Loading...
HomeMy WebLinkAboutNCC205809_ESC Approval Submitted_20210128Iredell County Planning & Development Erosion Control Section 349 North Center Street P.O. Box 788 Statesville, NC 28687 Date: October 71h 2020 LETTER OF APPROVAL WITH MODIFICATIONS Michael Sullivan Cheney Brothers Inc. 1 Cheney Way Riviera Beach, FL 33404 RE: Project Name: CBI Truck Parking Acres Approved with Modifications: 7.09 Project ID: STVLE-2021-022 Project Location: PIN 4773146011.000 Submitted By: CESI, Inc. Date Received: September 22°d 2020 Plan Type: New Dear Mr. Sullivan: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and herby issue this Letter of Approval with Modifications. Modifications must be received in this office no later than two weeks prior to the project start date. Failure to submit modified plans can result in a violation and fine under the Iredell County Land Development Code. The Modifications required for Approval are listed on the attached page. The Certificate of Approval issued by Iredell County must be posted at the job site. This plan approval shall expire three (3) years following the date of this approval as is required by Title 15A NCAC 413.0129 and Appendix H of the Iredell County Land Development Code. Title 15A NCAC 4B 0118(a) and Appendix H of the Iredell County Land Development Code requires that a copy of the approved erosion control plan be on file at the job site. Any amendments and/or revisions to the approved plan must be reviewed and approved prior to implementation in order for the site to remain in compliance. Failure to submit plans for approval may result in administrative actions and/or penalties as indicated in the Iredell County Land Development Code. Also, this letter gives notice as required by G.S. I I3A-61.1(a) and Appendix H of the Iredell County Land Development Code, of our right of periodic inspection to insure compliance with the approved plan. Iredell County's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the Letter of Approval with Modifications CBI Truck Parking October 7'h 2020 Page 2 of 3 commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Iredell County Land Development Code and the Sedimentation Pollution Control Act of 1973, (North Carolina General Statute I I3A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act and Code. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. It is the responsibility of the applicant to obtain all other required permits or approvals. As of May 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGOI permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it is required that this office to be notified of the proposed starting date for this project. Failure to notify this office of the starting date may result in a Notice of Violation and civil penalty. Please notify us when you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Jonathan Williams Erosion Control Inspector II Enclosures: Modifications Fact Sheet on the New NCG01 Permit Permit Letter of Approval with Modifications CBI Truck Parking October 71h 2020 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: CBI Truck Parking Project ID: STVLE-2021-022 County: Iredell Reviewed by: Jonathan Williams Required changes are designated as "RC" under legal authority from NC General Statutes Chapter 113A Article 4 and the Iredell County Land Development Code. Suggested changes are designated as "SC" for improvement of the plan. 1. Land disturbing activity on parcel PIN 4773036612.000 shall not take place without providing a letter of permission from the City of Statesville allowing Cheney Brothers Inc. to perform land disturbing activity or documentation verifying the purchase of the parcel by Cheney Brothers Inc. —RC 2. Ensure SSB-2 outlet structure complies with the City of Statesville stream buffer regulations. —RC 3. Ensure all values for basins SSB-1 and SSB-2 are correct. —RC 4. Adjust SSB-I skimmer orifice to 1.5 inches to dewater the required basin volume in as close to 3 days' time possible. —RC 5. Adjust SSB-I dimensions to meet the required surface area of 2,249 ft'`. —RC 6. Install additional baffle for the natural drainage ditch feeding SSB-2 so that runoff entering the basin passes through 3 baffles before entering the skimmer in Phase I and start of Phase 2 until area is filled in. —RC 7. Install diversions for runoff to enter SSB-1 at a single point through a slope drain. —RC 8. In the Construction Sequence add language to clear only what is needed in order to install erosion control measures. Once measures are installed schedule an initial inspection prior to any other site grading. —RC 9. In the construction entrance detail add language that any sediment tracked in the road will be cleaned up immediately. --RC 10. Provide a copy of permits from NCDOT and/or City of Statesville for road right-of-way and/or utility disturbance as applicable. -RC 11. Install rock donut inlet protection for D1 B3 during Phase 2. -SC