Loading...
HomeMy WebLinkAboutwqcs00138_Annual Report_202101272O2O Wastewater Annual Report General lnformation: Facility/System Name: Caledonia Correctional lnstitute Responsible Entity: NC Department of Public Safetv ORC/Contact: Ravmond Price Applicable Permits: NC0027526/WQCS00138 Description of system: The Caledonia Wastewater Treatment Plant is permitted to treat 0.5 MGD from Tillery Correctional and Caledonia Correctional lnstitute, which includes an industrial cannery. The collection system includes four lift stations, gravity collection pipes, and force mains. Treatment consists of two primary lagoons in parallel, followed by two sets of wetlands in parallel, and then disinfection before it is pumped to discharge into the Roanoke River. Routine maintenance includes managing plant growth; managing detrimentalwildlife population by trapping; and maintaining general access and berm areas. Repairs and improvements performed during 2020: t. Construction completed on a new disinfection system, DEQATC: 027626A05. The design engineer has had to make modifications during the warranty period with the project remaining open. 2. Miscellaneous maintenance/repairs completed at lift stations. 3. Six loads of wetland sludge removed from around effluent pipes to assist with treatment. Sludge returned to lagoons. 4. Multiple truckloads of flowable fill placed to assist with berm erosion and damage. 5. Engineeringfirm hired and design started on large planned upgrade project to improve treatment. 6. Cannery purchased equipment and implemented pH adjustment to be utilized when processing carrots and sweet potato. Summary of System Performance for 2O2O Between January L, 2O2A and December 31,,2020, the Caledonia Wastewater Treatment plant treated an average of 230,000 gallons per day. The wastewater is tested a minimum of 300 times a year to show compliance with the National Pollutant Discharge Elimination System Permit. Project warranty issues related to the new disinfection system caused 2 of the over 300 tested samples to be noncompliant with the permit limits. The first event happened in January related to Aquatic Toxicity and the other event occurred in August related to Fecal Coliform. After identification of these issues, additional procedures were implemented to assure future compliance until such time that the disinfection system improvements are finalized. Certification: I CERTIFY UNDER PENALTY OF LAW THIS REPORT IS COMPLETE AND ACCURATE TO THE BEST OF MY KNOWLEDGE. I FURTHER CERTIFY THAT THIS REPORT HAS BEEN MADE AVAILABLE TO THE USERS OR CUSTOMERS OF THE NAMED SYSTEM AND THAT THOSE USERS HAVE BEEN NOTIFIED OF ITS AVAILABILITY. x/21/2CI21 DATE ORC CALEDON IA CORRECTIONAL FACILITY PRICE