Loading...
HomeMy WebLinkAboutSW6201004_O&M Agreement_20210126Project Name: Project Location: BlackhawkLanding Rockfish Road, Hoke County NC 'Cover Page Maintenance records shall be kept on the following BMP(s). This maintenance record shall be kept in a log in a known set location. Any deficient BN1Pelements noted in the inspection will be corrected, repaired, or replaced immmmmdimte!y. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s). The BMP(s) on this project include (check all that apply & corresponding O&M tables wil BiorehandonCeU Quantity: Dry Detention Basin Quantity: Grassed Swale Quantity.- Green Roof Quantity Infiltration Basin Quantity: Infiltration Trench Quantity: Level SproedanVFS Quantity: Permeable Pavement Quantity: Proprietary System Quantity: Rainwater Harvesting Quantity: Sand Filter Quantity: StormwaterVVet|and Quantity: Wet Detention Basin Quantity: Disconnected Impervious Area Present: User Defined BNYP Present: Locotkzn(o): Looetion(s): L000tion(s): Locatio(e): L000tion(o): Locotkon(e): Looaton(a): Looabon(e): Locadon(a): Locadon(n): Location(m): Looabon(a): Locabon(o): Location(o): Louetion(a): iDe aaaea auomonoa/ I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each B[NPabove, and attached O&M tables. | agree tonotify NCDENRofany problems with the system orprior toany changes tothe system orresponsible party. ° Responsible Party: Title &Organization: Street address: Cdy, shaba. zip: Phonenumber(s): Email: Signature: i J''`^ u� v(-%-- Hendrix Brothers of Hoke, ILLC Ralph Huff -Managing Partner 910-302-3608 County of .do hearby certify that personally appeared before mothis day of and acknowledge the due execution ofthe Operations a,nd Maintenance Agreement Witness my hand and official seal, Ja to V-11 MY COMMIS" EXPIRES UBUG My commission expires STORM-E Version 14 O&M Manual 1/512O21 Page 1of4 The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one ioprovided. Important maintenance procedures _ Immediately after the wet detention basin is estab|iahed. the plants on the vegetated shelf and perimeter ofthe basin should be watered twice weekly if needed, until the plants become established (commonly six weeka). No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should beminimized tothe maximum extent practical. - Once o year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.Oinches (or 1.5inches ifimaCoastal County). Records ofoperation and maintenance should bekept ino known set location and must beavailable upon request. Inspection activities shall beperformed aofollows, Any problems that are found shall berepaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire IBMP Trash/debris is present. Remove the trash/debris. The perimeter of the BMP Areas of bare soil and/or Regrade the soil if necessary to remove the gully, and then plant a erosive gullies have formed. ground cover and water until it is established. Provide lime and a one- time fertilizer application, Vegetation is too short or too Maintain vegetation at a height of approximately six inches. The inlet device The pipe is clogged. Unclog the pipe. Dispose of the sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to smooth it over and provide erosion swale. control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and replace with clean stone. covered in sediment (if The forebay Sediment has accumulated to Search for the source of the sediment and remedy the problem if a depth greater than the possible. Remove the sediment and dispose of it in a location where original design depth for it will not cause impacts to streams or the BMP. sediment storage. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional practices show that pruning is needed to maintain optimal plant Plants are dead, diseased or Determine the source of the problem: soils, hydrology, disease, etc. dying. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. STORM-EZ 1/5/2021 Version 1* O&M Manual Page 2of4 Wet Detention Pond Maiintenatide Riouirements,(CbintInped), The main treatment area Sediment has accumulated to Search for the source of the sediment and remedy the problem if a depth greater than the possible. Remove the sediment and dispose of it in a location where original design sediment it will not cause impacts to streams or the BMP. storage depth. Algal growth covers over 50% Consult a professional to remove and control the algal growth. of the area. Cattails, phragmites or other Remove the plants by wiping them with pesticide (do not spray). invasive plants cover 50% of the basin surface. The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and consult a professional to remove beaver activity is present. beavers. A tree has started to grow on Consult a dam safety specialist to remove the tree. the embankment. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Department of Environment and Natural damage have occurred at the Resources Regional Office. outlet. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. STORM-EZ 1/5/2021 Version 1.4 O&M Manual Page 3 of 4