Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCC200862_NOT Closeout Documents_20210125
R©Y COOPER F.: MICHAEL S. REGAN Se�rerary �"' auras � BRIAN WRENN NORTH CAROLINA Director Environmental Quato SEDIMENT AND EROSION CONTROL & CONSTRUCTION STORMWATER INSPECTION REPORT Dear Sir or Madam: Attached is a copy of the inspection report prepared following an onsite inspection of the project referenced on the report_ This report is intended to inform you of the project's compliance with the North Carolina Sedimentation Pollution Control Act of 1973 and Construction NP©ES Stormwater General Permit. Please review this report carefully as it may contain corrective actions needed and/or comments which will assist you in meeting the required performance standards. It is our desire that any and all possible problems be discussed and resolved at the earliest possible time. To facilitate this effort, please contact me at the address/phone number below should you have any questions. Sincerely, Scott Graboski Environmental Specialist (252) 946-6481 Enclosure: Sediment/Construction 5tormwater Inspection Report North Carol€ a Department of F vtronme�ntai Quadaty D'v3sion of Energy. Min�ry and Land Resourres, E Q� Washington Regional Office 943 Wax ;hingrvn Sge3are Mail Washington- North Carolina d7884 �r^i 752.946.6481 Sedimentation/Construction S North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Dare Project: Town of Nags Head - West Side River basin: Pasquotank Person financially responsible: Town of Nags Head - Cliff Ogburn, Town Manager Project #: DARE-2020-007 Address: P.G. Box 99, Nags Head, NC 27959 1. Project Location: US 158, Nags Head Pictures: No Z. Weather and soil conditions: 55 degrees, sunny, dry 3_ Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: Initial inspection: No If no, check violations below: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? [check all that apply) Degree of damage: 8. Contact made with (name): No one was on -site. Title: Inspection report: Sent Report Date given/sent: January 20, 2021 4. Corrective action needed: None. 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is released. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via a Notice of Termination. Reported by: Scott Graboski Others present: Date of inspection: January 14, 2021 Time arriving on site: l :10 pM Time leaving site: 1:20 PM cc: Yes