HomeMy WebLinkAboutSW3201202_Comm (Letter of Transmission)_2020122111 1
CDM
Smith
4600 Park Rd, Suite 240
Charlotte, North Carolina 27209
tel: 704 342-4546
December 18, 2020
Mr. Corey Anen, P.E. RECEIVED
Environmental Engineer DEC 2 2020
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources Stormwater Program DENR-LAND QUALITY
512 N. Salisbury Street STORMWATER PERMITTING
Raleigh, NC 27699-1612
Subject: Union County Public Works - Yadkin Regional Water Treatment Plant
Post -Construction Stormwater Permit Application
Dear Mr. Anen:
Union County Public Works (UCPW) proposes to construct the new Yadkin Regional Water
Treatment Plant (WTP) on a 49-acre parcel as part of the Yadkin Regional Water Supply Project
(YRWSP). Enclosed please find an application for a post -construction stormwater permit for the site.
Enclosed are the following:
■ Signed application form and one copy
■ Stormwater Treatment/Management Narrative
■ Figures
■ Calculations
■ 2 copies of plans
■ Soils and Geotechnical Information (geotechnical report is included on CD due to size)
■ Property deed
■ Check in the amount of $505 for permit fee
If you have any questions or require anything further, please do not hesitate to contact me at (704)
342-4546 or at LapsleyjS@cdmsmith.com.
Sincerely,
k1
4
)?at an S. Lapsley, P. , P P
Vice President
CDM Smith Inc.
cc (email): John Shutak, UCPW Tracy Randazzo, HDR
WATER + ENVIRONMENT + TRANSPORTATION + ENERGY + FACILITIES