Loading...
HomeMy WebLinkAbout20131240 Ver 4_More Info Requested_20210125ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality January 25, 2021 DWR # 20131240 v4 Wake County Mr. Harshavardhan Tummalpally 336 Euphoria Court Cary, NC 27519 (Delivered via email at harshanaveena@gmail.com) Subject: REQUEST FOR ADDITIONAL INFORMATION 5201 Trinity Road Project — Riparian Buffer Authorization with Major Exception Dear Mr. Tummalpally, On November 25, 2020, the Division of Water Resources (Division) received your application requesting Authorization with Major Exception from the Division for the subject project. The Division has determined that your application is incomplete and cannot be processed. The application is on -hold until the following information is received: 1. Please confirm that the Army Corps of Engineers has verified the use of Nationwide Permit #39 for the project. The Division is concerned that the proposed 85 linear feet of rip -rap stabilization between two culverts (one existing, one proposed) will result in a loss of stream bed and function for this short segment of the UT to Richlands Creek, and therefore the project as a whole will exceed the 300 liner feet threshold in Nationwide Permit #39. [15A NCAC 02B .0611 (b)(2)] 2. Please confirm that the US Army Corps of Engineers has accepted the project purpose and need as stated in the application and supporting materials. [15A NCAC 02B .0611 (b)(2)] Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested information for the proper consideration of the application. Please respond in writing within 30 calendar days of receipt of this letter by sending one (1) copy of all of the above requested information to the 401 & Buffer Permitting Branch, 1617 Mail Service Center, Raleigh, NC 27699-1617 OR by submitting all of the above requested information through this link: https://edocs.deg.nc.gov/Forms/Supplemental-Information-Form (note the DWR# requested on the link is referenced above). If all of the requested information is not received within 30 calendar days of receipt of this letter, the Division will be unable to approve the application and it will be denied as incomplete. The denial of this Q ���North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 o.wb+em m e�mm�me�nw.ory 919.707.9000 5201 Trinity Road Project Request for Additional Information DWR # 20131240v4 Page 2 of 2 project will necessitate reapplication to the Division for approval, including a complete application package and the appropriate fee. Please be aware that you have no authorization under the Neuse River Riparian Buffer Protection Rule (15A NCAC 02B .0611) for this activity and any work done within waters of the state or riparian buffers may be a violation of North Carolina General Statutes and Administrative Code. Please contact Rick Trone at Rick.Trone@ncdenr.gov if you have any questions or concerns. Sincerely, E DOCUSigned by: 949D91 BA53EF4E0... Paul Wojoski, Supervisor 401 & Buffer Permitting Branch cc: Lyle Phillips, USACE Raleigh Regulatory Field Office (via email) Bob Zarzecki, S&EC DWR 401 & Buffer Permitting Branch file