 3 Subj: PARTNERSHIP WITH ONWASA FOR THE INTERCONNECTABILITY OF WASTEWATER SYSTEMS IN WASTEWATER EMERGENCIES 6.1.2. For ONWASA - 6.1.2.1. Primary: CEO, ONWASA Phone: 910-937-7532 6.1.2.2. Alternate: Engineering Director, ONWASA Phone: 910-937-7521 6.2. CORRESPONDENCE: All correspondence to be sent and notices to be given pursuant to this IGSA will be addressed, if to the MCIEAST-MCB CAMLEJ and MCASNR, to: 6.2.1. Commanding General Attention: Deputy Public Works Officer 1005 Michael Road Camp Lejeune, NC 28542 And, if to ONWASA, to: 6.2.2. ONWASA Attention: CEO 228 Georgetown Road Jacksonville, NC 28540 6.3. REVIEW OF AGREEMENT: This IGSA will be reviewed annually on or around the anniversary of its effective date for financial impacts and triennially in its entirety. 6.4. MODIFICATION OF AGREEMENT: This IGSA may only be modified by the written agreement of the Parties, duly signed by their authorized representatives. 6.5. TRANSFERABILITY: This IGSA is not transferable except with the written consent of the Parties. 6.6. DISPUTES: Any disputes relating to this IGSA will, subject to any applicable law, Executive Order, Directive, or Instruction, be resolved by consultation between the Parties or in accordance with DoDI 4000.19. 6.7. TERMINATION OF AGREEMENT: This IGSA may be terminated by either Party by giving at least 180 days written notice to the other Party. The IGSA may also be terminated at any time upon the mutual written consent of the Parties. M67358-181001-AO15 4 Subj: PARTNERSHIP WITH ONWASA FOR THE INTERCONNECTABILITY OF WASTEWATER SYSTEMS IN WASTEWATER EMERGENCIES 6.B. ENTIRE AGREEMENT: It is expressly understood and agreed that this IGSA embodies the entire agreement between the Parties regarding the IGSA's subject matter. 6.9. EFFECTIVE DATE: This IGSA takes effect beginning on the day after the last party signs. 6.10. EXPIRATION DATE: This IGSA expires nine years from the date of final signature. 7. FINANCIAL DETAILS 7.1. AVAILABILITY OF FUNDS: This IGSA does not document the obligation of funds between the Parties. Any obligation of funds in support of this IGSA will be accomplished in accordance with the current regulations of the Parties. The obligation of funds by the Parties is subject to the availability of appropriated funds pursuant to the DoD Financial Management Regulation and the Local Government Budget and Fiscal Control Act. 7.2. FINANCIAL SPECIFICS: Appendixes (A) and (B) provide all other details and information on the support identified in paragraph 9. and in accordance with the Cost Benefit Analysis. AGREED: For ONWASA - — Atg= 'q'A,�, Je frey L. Hudson to Chief Executive Officer ONWASA Jacksonville, North Carolina For MCIEAST-MCB CAMLEJ - "A8 A L —DW I N Date Colonel, USMC Deputy Commander Marine Corps Installations East - Marine Corps Base Camp Lejeune, North Carolina M67358-181001-AO15 5 Subj: PARTNERSHIP WITH ONWASA FOR THE INTERCONNECTABILITY OF WASTEWATER SYSTEMS IN WASTEWATER EMERGENCIES APPENDIX A 1. Financial POCs: 2.1. MCIEAST-MCB CAMLEJ: 2.1.1. Primary: Comptroller Phone: 910-451-2427 2.1.2. Alternate: Deputy Comptroller Phone: 910-451-2427 2.2. ONWASA: 2.2.1. Primary: Chief Financial Officer Phone: 910-937-7545 2.2.2. Alternate: Senior Accountant/Budget Analyst Phone: 910-937-7568 M67358-181001-AO15 6 Subj: PARTNERSHIP WITH ONWASA FOR THE INTERCONNECTABILITY OF WASTEWATER SYSTEMS IN WASTEWATER EMERGENCIES APPENDIX B Cost Benefit Analysis Joint Use of MCIEAST-MCB CAMLEJ and ONWASA Wastewater Collection Systems in the Event of an Emergency Date: April 10, 2019 Service description and justification: The proposed agreement will grant approval to MCIEAST MCB-CAMLEJ to construct an interconnection and allow the use of an existing/dedicated 24" ONWASA owned wastewater force main during emergency situations. Currently the PT3C wastewater lift station, which receives flows ranging from 2.1 MGD to 3.5 MGD, has no feasible alternative for discharge. The existing ONWASA Piney Green 29" force main would provide that additional conveyance, in the event of an emergency, by allowing a merge in flow from MCIEAST-MCB CAMLEJ. There have been several breaks in the past (7/16/2012, 8/21/2013, 8/26/2013, and 01/02/2018) where an alternative line would have been beneficial by diverting flow from the areas under repair into the existing ONWASA line. In addition, this connection will provide the ability to perform routine maintenance on either the MCIEAST-MCB CAMLEJ or ONWASA lines while maintaining continuity of service. 1. Marine corps cost (No Partnership) a. What are annual costs to the Marine Corps to pay for the Service on its own? Without the proposed emergency interconnection, MCIEAST MCB-CAMLEJ would be required to construct a redundant wastewater with the capacity to handle 100% of the flow from Lift Station PT3C in the event of an emergency. A redundant line would cost in excess of $10,000,000 and would take years to complete. b. If not currently the Marine Corps the service? Please see above. provided, what are projected costs to to assemble funding and labor to start M67358-181001-A015 7 Subj: PARTNERSHIP WITH ONWASA FOR THE INTERCONNECTABILITY OF WASTEWATER SYSTEMS IN WASTEWATER EMERGENCIES 2. Community Cost (No Partnership) a. How long has the Local Government provided this Service for itself? This particular service has never been provided by the Government (at this specific location). b. What does the local government pay (or charge itself) for the service per year? This is not applicable for this particular situation. 3. Shared Partnership Agreement (IGSA is Implemented) a. What would the Marine Corps pay for the Service per year under the IGSA? $0 (see below in the comments field for an explanation). b. What does the Marine Corps save per year under the provisions of the IGSA (l.a. - 3.a. _?) $10,000,000.00, this would be a one-time construction cost and would not occur on an annual basis. C. Are their forecasted increases/decreases for the service cost per year? $0 (see below in the comments field for an explanation). Comments: The proposed wastewater interconnection will provide an alternative conveyance system during emergency situations, allowing flow to be directed to the existing MCIEAST MCB-CAMLEJ Wastewater Treatment Plant. The Base will still be treating its own waste, and therefore there will be no charge from ONWASA during this time. M67358-181001-A015 8