Loading...
HomeMy WebLinkAbout12-09-10_PJD verif_B-5318_SAW-2011-00044 Uffi. tRMY CORPS OF ENGINE* ' FIL-1 COP Y WILMINGTON DISTRICT Action Id. SAW-2011-00044 County: Wake U.S.G.S. Quad:NC-WAKE FOREST NOTIFICATION OF JURISDICTIONAL DETERMINATION Property Owner:NC Department of Transportation Gregory Thorpe Address: 1598 Mail Service Center Raleigh,NC,27699-1598 Telephone: 919.707.6136(Jim Mason) Property description: Size(acres) N/A Nearest Town Wake Forest Nearest Waterway Smith Creek River Basin Upper Neuse.North Carolina. USGS HUC 03020201 Coordinates Latitude:35.929 Longitude:-78.5277 Location description: TIP B-5318;Bridge No. 126 oer Smith Creek on SR 2044(Ligon Mill Road),south of Wake Forest,NC. Indicate Which of the Following Apply: A. Preliminary Determination X Based on preliminary information,there may be waters of the U.S. including wetlands on the above described project area. We strongly suggest you have this property inspected to determine the extent of Department of the Army(DA) jurisdiction.To be considered final,a jurisdictional determination must be verified by the Corps. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process(Reference 33 CFR Part 331). If you wish,you may request an approved JD(which may be appealed),by contacting the Corps district for further instruction.Also,you may provide new information for fiirther consideration by the Corps to reevaluate the JD. B. Approved Determination There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our published regulations,this determination may be relied upon for a period not to exceed five years from the date of this notification. _ There are waters of the U.S. including wetlands on the above described project area subject to the permit requirements of Section 404 of the Clean Water Act(CWA)(33 USC§ 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. _ We strongly suggest you have the waters of the U.S. including wetlands on your project area delineated. Due to the size of your property and/or our present workload,the Corps may not be able to accomplish this wetland delineation in a timely manner. For a more timely delineation,you may wish to obtain a consultant. To be considered final,any delineation must be verified by the Corps. _ The waters of the U.S. including wetlands on your project area have been delineated and the delineation has been verified by the Corps. We strongly suggest you have this delineation surveyed. Upon completion,this survey should be reviewed and verified by the Corps. Once verified,this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which,provided there is no change in the law or our published regulations,may be relied upon for a period not to exceed five years. _ The waters of the U.S. including wetlands have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below on_. Unless there is a change in the law or our published regulations,this determination may be relied upon for a period not to exceed five years from the date of this notification. _ There are no waters of the U.S.,to include wetlands,present on the above described project area which are subject to the permit requirements of Section 404 of the Clean Water Act(33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. Page 1 of 2 Action Id. SAW-2011-00044 Placement of dredged or fill material within waters of the US and/or wetlands without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act(33 USC § 1311). If you have any questions regarding this determination and/or the Corps regulatory program,please contact Eric Alsmever at 919-554-4884 x23/Eric.C.Als mever@usace.army.mil. C. Basis For Determination: The impact area contains relatively permanent waters,with indicators of ordinary high water marks, stream channels of Smith Creek and an unnamed tributary, and nearby wetlands. Smith Creek is a tributary of the Neuse River,a Traditional Navigable Water. D. Remarks: This JD was confirmed by field inspection on 4/21/2012. The drawing on the attached Figure 3, JURISDICTIONAL FEATURES AND TERRESTRIAL COMMUNITIES,B-5318,received by this office June 8,2011, generally depicts the jurisdictional waters of the US within the subject study area. E. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants,or anticipate participation in USDA programs,you should request a certified wetland determination from the local office of the Natural Resources Conservation Service,prior to starting work. Corps Regulatory Official: /'i c 1 S rit 2�yer Date: 9/10/2012 Expiration Da . 9/10/2017 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so,please complete the attached customer Satisfaction Survey or visit http:/lper2.nwp.usace.army.millsurvey.html to complete the survey online. poi i- oco'-�y `�► OFILE COPY , ATTACHMENT PRELIMINARY JURISDICTIONAL DETERMINATION FORM BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR PRELIMINARY JURISDICTIONAL DETERMINATION (JD): B. NAME AND ADDRESS OF PERSON REQUESTING PRELIMINARY JD: Mr. James Mason, N.C. Department of Transportation, 1598 Mail Service Center, Raleigh, NC 27699-1598 C. DISTRICT OFFICE, FILE NAME, AND NUMBER: (NCDOT/B-5318/ Bridge No. 126 on-SR 20 4 [Ligon Mill Rd] k� County) ' P b D. D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: (USE THE ATTACHED TABLE TO DOCUMENT MULTIPLE WATERBODIES AT DIFFERENT SITES) State:NC County/parish/borough: Wake City: Wake Forest Center coordinates of site (lat/long in degree decimal format): Lat. 35.92900 N, Long. -78.5277° W. Universal Transverse Mercator: Name of nearest waterbody: Smith Creek Identify(estimate) amount of waters in the review area: Non-wetland waters: 2 streams, Smith Cr(Stream SA), UT of Smith Cr (Stream SB); linear feet: 200 (SA), 160 (SB); width (ft.) and/or acres: 20-30 (Smith Cr), 1-4 (Stream SB). Cowardin Class: Rivcrine Stream Flow: Perennial Wetlands: 0.30 (Wetland WA); <0.01 (Wetland WB),acres. Cowardin Class: Forested, except for small portion of sewer line,which is Emergent (Wetland WA); Emergent(Wetland WS) Name of any water bodies on the site that have been identified as Section 10 waters: Tidal: Non-Tidal: E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): ❑ Office (Desk) Determination. Date: ❑ Field Determination. Date(s): 1 Y403 D136 1. The Corps of Engineers believes that there may be jurisdictional waters of the United States on the subject site, and the permit applicant or other affected party who requested this preliminary JD is hereby advised of his or her option to request and obtain an approved jurisdictional determination (JD) for that site. Nevertheless, the permit applicant or other person who requested this preliminary JD has declined to exercise the option to obtain an approved JD in this instance and at this time. 2. In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other general permit verification requiring "pre-construction notification" (PCN), or requests verification for a non-reporting NWP or other general permit, and the permit applicant has not requested an approved JD for the activity, the permit applicant is hereby made aware of the following: (1) the permit applicant has elected to seek a permit authorization based on.a preliminary JD, which does.not make an official determination of jurisdictional waters; (2) that the applicant has`the option to request an approved JD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an approved JD could possibly result in less compensatory mitigation being required or different special conditions; (3)that the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) that the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) that undertaking any activity in reliance upon the subject permit authorization without requesting an approved JD constitutes the applicant's acceptance of the use of the preliminary JD, but that either form of JD will be processed as soon as is practicable; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a preliminary JD constitutes agreement that all wetlands and other water bodies on the site affected in any way by that activity are jurisdictional waters of the United States, and precludes any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an approved JD or a preliminary JD, that JD will be processed as soon as is practicable. Further, an approved JD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331, and that in any administrative appeal,jurisdictional issues can be raised (see 33 C.F.R. 331.5(a)(2)). If, during that administrative appeal, it becomes necessary to make an official determination whether CWA jurisdiction exists over a site, or to provide an official delineation of jurisdictional waters on the site, the Corps will provide an approved JD to accomplish that result, as soon as is practicable. This preliminary JD finds that there "may be"waters of the United States on the subject project site, and identifies all aquatic features on the site that could be affected by the proposed activity, based on the following information: 2 OCOL4 y SUPPORTING DATA. Data reviewed for preliminary JD (check all that apply - checked items should be included in case file and, where checked and requested, appropriately reference sources below): ® Maps, plans, plots or plat submitted by or on behalf of the applicant/consultant: Vicinity Map, Project Study Area Map, and Jurisdictional Resources Map submitted by NCDOT_ ® Data sheets prepared/submitted by or on behalf of the app icant/consultant. �79-Office concurs with data sheets/delineation report. D Office does not concur with data sheets/delineation report. ❑ Data sheets prepared by the Corps: ❑ Corps navigable waters' study: ❑ U.S. Geological Survey Hydrologic Atlas: ❑ USGS NHD data. ❑ USGS 8 and 12 digit HUC maps. ® U.S. Geological Survey map(s). Cite scale & quad name:Wake Forest, 1:24,000. ® USDA Natural Resources Conservation Service Soil Survey. Citation:Web Soil Survey website, http://websoilsurvey.nres.usda.gov/app/. National wetlands inventory map(s). Cite name: ❑ State/Local wetland inventory map(s): ❑ FEMA/FIRM maps: ❑ 100-year Floodplain Elevation is: (National Geodectic Vertical Datum of 1929) ❑ Photographs: ❑ Aerial (Name & Date): or ❑ Other(Name & Date): ❑ Previous determination(s). File no. and date of response letter: ® Other information (please specify):JD site visit with USACE on April 21, 2011. IMPORTANT NOTE: The information recorded on this form has not necessarily been verified by the Corps and should not be relied upon for later jurisdictional determinations. r- C Z,z.v 74- y r� �l� 6 16//, Signature and date of Signatu and date of Regulatory Project Manager person requesting preliminary JD (REQUIRED) (REQUIRED, unless obtaining the signature is impracticable) 3 Estimated Site Cowardin amount of Class of number Latitude Longitude Class . aquatic aquatic resource in resource review area Smith 35.9290°N -78.5277°W Riverine 200 lin. ft. Non-section Creek 10 — (SA) perennial Stream 35.9290°N -78.5277°W Riverine 160 lin. ft. Non-section SB 10 — perennial Wetland 35.9290°N -78.5277°W Forested 0.30 ac. Non-section WA 10 —wetland Wetland 35.9290°N -78.5277°W Emergent <0.01 ac. Non-section WB 10 —wetland 4 9u I - L4 SR 2044 (Ligon Mill Road) i � r i a _ r Wetland •,r Wetland WB - Stream SB Smith Creek(Stream SA) 4V� - ' i ` c 95 190 380 570 76Fee 005 Aer", Legend �wL Y Project Study Area FIGURE 3: JURISDICTIONAL FEATURES N _Jurisdictional Streams AND TERRESTRIAL COMMUNITIES ®Jurisdictional Wetlands w E Floodplain Forest -Maintained/Disturbed ® Mixed Pine/Hardwood Forest B-5318, Wake County S