HomeMy WebLinkAboutNCC201997_NOT Closeout Documents_20210127North Carolina Department of Environmental Quality
Land Resources: 1628 Mail Service Center, Raleigh, NC 27699 (919) 791-4200
County: Northampton Project: Seaboard Solar Farm Drainage River basin: Chowan
Person financially responsible: Duke Energy Renewables, LLC - Christopher M Project #: NORTH-2020-003
Fallon, Vice President
Address: 550 South Tryon Street, Charlotte, NC 28202
1. Project Location: Hargraves Rd, Clayton
Pictures: No
2. Weather and soil conditions: cold wet workable Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? N/A
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): Kristen Vick Title:
Inspection report: Sent Report Date given/sent: January 25, 2021
9. Corrective action needed:
10. Comments: This project is stable and will be closed in our office. The closeout was accomplished using
photos of the site with the understanding that there are no erosion issues.
Reported by: Thaddeus Valentine Others present: No one
Date of inspection: January 25, 2021 Time arriving on site: 1:15 PM Time leaving site: 1:30 PM
cc: